PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls

XLS spreadsheet 38 KB Posted

Attached to
CDBG-DR City of Edgewater Canal Armoring Construction
Solicitation number
26-B-19KW
Issued by
Volusia County, Florida

About this file

This is a Prime/Subcontractor Form for use with Volusia County's Contract No. C-2014, ITB No. 25-B-##XX, related to construction services for the City of Edgewater Canal Armoring Construction project in Florida. The project is a CDBG-DR funded canal stabilization and improvement initiative intended to aid Volusia County's recovery from Hurricane Ian damage in September 2022. Bidders are required to complete and submit this form as part of their bid proposal, with failure to do so potentially resulting in a non-responsive bid determination. The form must identify all proposed subcontractors and their respective scopes of work, with the prime contractor bearing responsibility for ensuring all subcontractors maintain appropriate licensure. Any subcontractor changes during project execution require prior written approval from the County Project Manager, though such changes cannot alter the total submitted base bid pricing.

The form requires bidders to itemize the dollar value and percentage of work to be performed by the prime contractor and each proposed subcontractor across various anticipated disciplines including electrical, HVAC, plumbing, and landscaping work. All monetary values and work percentages must be entered in green-shaded cells, with total work allocation equaling 100 percent across all entities. The total bid price, inclusive of any required performance or payment bonds, must match the amount listed on the associated Bid Price Sheet. The form will also be utilized to determine local preference eligibility in accordance with Section 2.8, D of the solicitation. This project is funded through a U.S. Department of Housing and Urban Development Community Development Block Grant for Disaster Recovery, with Volusia County's Office of Recovery and Resiliency overseeing the procurement.

View the file

Other files

File Type Posted
CDBG-DR_City_of_Edgewater_Canal_Armoring_Construction_(Addendum_#4_Revision).pdf PDF
CDBG-DR_City_of_Edgewater_Canal_Armoring_Construction_(Addendum_#1_Revision).pdf PDF
EXHIBIT_F_-_BID_PRICE_SHEET.xlsx XLSX spreadsheet
Exhibit_O_-_Army_Corps_of_Engineers_Permit_SAJ-2022-01766_REVISED.pdf PDF
Exhibit_P_-_FDEP_Permit_ST404_428086-001-SFG.pdf PDF
Exhibit_N_-_HEAVY_Wage_Determination.pdf PDF
Exhibit_M_-_Bonding_Requirements_24_CFR_PART_85.36.pdf PDF
Exhibit_L_-_Section_3_Information_&_Forms.pdf PDF
Exhibit_K_-_MWBE_Information_&_Form.pdf PDF
Exhibit_J_-_WH347_Certified_Payroll_Form_January_2025.pdf PDF
Exhibit_I_-_Instructions_for_Completing_Payroll_Form,_WH-347_Updated_January_2025.pdf PDF
Exhibit_H_-_Supplemental_Conditions.pdf PDF
Exhibit_G_-_Project_Sign.pdf PDF
Exhibit_E_-_Specifications.pdf PDF
Exhibit_D_-_Plans.pdf PDF
Exhibit_C_-_Draft_Contract.pdf PDF
Exhibit_B_-_PRIME-SUB_Form.xls XLS spreadsheet
Exhibit_A_-_Required_Types_and_Limits_of_Insurance.pdf PDF
Edgewater_Canal_Armoring_Full_Plans_12.13.23.pdf PDF
APPROVED_Permit.Army_Corps_of_Engineers_SAJ-2022-01766.pdf PDF
APPROVED_Permit.Fla.DEP._ST404_428086-001-SFG.pdf PDF
Travelers_Umbrella_Canal_Bid_Spec_Book_09.25.2025.pdf PDF
Edgewater_-_Canal_Armoring_-_Scope.docx DOCX document
APPROVED_Permit.SJRWMD_7886575.pdf PDF
1-PRIME-SUB_Form_Canal_Armoring.xls XLS spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2014ITB No. 25-B-##XX
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
(Examples: Electrical, HVAC, Plumbing,
Landscaping, etc. for your project)$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%

Sheet2

Sheet3

File details come from the government source that posted it. Updated .