PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls
XLS spreadsheet 38 KB Posted
- Solicitation number
- 26-B-80JJ
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form for Volusia County, Florida, related to Contract No. C-2014 and ITB No. 25-B-##XX for small flooring installations and repairs. The form requires bidders to provide comprehensive information about all proposed subcontractors and the distribution of work between the prime contractor and any subcontractors. Bidders must list the company name, complete address, dollar value, and percentage of work for each entity performing services on the project. The form specifies that failure to complete and return this document may result in a non-responsive bid, and it will be used to determine local preference eligibility as outlined in Section 2.8, D of the solicitation.
The form requires bidders to designate dollar values and work percentages only in the green-shaded cells, with all other cells automatically calculating based on those entries. The total bid amount must match the bid price submitted on the Bid Price Sheet and should equal 100 percent when all prime and subcontractor allocations are totaled. The prime contractor is responsible for ensuring all subcontractors hold appropriate licenses, and any changes to proposed subcontractors during project completion require prior written approval from the County Project Manager. The County reserves the right to clarify subcontractor information but will not permit modifications to the total submitted base bid pricing. The form includes space for the prime contractor's self-performed work and up to fourteen lines for listing subcontractor disciplines, with provision for additional subcontractors if project requirements exceed the listed anticipated disciplines.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB-23-B-113SH-Small_Floor_Repair_and_Replacement.pdf | ||
| ROA_23-B-113SH_Small_Floor_Repair_and_Replacement_SIGNED_(2).pdf | ||
| Volusia_County_Small_Flooring_Installations_and_Repairs.pdf | ||
| Required_FAA_Clauses.pdf | ||
| Volusia_Flooring_Price_Sheet_with_Bidder_Totals_(1).xlsx | XLSX spreadsheet | |
| Volusia_Required_Types_and_Limits_of_Insura..(492424).docx | DOCX document | |
| Scope_of_Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| $ - 0 | 0.00% | |||||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .