The file is a Pricing Work Estimates Excel spreadsheet for an Environmental Spill Response contract. The document provides a detailed pricing structure for a non-personal service contract covering emergency spill response, with a base year and four option years. The pricing template includes numerous line items for personnel (Project Manager, Project Foreman, Equipment Operator, Technician), equipment (Vacuum Truck, Service Truck, Emergency Response Van, Mini Excavator), and disposal services for non-hazardous petroleum contact materials such as water, sludge, booms/PPE, and soil.
The pricing matrix is comprehensive, breaking down hourly rates and quantities for regular and overtime labor, various equipment rentals, and disposal services. Each year (base and options) maintains identical quantities and line items, suggesting a consistent expected workload across the contract period. The spreadsheet is designed for the contractor to input unit prices, with total amounts calculated automatically. This pricing template corresponds to the W9124CQA002 solicitation for emergency spill and environmental response services at Fort Jackson, SC, issued by the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Environmetal Spill Pricing
| The Offeror shall submit total proposed price for completing required work inclusive of all process associated with this requirement. The Offeror costs (direct and indirect) inclusive of profit, all overhead, cost escalation, labor burden, insurance, adjustments to listed prices, general and administrative expenses, travel, subcontractor fees, and all other costs, including but not limited to compliance with environmental laws, preparation of reports, correspondence and documentation required by law or the contract specifications, tax laws, protection and/or moving of Government property, and engineering services. Below are the descriptions of typical services that MAY be required during the period of performance of this contract and is ONLY provided for informational purposes. | ||||
| BASE YEAR | ||||
| Description | Quantity | Unit of Measure | Unit Price | Total Amount |
| Project Manager | 24.00 | HR | $0.00 | $0.00 |
| Project Manager OT | 5.75 | HR | $0.00 | $0.00 |
| Project Foreman | 24.00 | HR | $0.00 | $0.00 |
| Project Foreman OT | 4.25 | HR | $0.00 | $0.00 |
| Equipment Operator | 56.50 | HR | $0.00 | $0.00 |
| Equipment Operator OT | 10.50 | HR | $0.00 | $0.00 |
| Technician | 42.50 | HR | $0.00 | $0.00 |
| Technician OT | 4.25 | HR | $0.00 | $0.00 |
| Vacuum Truck | 49.75 | HR | $0.00 | $0.00 |
| Service Truck | 7.00 | DAY | $0.00 | $0.00 |
| Emergency Response Van | 2.00 | DAY | $0.00 | $0.00 |
| Mini Excavator | 20.75 | HR | $0.00 | $0.00 |
| Roll-Off Box | 3.00 | DAY | $0.00 | $0.00 |
| Roll-Off Frame & Tractor | 5.50 | HR | $0.00 | $0.00 |
| Chemical Sorbent Boom | 10.00 | SECTION | $0.00 | $0.00 |
| Oil Dry | 2.00 | BAG | $0.00 | $0.00 |
| Nitrile Glove Liners | 30.00 | PR | $0.00 | $0.00 |
| 55 Gallon Open Head Drum | 2.00 | EA | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Water | 2800.00 | GAL | $0.00 | $0.00 |
| 15K PSI Hydro-Blaster | 15.00 | HR | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Sludge | 23.14 | TON | $0.00 | $0.00 |
| 5K PSI Power Washer | 1.00 | DAY | $0.00 | $0.00 |
| 15K PSI Hdyro-Biaster | 6.00 | HR | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Booms/PPE | 1.00 | DRUM | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Soil | 21.41 | TON | $0.00 | $0.00 |
| TOTAL | $0.00 | |||
| OPTION YEAR 1 | ||||
| Description | Quantity | Unit of Measure | Unit Price | Total Amount |
| Project Manager | 24.00 | HR | $0.00 | $0.00 |
| Project Manager OT | 5.75 | HR | $0.00 | $0.00 |
| Project Foreman | 24.00 | HR | $0.00 | $0.00 |
| Project Foreman OT | 4.25 | HR | $0.00 | $0.00 |
| Equipment Operator | 56.50 | HR | $0.00 | $0.00 |
| Equipment Operator OT | 10.50 | HR | $0.00 | $0.00 |
| Technician | 42.50 | HR | $0.00 | $0.00 |
| Technician OT | 4.25 | HR | $0.00 | $0.00 |
| Vacuum Truck | 49.75 | HR | $0.00 | $0.00 |
| Service Truck | 7.00 | DAY | $0.00 | $0.00 |
| Emergency Response Van | 2.00 | DAY | $0.00 | $0.00 |
| Mini Excavator | 20.75 | HR | $0.00 | $0.00 |
| Roll-Off Box | 3.00 | DAY | $0.00 | $0.00 |
| Roll-Off Frame & Tractor | 5.50 | HR | $0.00 | $0.00 |
| Chemical Sorbent Boom | 10.00 | SECTION | $0.00 | $0.00 |
| Oil Dry | 2.00 | BAG | $0.00 | $0.00 |
| Nitrile Glove Liners | 30.00 | PR | $0.00 | $0.00 |
| 55 Gallon Open Head Drum | 2.00 | EA | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Water | 2800.00 | GAL | $0.00 | $0.00 |
| 15K PSI Hydro-Blaster | 15.00 | HR | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Sludge | 23.14 | TON | $0.00 | $0.00 |
| 5K PSI Power Washer | 1.00 | DAY | $0.00 | $0.00 |
| 15K PSI Hdyro-Biaster | 6.00 | HR | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Booms/PPE | 1.00 | DRUM | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Soil | 21.41 | TON | $0.00 | $0.00 |
| TOTAL | $0.00 | |||
| OPTION YEAR 2 | ||||
| Description | Quantity | Unit of Measure | Unit Price | Total Amount |
| Project Manager | 24.00 | HR | $0.00 | $0.00 |
| Project Manager OT | 5.75 | HR | $0.00 | $0.00 |
| Project Foreman | 24.00 | HR | $0.00 | $0.00 |
| Project Foreman OT | 4.25 | HR | $0.00 | $0.00 |
| Equipment Operator | 56.50 | HR | $0.00 | $0.00 |
| Equipment Operator OT | 10.50 | HR | $0.00 | $0.00 |
| Technician | 42.50 | HR | $0.00 | $0.00 |
| Technician OT | 4.25 | HR | $0.00 | $0.00 |
| Vacuum Truck | 49.75 | HR | $0.00 | $0.00 |
| Service Truck | 7.00 | DAY | $0.00 | $0.00 |
| Emergency Response Van | 2.00 | DAY | $0.00 | $0.00 |
| Mini Excavator | 20.75 | HR | $0.00 | $0.00 |
| Roll-Off Box | 3.00 | DAY | $0.00 | $0.00 |
| Roll-Off Frame & Tractor | 5.50 | HR | $0.00 | $0.00 |
| Chemical Sorbent Boom | 10.00 | SECTION | $0.00 | $0.00 |
| Oil Dry | 2.00 | BAG | $0.00 | $0.00 |
| Nitrile Glove Liners | 30.00 | PR | $0.00 | $0.00 |
| 55 Gallon Open Head Drum | 2.00 | EA | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Water | 2800.00 | GAL | $0.00 | $0.00 |
| 15K PSI Hydro-Blaster | 15.00 | HR | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Sludge | 23.14 | TON | $0.00 | $0.00 |
| 5K PSI Power Washer | 1.00 | DAY | $0.00 | $0.00 |
| 15K PSI Hdyro-Biaster | 6.00 | HR | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Booms/PPE | 1.00 | DRUM | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Soil | 21.41 | TON | $0.00 | $0.00 |
| TOTAL | $0.00 | |||
| OPTION YEAR 3 | ||||
| Description | Quantity | Unit of Measure | Unit Price | Total Amount |
| Project Manager | 24.00 | HR | $0.00 | $0.00 |
| Project Manager OT | 5.75 | HR | $0.00 | $0.00 |
| Project Foreman | 24.00 | HR | $0.00 | $0.00 |
| Project Foreman OT | 4.25 | HR | $0.00 | $0.00 |
| Equipment Operator | 56.50 | HR | $0.00 | $0.00 |
| Equipment Operator OT | 10.50 | HR | $0.00 | $0.00 |
| Technician | 42.50 | HR | $0.00 | $0.00 |
| Technician OT | 4.25 | HR | $0.00 | $0.00 |
| Vacuum Truck | 49.75 | HR | $0.00 | $0.00 |
| Service Truck | 7.00 | DAY | $0.00 | $0.00 |
| Emergency Response Van | 2.00 | DAY | $0.00 | $0.00 |
| Mini Excavator | 20.75 | HR | $0.00 | $0.00 |
| Roll-Off Box | 3.00 | DAY | $0.00 | $0.00 |
| Roll-Off Frame & Tractor | 5.50 | HR | $0.00 | $0.00 |
| Chemical Sorbent Boom | 10.00 | SECTION | $0.00 | $0.00 |
| Oil Dry | 2.00 | BAG | $0.00 | $0.00 |
| Nitrile Glove Liners | 30.00 | PR | $0.00 | $0.00 |
| 55 Gallon Open Head Drum | 2.00 | EA | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Water | 2800.00 | GAL | $0.00 | $0.00 |
| 15K PSI Hydro-Blaster | 15.00 | HR | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Sludge | 23.14 | TON | $0.00 | $0.00 |
| 5K PSI Power Washer | 1.00 | DAY | $0.00 | $0.00 |
| 15K PSI Hdyro-Biaster | 6.00 | HR | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Booms/PPE | 1.00 | DRUM | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Soil | 21.41 | TON | $0.00 | $0.00 |
| TOTAL | $0.00 | |||
| OPTION YEAR 4 | ||||
| Description | Quantity | Unit of Measure | Unit Price | Total Amount |
| Project Manager | 24.00 | HR | $0.00 | $0.00 |
| Project Manager OT | 5.75 | HR | $0.00 | $0.00 |
| Project Foreman | 24.00 | HR | $0.00 | $0.00 |
| Project Foreman OT | 4.25 | HR | $0.00 | $0.00 |
| Equipment Operator | 56.50 | HR | $0.00 | $0.00 |
| Equipment Operator OT | 10.50 | HR | $0.00 | $0.00 |
| Technician | 42.50 | HR | $0.00 | $0.00 |
| Technician OT | 4.25 | HR | $0.00 | $0.00 |
| Vacuum Truck | 49.75 | HR | $0.00 | $0.00 |
| Service Truck | 7.00 | DAY | $0.00 | $0.00 |
| Emergency Response Van | 2.00 | DAY | $0.00 | $0.00 |
| Mini Excavator | 20.75 | HR | $0.00 | $0.00 |
| Roll-Off Box | 3.00 | DAY | $0.00 | $0.00 |
| Roll-Off Frame & Tractor | 5.50 | HR | $0.00 | $0.00 |
| Chemical Sorbent Boom | 10.00 | SECTION | $0.00 | $0.00 |
| Oil Dry | 2.00 | BAG | $0.00 | $0.00 |
| Nitrile Glove Liners | 30.00 | PR | $0.00 | $0.00 |
| 55 Gallon Open Head Drum | 2.00 | EA | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Water | 2800.00 | GAL | $0.00 | $0.00 |
| 15K PSI Hydro-Blaster | 15.00 | HR | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Sludge | 23.14 | TON | $0.00 | $0.00 |
| 5K PSI Power Washer | 1.00 | DAY | $0.00 | $0.00 |
| 15K PSI Hdyro-Biaster | 6.00 | HR | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Booms/PPE | 1.00 | DRUM | $0.00 | $0.00 |
| Disposal Of Non Hazardous Petroleum Contact Soil | 21.41 | TON | $0.00 | $0.00 |
| TOTAL | $0.00 | |||
| TOTAL | $0.00 |