This document is a Pricing Sheet for the Raw Water Line Cleaning & Restoration Solicitation No. N40085-24-R-2733 at MCB Camp Lejeune, North Carolina, Project No. 24-0023.

The Pricing Sheet contains four Exhibit Line Item Numbers (ELINs) for the contractors to provide pricing. ELIN 0001 is the base bid for the Hadnot Point Raw Distribution System work, while ELINs 0002, 0003, and 0004 are bid options for the Holcomb Blvd. Raw Distribution System, CCTV work on both systems, and connection to AC pipe, respectively. Contractors must submit pricing for all ELINs, and the government will evaluate the total of all four ELINs for award purposes, though it is not obligated to exercise the options. The Pricing Sheet also includes notes on markups, evaluation of options, and instructions that failure to propose on all line items may result in the offer being rejected as non-responsive.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Raw Water Line Cleaning & RestorationSolicitation No. N40085-24-R-2733
MCB Camp Lejeune, North CarolinaProject No. 24-0023

PRICING SHEET

Under the line items furnished, the offers shall state prices for each Exhibit Line Item Number (ELIN) given hereinafter. ELIN 0001 will be awarded at the time of award and the remaining ELINS will be options that will be awarded at the time of award or not at all.

ELIN 0001

Price includes completing all work associated with Base Bid, Phase One, Hadnot Point Raw Distribution System in accordance with the provided drawings and specifications, but excluding work described in ELIN 0002, 0003, and 0004. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0002

Price includes completing all work associated with Bid Option, Phase Two, Holcomb Blvd. Raw Distribution System in accordance with the provided drawings and specifications, but excluding work described in ELIN 0001, 0003, and 0004. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0003

Price includes completing all work associated with Bid Option, CCTV (both systems) in accordance with the provided drawings and specifications, but excluding work described in ELIN 0001, 0002, and 0004. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0004

Price includes completing all work associated with Bid Option/Item, Connection to AC Pipe in accordance with the provided drawings and specifications, but excluding work described in ELIN 0001, 0002, and 0003. The price for this line item should include all applicable costs, overhead and profit for this work.

TOTAL ELINs 0001 - 0004: $______________________________________

Notes A. Offers must be submitted on all line items. Failure to propose on all line items may result in the offer being rejected as non-responsive.

B. ELINs shall include all markups (overhead, labor burden, and profit).

C. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for ELINs 0001 through 0004. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).