Text version
Interior Cleaning 0001 - 0002
| CLIN | Description | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 0001 / 0002 | Interior Cleaning | ||||
| 01 | Interior Cleaning (2-Bedroom) | EA | 15 | ||
| 02 | Interior Cleaning (3-Bedroom) | EA | 15 | ||
| 03 | Interior Cleaning (4-Bedroom) | EA | 10 | ||
| 04 | Interior Cleaning (4-Bedroom Attic 424/A5/C6 | EA | 1 | ||
| 05 | Interior Cleaning (5-Bedroom Stairway Comb) 424 / B7 / B8 | EA | 1 | ||
| 06 | Interior Cleaning (4- Bedroom Duplex, 400 R) | EA | 1 | ||
| 07 | Interior Cleaning (4-Bedroom Duplex 400L) | EA | 1 | ||
| 08 | Interior Cleaning (4-Bedroom Com. Single House | EA | 1 | ||
| 09 | Interior Cleaning (4-Bedroom SOQ Single House) | EA | 3 | ||
| 10 | Interior Cleaning (3-Bedroom Dwelling JENL) | EA | 34 | ||
| 11 | Interior Cleaning (3-Bedroom Dwelling SENL) | EA | 5 | ||
| 12 | Interior Cleaning (3-Bedroom Dwelling/Triplex FGO) | EA | 3 | ||
| 13 | Interior Cleaning (4-Bedroom Dwelling / Triplex JENL) | EA | 36 | ||
| 14 | Interior Cleaning (4-Bedroom Dwelling SENL) | EA | 5 | ||
| 15 | Interior Cleaning (4-Bedroom Dwelling CGO) | EA | 2 | ||
| 16 | Interior Cleaning (4-Bedroom Dwelling FGO) | EA | 2 | ||
| 17 | Interior Cleaning (4-Bedroom Dwelling Disabled) | EA | 4 | ||
| 18 | Interior Cleaning GOQ, Geilenkirchen, Heinsbergerstr.14 | EA | 1 | ||
| 19 | Interior Cleaning Stove | EA | 4 | ||
| 20 | Interior Cleaning Refrigerator | EA | 4 | ||
| 21 | Interior Cleaning Dishwasher | EA | 4 | ||
| 22 | Interior Cleaning of Dryer | EA | 4 | ||
| 23 | Interior Cleaning Washing Machine | EA | 4 | ||
| 24 | Interior Cleaning Hourly Wage Rate for Licensed Journeyman | EA | 30 | ||
| 25 | Interior Cleaning Hourly Wage Rate for Licensed Apprentice Helper | EA | 30 | ||
| 26 | Interior Cleaning Balcony | EA | 11 | ||
| Total amount: |
Painting Maintenance 0003
| CLIN | Decription | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 0003 | PAINTING MAINTENANCE | ||||
| 01 | 2-Bedroom Apartment | EA | 15 | ||
| 02 | 3-Bedroom Apartment | EA | 15 | ||
| 03 | 4-Bedroom Apartment | EA | 10 | ||
| 04 | 4-Bedroom Apartment Attic 424 / A5 / C6 | EA | 1 | ||
| 05 | 5-Bedroom Apartment Stairway Combo 424 / B7 / B8 | EA | 1 | ||
| 06 | 4-Bedroom Duplex (MFH) 400R | EA | 1 | ||
| 07 | 4-Bedroom Duplex (SENL) 400L | EA | 1 | ||
| 08 | 4-Bedroom Unit Com - Single House | EA | 1 | ||
| 09 | SOQ Single House | EA | 3 | ||
| 10 | 3-Bedroom Dwelling JENL | EA | 34 | ||
| 11 | 3-Bedromm Dwelling SENL | EA | 5 | ||
| 12 | 3-Bedroom Dwelling / Triplex FGO | EA | 3 | ||
| 13 | 4-Bedroom Dwelling / Triplex JENL | EA | 36 | ||
| 14 | 4-Bedroom Dwelling / SENL | EA | 5 | ||
| 15 | 4-Bedroom Dwelling CGO | EA | 2 | ||
| 16 | 4-Bedroom Dwelling FGO | EA | 2 | ||
| 17 | 4-Bedroom Dwelling Disabled | EA | 4 | ||
| 18 | GOQ, Geilenkirchen Heinsbergerstr. 14 | EA | 1 | ||
| 19 | Interior Painting for above Apartments / units per sqm | Square Meter | 500 | ||
| 20 | Removal of old dispersion paint | Square Meter | 125 | ||
| 21 | Steep in lye old oil paint | Square Meter | 125 | ||
| 22 | Application of primer | Square Meter | 300 | ||
| 23 | Acrylic Joint Sealing | Linear Meter | 125 | ||
| 24 | Silicon Joint Sealing | Linear Meter | 125 | ||
| 25 | Hourly Wage Rate Licensed Journeyman | Hours | 30 | ||
| 26 | Hourly Wage Rate Apprentice Helper | Hours | 30 | ||
| Total amount: |
Flooring Maintenance 0004
| CLIN | Decription | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 0004 | FLOORING MAINTENANCE | ||||
| 01 | Sanding and Sealing 4-Bedroom Duplex 400 R | EA | 1 | ||
| 02 | Sanding and Sealing 4-Bedroom Duplex 400 L | EA | 1 | ||
| 03 | Sanding and Sealing of Stairs Treads and Landing | Houses | 50 | ||
| 04 | Sanding and Sealing of Hardwood Flooring per room | Square Meter | 113 | ||
| 05 | Replace damaged and / or defective carpet flooring | Square Meter | 100 | ||
| 06 | Remove Existing tiles and disposal IAW Host National Law | Square Meter | 300 | ||
| 07 | Prepare existing floor to receive new floor tiles (to include sanding, primer, leveling component, etc. | Square Meter | 300 | ||
| 08 | Install floor tiles including baseboards IAW DIN 18352 | Square Meter | 300 | ||
| 09 | Haro Fertigparkett flooring to include removal and disposal of old flooring | Square Meter | 50 | ||
| 10 | Replacement of linoleum covering to include removal and disposal | Square Meter | 50 | ||
| 11 | Repair damaged wood sub-floor | Square Meter | 50 | ||
| 12 | Repair water damaged wood sub-floor | Square Meter | 50 | ||
| 13 | Repair of concrete sub-floor | Square Meter | 23 | ||
| 14 | Install new PVC flooring to welding of the joints | Square Meter | 38 | ||
| 15 | 2 X filler for sub-flooring including primer and sanding off | Square Meter | 23 | ||
| 16 | PVC baseboard (height - 6 cm) | Linear Meter | 30 | ||
| 17 | PVC baseboard (height - 10 cm) | Linear Meter | 53 | ||
| 18 | Hourly Wage Rate Licensed Journeyman | Hours | 8 | ||
| 19 | Hourly Wage Rate Apprentice Helper | Hours | 11 | ||
| 20 | Carpet to tile - 3 Bedroom Dwelling JENL | EA | 3 | ||
| 21 | Carpet to tile - 4 Bedroom Dwelling JENL | EA | 2 | ||
| 22 | Carpet to tile - 4 Bedroom Dwelling SENL | EA | 1 | ||
| Total amount: |
0005 - 0006 - 0007
| CLIN | Decription | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 0005 | STAIRWELL AND COMMON AREA CLEANING | ||||
| 01 | Cleaning of stairwells and common areas 4 buildings / 3 stairwells per building (4 x 12 months) | EA | 48 | ||
| 0006 | TRASH RECEPTACLE EMPTYING | ||||
| 01 | Trash receptacle emptying total number twenty (20) | Months | 12 | ||
| 0007 | DOG WASTE BAG DISPENSER | ||||
| 01 | Dog waste bag dispenser fill up - total number eight (8) | Months | 12 | ||
| Total amount: |
Interior Cleaning 1001 - 1002
| CLIN | Description | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 1001 / 1002 | Interior Cleaning | ||||
| 01 | Interior Cleaning (2-Bedroom) | EA | 15 | ||
| 02 | Interior Cleaning (3-Bedroom) | EA | 15 | ||
| 03 | Interior Cleaning (4-Bedroom) | EA | 10 | ||
| 04 | Interior Cleaning (4-Bedroom Attic) 424/A5/C6 | EA | 1 | ||
| 05 | Interior Cleaning (5-Bedroom Stairway Comb) 424 / B7 / B8 | EA | 1 | ||
| 06 | Interior Cleaning (4- Bedroom Duplex, 400 R) | EA | 1 | ||
| 07 | Interior Cleaning (4-Bedroom Duplex 400L) | EA | 1 | ||
| 08 | Interior Cleaning (4-Bedroom Com. Single House | EA | 1 | ||
| 09 | Interior Cleaning (4-Bedroom SOQ Single House) | EA | 3 | ||
| 10 | Interior Cleaning (3-Bedroom Dwelling JENL) | EA | 34 | ||
| 11 | Interior Cleaning (3-Bedroom Dwelling SENL) | EA | 5 | ||
| 12 | Interior Cleaning (3-Bedroom Dwelling/Triplex FGO) | EA | 3 | ||
| 13 | Interior Cleaning (4-Bedroom Dwelling / Triplex JENL) | EA | 36 | ||
| 14 | Interior Cleaning (4-Bedroom Dwelling SENL) | EA | 5 | ||
| 15 | Interior Cleaning (4-Bedroom Dwelling CGO) | EA | 2 | ||
| 16 | Interior Cleaning (4-Bedroom Dwelling FGO) | EA | 2 | ||
| 17 | Interior Cleaning (4-Bedroom Dwelling Disabled) | EA | 4 | ||
| 18 | Interior Cleaning GOQ, Geilenkirchen, Heinsbergerstr.14 | EA | 1 | ||
| 19 | Interior Cleaning Stove | EA | 4 | ||
| 20 | Interior Cleaning Refrigerator | EA | 4 | ||
| 21 | Interior Cleaning Dishwasher | EA | 4 | ||
| 22 | Interior Cleaning of Dryer | EA | 4 | ||
| 23 | Interior Cleaning Washing Machine | EA | 4 | ||
| 24 | Interior Cleaning Hourly Wage Rate for Licensed Journeyman | EA | 30 | ||
| 25 | Interior Cleaning Hourly Wage Rate for Licensed Apprentice Helper | EA | 30 | ||
| 26 | Interior Cleaning Balcony | EA | 11 | ||
| Total amount: |
Painting Maintenance 1003
| CLIN | Decription | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 1003 | PAINTING MAINTENANCE | ||||
| 01 | 2-Bedroom Apartment | EA | 15 | ||
| 02 | 3-Bedroom Apartment | EA | 15 | ||
| 03 | 4-Bedroom Apartment | EA | 10 | ||
| 04 | 4-Bedroom Apartment Attic 424 / A5 / C6 | EA | 1 | ||
| 05 | 5-Bedroom Apartment Stairway Combo 424 / B7 / B8 | EA | 1 | ||
| 06 | 4-Bedroom Duplex (MFH) 400R | EA | 1 | ||
| 07 | 4-Bedroom Duplex (SENL) 400L | EA | 1 | ||
| 08 | 4-Bedroom Unit Com - Single House | EA | 1 | ||
| 09 | SOQ Single House | EA | 3 | ||
| 10 | 3-Bedroom Dwelling JENL | EA | 34 | ||
| 11 | 3-Bedromm Dwelling SENL | EA | 5 | ||
| 12 | 3-Bedroom Dwelling / Triplex FGO | EA | 3 | ||
| 13 | 4-Bedroom Dwelling / Triplex JENL | EA | 36 | ||
| 14 | 4-Bedroom Dwelling / SENL | EA | 5 | ||
| 15 | 4-Bedroom Dwelling CGO | EA | 2 | ||
| 16 | 4-Bedroom Dwelling FGO | EA | 2 | ||
| 17 | 4-Bedroom Dwelling Disabled | EA | 4 | ||
| 18 | GOQ, Geilenkirchen Heinsbergerstr. 14 | EA | 1 | ||
| 19 | Interior Painting for above Apartments / units per sqm | Square Meter | 500 | ||
| 20 | Removal of old dispersion paint | Square Meter | 125 | ||
| 21 | Steep in lye old oil paint | Square Meter | 125 | ||
| 22 | Application of primer | Square Meter | 300 | ||
| 23 | Acrylic Joint Sealing | Linear Meter | 125 | ||
| 24 | Silicon Joint Sealing | Linear Meter | 125 | ||
| 25 | Hourly Wage Rate Licensed Journeyman | Hours | 30 | ||
| 26 | Hourly Wage Rate Apprentice Helper | Hours | 30 | ||
| Total amount: |
Flooring Maintenance 1004
| CLIN | Decription | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 1004 | FLOORING MAINTENANCE | ||||
| 01 | Sanding and Sealing 4-Bedroom Duplex 400 R | EA | 1 | ||
| 02 | Sanding and Sealing 4-Bedroom Duplex 400 L | EA | 1 | ||
| 03 | Sanding and Sealing of Stairs Treads and Landing | Houses | 50 | ||
| 04 | Sanding and Sealing of Hardwood Flooring per room | Square Meter | 113 | ||
| 05 | Replace damaged and / or defective carpet flooring | Square Meter | 100 | ||
| 06 | Remove Existing tiles and disposal IAW Host National Law | Square Meter | 300 | ||
| 07 | Prepare existing floor to receive new floor tiles (to include sanding, primer, leveling component, etc. | Square Meter | 300 | ||
| 08 | Install floor tiles including baseboards IAW DIN 18352 | Square Meter | 300 | ||
| 09 | Haro Fertigparkett flooring to include removal and disposal of old flooring | Square Meter | 50 | ||
| 10 | Replacement of linoleum covering to include removal and disposal | Square Meter | 50 | ||
| 11 | Repair damaged wood sub-floor | Square Meter | 50 | ||
| 12 | Repair water damaged wood sub-floor | Square Meter | 50 | ||
| 13 | Repair of concrete sub-floor | Square Meter | 23 | ||
| 14 | Install new PVC flooring to welding of the joints | Square Meter | 38 | ||
| 15 | 2 X filler for sub-flooring including primer and sanding off | Square Meter | 23 | ||
| 16 | PVC baseboard (height - 6 cm) | Linear Meter | 30 | ||
| 17 | PVC baseboard (height - 10 cm) | Linear Meter | 53 | ||
| 18 | Hourly Wage Rate Licensed Journeyman | Hours | 8 | ||
| 19 | Hourly Wage Rate Apprentice Helper | Hours | 11 | ||
| 20 | Carpet to tile - 3 Bedroom Dwelling JENL | EA | 3 | ||
| 21 | Carpet to tile - 4 Bedroom Dwelling JENL | EA | 2 | ||
| 22 | Carpet to tile - 4 Bedroom Dwelling SENL | EA | 1 | ||
| Total amount: |
1005 - 1006 - 1007
| CLIN | Decription | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 1005 | STAIRWELL AND COMMON AREA CLEANING | ||||
| 01 | Cleaning of stairwells and common areas 4 buildings / 3 stairwells per building (4 x 12 months) | EA | 48 | ||
| 1006 | TRASH RECEPTACLE EMPTYING | ||||
| 01 | Trash receptacle emptying total number twenty (20) | Months | 12 | ||
| 1007 | DOG WASTE BAG DISPENSER | ||||
| 01 | Dog waste bag dispenser fill up - total number eight (8) | Months | 12 | ||
| Total amount: |
Interior Cleaning 2001 - 2002
| CLIN | Description | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 2001 / 2002 | Interior Cleaning | ||||
| 01 | Interior Cleaning (2-Bedroom) | EA | 15 | ||
| 02 | Interior Cleaning (3-Bedroom) | EA | 15 | ||
| 03 | Interior Cleaning (4-Bedroom) | EA | 10 | ||
| 04 | Interior Cleaning (4-Bedroom Attic) 424/A5/C6 | EA | 1 | ||
| 05 | Interior Cleaning (5-Bedroom Stairway Comb) 424 / B7 / B8 | EA | 1 | ||
| 06 | Interior Cleaning (4- Bedroom Duplex, 400 R) | EA | 1 | ||
| 07 | Interior Cleaning (4-Bedroom Duplex 400L) | EA | 1 | ||
| 08 | Interior Cleaning (4-Bedroom Com. Single House | EA | 1 | ||
| 09 | Interior Cleaning (4-Bedroom SOQ Single House) | EA | 3 | ||
| 10 | Interior Cleaning (3-Bedroom Dwelling JENL) | EA | 34 | ||
| 11 | Interior Cleaning (3-Bedroom Dwelling SENL) | EA | 5 | ||
| 12 | Interior Cleaning (3-Bedroom Dwelling/Triplex FGO) | EA | 3 | ||
| 13 | Interior Cleaning (4-Bedroom Dwelling / Triplex JENL) | EA | 36 | ||
| 14 | Interior Cleaning (4-Bedroom Dwelling SENL) | EA | 5 | ||
| 15 | Interior Cleaning (4-Bedroom Dwelling CGO) | EA | 2 | ||
| 16 | Interior Cleaning (4-Bedroom Dwelling FGO) | EA | 2 | ||
| 17 | Interior Cleaning (4-Bedroom Dwelling Disabled) | EA | 4 | ||
| 18 | Interior Cleaning GOQ, Geilenkirchen, Heinsbergerstr.14 | EA | 1 | ||
| 19 | Interior Cleaning Stove | EA | 4 | ||
| 20 | Interior Cleaning Refrigerator | EA | 4 | ||
| 21 | Interior Cleaning Dishwasher | EA | 4 | ||
| 22 | Interior Cleaning of Dryer | EA | 4 | ||
| 23 | Interior Cleaning Washing Machine | EA | 4 | ||
| 24 | Interior Cleaning Hourly Wage Rate for Licensed Journeyman | EA | 30 | ||
| 25 | Interior Cleaning Hourly Wage Rate for Licensed Apprentice Helper | EA | 30 | ||
| 26 | Interior Cleaning Balcony | EA | 11 | ||
| Total amount: |
Painting Maintenance 2003
| CLIN | Decription | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 2003 | PAINTING MAINTENANCE | ||||
| 01 | 2-Bedroom Apartment | EA | 15 | ||
| 02 | 3-Bedroom Apartment | EA | 15 | ||
| 03 | 4-Bedroom Apartment | EA | 10 | ||
| 04 | 4-Bedroom Apartment Attic 424 / A5 / C6 | EA | 1 | ||
| 05 | 5-Bedroom Apartment Stairway Combo 424 / B7 / B8 | EA | 1 | ||
| 06 | 4-Bedroom Duplex (MFH) 400R | EA | 1 | ||
| 07 | 4-Bedroom Duplex (SENL) 400L | EA | 1 | ||
| 08 | 4-Bedroom Unit Com - Single House | EA | 1 | ||
| 09 | SOQ Single House | EA | 3 | ||
| 10 | 3-Bedroom Dwelling JENL | EA | 34 | ||
| 11 | 3-Bedromm Dwelling SENL | EA | 5 | ||
| 12 | 3-Bedroom Dwelling / Triplex FGO | EA | 3 | ||
| 13 | 4-Bedroom Dwelling / Triplex JENL | EA | 36 | ||
| 14 | 4-Bedroom Dwelling / SENL | EA | 5 | ||
| 15 | 4-Bedroom Dwelling CGO | EA | 2 | ||
| 16 | 4-Bedroom Dwelling FGO | EA | 2 | ||
| 17 | 4-Bedroom Dwelling Disabled | EA | 4 | ||
| 18 | GOQ, Geilenkirchen Heinsbergerstr. 14 | EA | 1 | ||
| 19 | Interior Painting for above Apartments / units per sqm | Square Meter | 500 | ||
| 20 | Removal of old dispersion paint | Square Meter | 125 | ||
| 21 | Steep in lye old oil paint | Square Meter | 125 | ||
| 22 | Application of primer | Square Meter | 300 | ||
| 23 | Acrylic Joint Sealing | Linear Meter | 125 | ||
| 24 | Silicon Joint Sealing | Linear Meter | 125 | ||
| 25 | Hourly Wage Rate Licensed Journeyman | Hours | 30 | ||
| 26 | Hourly Wage Rate Apprentice Helper | Hours | 30 | ||
| Total amount: |
Flooring Maintenance 2004
| CLIN | Decription | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 2004 | FLOORING MAINTENANCE | ||||
| 01 | Sanding and Sealing 4-Bedroom Duplex 400 R | EA | 1 | ||
| 02 | Sanding and Sealing 4-Bedroom Duplex 400 L | EA | 1 | ||
| 03 | Sanding and Sealing of Stairs Treads and Landing | Houses | 50 | ||
| 04 | Sanding and Sealing of Hardwood Flooring per room | Square Meter | 113 | ||
| 05 | Replace damaged and / or defective carpet flooring | Square Meter | 100 | ||
| 06 | Remove Existing tiles and disposal IAW Host National Law | Square Meter | 300 | ||
| 07 | Prepare existing floor to receive new floor tiles (to include sanding, primer, leveling component, etc. | Square Meter | 300 | ||
| 08 | Install floor tiles including baseboards IAW DIN 18352 | Square Meter | 300 | ||
| 09 | Haro Fertigparkett flooring to include removal and disposal of old flooring | Square Meter | 50 | ||
| 10 | Replacement of linoleum covering to include removal and disposal | Square Meter | 50 | ||
| 11 | Repair damaged wood sub-floor | Square Meter | 50 | ||
| 12 | Repair water damaged wood sub-floor | Square Meter | 50 | ||
| 13 | Repair of concrete sub-floor | Square Meter | 23 | ||
| 14 | Install new PVC flooring to welding of the joints | Square Meter | 38 | ||
| 15 | 2 X filler for sub-flooring including primer and sanding off | Square Meter | 23 | ||
| 16 | PVC baseboard (height - 6 cm) | Linear Meter | 30 | ||
| 17 | PVC baseboard (height - 10 cm) | Linear Meter | 53 | ||
| 18 | Hourly Wage Rate Licensed Journeyman | Hours | 8 | ||
| 19 | Hourly Wage Rate Apprentice Helper | Hours | 11 | ||
| 20 | Carpet to tile - 3 Bedroom Dwelling JENL | EA | 3 | ||
| 21 | Carpet to tile - 4 Bedroom Dwelling JENL | EA | 2 | ||
| 22 | Carpet to tile - 4 Bedroom Dwelling SENL | EA | 1 | ||
| Total amount: |
2005 - 2006 - 2007
| CLIN | Decription | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 2005 | STAIRWELL AND COMMON AREA CLEANING | ||||
| 01 | Cleaning of stairwells and common areas 4 buildings / 3 stairwells per building (4 x 12 months) | EA | 48 | ||
| 2006 | TRASH RECEPTACLE EMPTYING | ||||
| 01 | Trash receptacle emptying total number twenty (20) | Months | 12 | ||
| 2007 | DOG WASTE BAG DISPENSER | ||||
| 01 | Dog waste bag dispenser fill up - total number eight (8) | Months | 12 | ||
| Total amount: |
Interior Cleaning 3001 - 3002
| CLIN | Description | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 3001 / 3002 | Interior Cleaning | ||||
| 01 | Interior Cleaning (2-Bedroom) | EA | 15 | ||
| 02 | Interior Cleaning (3-Bedroom) | EA | 15 | ||
| 03 | Interior Cleaning (4-Bedroom) | EA | 10 | ||
| 04 | Interior Cleaning (4-Bedroom Attic) 424/A5/C6 | EA | 1 | ||
| 05 | Interior Cleaning (5-Bedroom Stairway Comb) 424 / B7 / B8 | EA | 1 | ||
| 06 | Interior Cleaning (4- Bedroom Duplex, 400 R) | EA | 1 | ||
| 07 | Interior Cleaning (4-Bedroom Duplex 400L) | EA | 1 | ||
| 08 | Interior Cleaning (4-Bedroom Com. Single House | EA | 1 | ||
| 09 | Interior Cleaning (4-Bedroom SOQ Single House) | EA | 3 | ||
| 10 | Interior Cleaning (3-Bedroom Dwelling JENL) | EA | 34 | ||
| 11 | Interior Cleaning (3-Bedroom Dwelling SENL) | EA | 5 | ||
| 12 | Interior Cleaning (3-Bedroom Dwelling/Triplex FGO) | EA | 3 | ||
| 13 | Interior Cleaning (4-Bedroom Dwelling / Triplex JENL) | EA | 36 | ||
| 14 | Interior Cleaning (4-Bedroom Dwelling SENL) | EA | 5 | ||
| 15 | Interior Cleaning (4-Bedroom Dwelling CGO) | EA | 2 | ||
| 16 | Interior Cleaning (4-Bedroom Dwelling FGO) | EA | 2 | ||
| 17 | Interior Cleaning (4-Bedroom Dwelling Disabled) | EA | 4 | ||
| 18 | Interior Cleaning GOQ, Geilenkirchen, Heinsbergerstr.14 | EA | 1 | ||
| 19 | Interior Cleaning Stove | EA | 4 | ||
| 20 | Interior Cleaning Refrigerator | EA | 4 | ||
| 21 | Interior Cleaning Dishwasher | EA | 4 | ||
| 22 | Interior Cleaning of Dryer | EA | 4 | ||
| 23 | Interior Cleaning Washing Machine | EA | 4 | ||
| 24 | Interior Cleaning Hourly Wage Rate for Licensed Journeyman | EA | 30 | ||
| 25 | Interior Cleaning Hourly Wage Rate for Licensed Apprentice Helper | EA | 30 | ||
| 26 | Interior Cleaning Balcony | EA | 11 | ||
| Total amount: |
Painting Maintenance 3003
| CLIN | Decription | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 3003 | PAINTING MAINTENANCE | ||||
| 01 | 2-Bedroom Apartment | EA | 15 | ||
| 02 | 3-Bedroom Apartment | EA | 15 | ||
| 03 | 4-Bedroom Apartment | EA | 10 | ||
| 04 | 4-Bedroom Apartment Attic 424 / A5 / C6 | EA | 1 | ||
| 05 | 5-Bedroom Apartment Stairway Combo 424 / B7 / B8 | EA | 1 | ||
| 06 | 4-Bedroom Duplex (MFH) 400R | EA | 1 | ||
| 07 | 4-Bedroom Duplex (SENL) 400L | EA | 1 | ||
| 08 | 4-Bedroom Unit Com - Single House | EA | 1 | ||
| 09 | SOQ Single House | EA | 3 | ||
| 10 | 3-Bedroom Dwelling JENL | EA | 34 | ||
| 11 | 3-Bedromm Dwelling SENL | EA | 5 | ||
| 12 | 3-Bedroom Dwelling / Triplex FGO | EA | 3 | ||
| 13 | 4-Bedroom Dwelling / Triplex JENL | EA | 36 | ||
| 14 | 4-Bedroom Dwelling / SENL | EA | 5 | ||
| 15 | 4-Bedroom Dwelling CGO | EA | 2 | ||
| 16 | 4-Bedroom Dwelling FGO | EA | 2 | ||
| 17 | 4-Bedroom Dwelling Disabled | EA | 4 | ||
| 18 | GOQ, Geilenkirchen Heinsbergerstr. 14 | EA | 1 | ||
| 19 | Interior Painting for above Apartments / units per sqm | Square Meter | 500 | ||
| 20 | Removal of old dispersion paint | Square Meter | 125 | ||
| 21 | Steep in lye old oil paint | Square Meter | 125 | ||
| 22 | Application of primer | Square Meter | 300 | ||
| 23 | Acrylic Joint Sealing | Linear Meter | 125 | ||
| 24 | Silicon Joint Sealing | Linear Meter | 125 | ||
| 25 | Hourly Wage Rate Licensed Journeyman | Hours | 30 | ||
| 26 | Hourly Wage Rate Apprentice Helper | Hours | 30 | ||
| Total amount: |
Flooring Maintenance 3004
| CLIN | Decription | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 3004 | FLOORING MAINTENANCE | ||||
| 01 | Sanding and Sealing 4-Bedroom Duplex 400 R | EA | 1 | ||
| 02 | Sanding and Sealing 4-Bedroom Duplex 400 L | EA | 1 | ||
| 03 | Sanding and Sealing of Stairs Treads and Landing | Houses | 50 | ||
| 04 | Sanding and Sealing of Hardwood Flooring per room | Square Meter | 113 | ||
| 05 | Replace damaged and / or defective carpet flooring | Square Meter | 100 | ||
| 06 | Remove Existing tiles and disposal IAW Host National Law | Square Meter | 300 | ||
| 07 | Prepare existing floor to receive new floor tiles (to include sanding, primer, leveling component, etc. | Square Meter | 300 | ||
| 08 | Install floor tiles including baseboards IAW DIN 18352 | Square Meter | 300 | ||
| 09 | Haro Fertigparkett flooring to include removal and disposal of old flooring | Square Meter | 50 | ||
| 10 | Replacement of linoleum covering to include removal and disposal | Square Meter | 50 | ||
| 11 | Repair damaged wood sub-floor | Square Meter | 50 | ||
| 12 | Repair water damaged wood sub-floor | Square Meter | 50 | ||
| 13 | Repair of concrete sub-floor | Square Meter | 23 | ||
| 14 | Install new PVC flooring to welding of the joints | Square Meter | 38 | ||
| 15 | 2 X filler for sub-flooring including primer and sanding off | Square Meter | 23 | ||
| 16 | PVC baseboard (height - 6 cm) | Linear Meter | 30 | ||
| 17 | PVC baseboard (height - 10 cm) | Linear Meter | 53 | ||
| 18 | Hourly Wage Rate Licensed Journeyman | Hours | 8 | ||
| 19 | Hourly Wage Rate Apprentice Helper | Hours | 11 | ||
| 20 | Carpet to tile - 3 Bedroom Dwelling JENL | EA | 3 | ||
| 21 | Carpet to tile - 4 Bedroom Dwelling JENL | EA | 2 | ||
| 22 | Carpet to tile - 4 Bedroom Dwelling SENL | EA | 1 | ||
| Total amount: |
3005 - 3006 - 3007
| CLIN | Decription | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 3005 | STAIRWELL AND COMMON AREA CLEANING | ||||
| 01 | Cleaning of stairwells and common areas 4 buildings / 3 stairwells per building (4 x 12 months) | EA | 48 | ||
| 3006 | TRASH RECEPTACLE EMPTYING | ||||
| 01 | Trash receptacle emptying total number twenty (20) | Months | 12 | ||
| 3007 | DOG WASTE BAG DISPENSER | ||||
| 01 | Dog waste bag dispenser fill up - total number eight (8) | Months | 12 | ||
| Total amount: |
Interior Cleaning 4001 - 4002
| CLIN | Description | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 4001 / 4002 | Interior Cleaning | ||||
| 01 | Interior Cleaning (2-Bedroom) | EA | 15 | ||
| 02 | Interior Cleaning (3-Bedroom) | EA | 15 | ||
| 03 | Interior Cleaning (4-Bedroom) | EA | 10 | ||
| 04 | Interior Cleaning (4-Bedroom Attic) 424/A5/C6 | EA | 1 | ||
| 05 | Interior Cleaning (5-Bedroom Stairway Comb) 424 / B7 / B8 | EA | 1 | ||
| 06 | Interior Cleaning (4- Bedroom Duplex, 400 R) | EA | 1 | ||
| 07 | Interior Cleaning (4-Bedroom Duplex 400L) | EA | 1 | ||
| 08 | Interior Cleaning (4-Bedroom Com. Single House | EA | 1 | ||
| 09 | Interior Cleaning (4-Bedroom SOQ Single House) | EA | 3 | ||
| 10 | Interior Cleaning (3-Bedroom Dwelling JENL) | EA | 34 | ||
| 11 | Interior Cleaning (3-Bedroom Dwelling SENL) | EA | 5 | ||
| 12 | Interior Cleaning (3-Bedroom Dwelling/Triplex FGO) | EA | 3 | ||
| 13 | Interior Cleaning (4-Bedroom Dwelling / Triplex JENL) | EA | 36 | ||
| 14 | Interior Cleaning (4-Bedroom Dwelling SENL) | EA | 5 | ||
| 15 | Interior Cleaning (4-Bedroom Dwelling CGO) | EA | 2 | ||
| 16 | Interior Cleaning (4-Bedroom Dwelling FGO) | EA | 2 | ||
| 17 | Interior Cleaning (4-Bedroom Dwelling Disabled) | EA | 4 | ||
| 18 | Interior Cleaning GOQ, Geilenkirchen, Heinsbergerstr.14 | EA | 1 | ||
| 19 | Interior Cleaning Stove | EA | 4 | ||
| 20 | Interior Cleaning Refrigerator | EA | 4 | ||
| 21 | Interior Cleaning Dishwasher | EA | 4 | ||
| 22 | Interior Cleaning of Dryer | EA | 4 | ||
| 23 | Interior Cleaning Washing Machine | EA | 4 | ||
| 24 | Interior Cleaning Hourly Wage Rate for Licensed Journeyman | EA | 30 | ||
| 25 | Interior Cleaning Hourly Wage Rate for Licensed Apprentice Helper | EA | 30 | ||
| 26 | Interior Cleaning Balcony | EA | 11 | ||
| Total amount: |
Painting Maintenance 4003
| CLIN | Decription | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 4003 | PAINTING MAINTENANCE | ||||
| 01 | 2-Bedroom Apartment | EA | 15 | ||
| 02 | 3-Bedroom Apartment | EA | 15 | ||
| 03 | 4-Bedroom Apartment | EA | 10 | ||
| 04 | 4-Bedroom Apartment Attic 424 / A5 / C6 | EA | 1 | ||
| 05 | 5-Bedroom Apartment Stairway Combo 424 / B7 / B8 | EA | 1 | ||
| 06 | 4-Bedroom Duplex (MFH) 400R | EA | 1 | ||
| 07 | 4-Bedroom Duplex (SENL) 400L | EA | 1 | ||
| 08 | 4-Bedroom Unit Com - Single House | EA | 1 | ||
| 09 | SOQ Single House | EA | 3 | ||
| 10 | 3-Bedroom Dwelling JENL | EA | 34 | ||
| 11 | 3-Bedromm Dwelling SENL | EA | 5 | ||
| 12 | 3-Bedroom Dwelling / Triplex FGO | EA | 3 | ||
| 13 | 4-Bedroom Dwelling / Triplex JENL | EA | 36 | ||
| 14 | 4-Bedroom Dwelling / SENL | EA | 5 | ||
| 15 | 4-Bedroom Dwelling CGO | EA | 2 | ||
| 16 | 4-Bedroom Dwelling FGO | EA | 2 | ||
| 17 | 4-Bedroom Dwelling Disabled | EA | 4 | ||
| 18 | GOQ, Geilenkirchen Heinsbergerstr. 14 | EA | 1 | ||
| 19 | Interior Painting for above Apartments / units per sqm | Square Meter | 500 | ||
| 20 | Removal of old dispersion paint | Square Meter | 125 | ||
| 21 | Steep in lye old oil paint | Square Meter | 125 | ||
| 22 | Application of primer | Square Meter | 300 | ||
| 23 | Acrylic Joint Sealing | Linear Meter | 125 | ||
| 24 | Silicon Joint Sealing | Linear Meter | 125 | ||
| 25 | Hourly Wage Rate Licensed Journeyman | Hours | 30 | ||
| 26 | Hourly Wage Rate Apprentice Helper | Hours | 30 | ||
| Total amount: |
Flooring Maintenance 4004
| CLIN | Decription | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 4004 | FLOORING MAINTENANCE | ||||
| 01 | Sanding and Sealing 4-Bedroom Duplex 400 R | EA | 1 | ||
| 02 | Sanding and Sealing 4-Bedroom Duplex 400 L | EA | 1 | ||
| 03 | Sanding and Sealing of Stairs Treads and Landing | Houses | 50 | ||
| 04 | Sanding and Sealing of Hardwood Flooring per room | Square Meter | 113 | ||
| 05 | Replace damaged and / or defective carpet flooring | Square Meter | 100 | ||
| 06 | Remove Existing tiles and disposal IAW Host National Law | Square Meter | 300 | ||
| 07 | Prepare existing floor to receive new floor tiles (to include sanding, primer, leveling component, etc. | Square Meter | 300 | ||
| 08 | Install floor tiles including baseboards IAW DIN 18352 | Square Meter | 300 | ||
| 09 | Haro Fertigparkett flooring to include removal and disposal of old flooring | Square Meter | 50 | ||
| 10 | Replacement of linoleum covering to include removal and disposal | Square Meter | 50 | ||
| 11 | Repair damaged wood sub-floor | Square Meter | 50 | ||
| 12 | Repair water damaged wood sub-floor | Square Meter | 50 | ||
| 13 | Repair of concrete sub-floor | Square Meter | 23 | ||
| 14 | Install new PVC flooring to welding of the joints | Square Meter | 38 | ||
| 15 | 2 X filler for sub-flooring including primer and sanding off | Square Meter | 23 | ||
| 16 | PVC baseboard (height - 6 cm) | Linear Meter | 30 | ||
| 17 | PVC baseboard (height - 10 cm) | Linear Meter | 53 | ||
| 18 | Hourly Wage Rate Licensed Journeyman | Hours | 8 | ||
| 19 | Hourly Wage Rate Apprentice Helper | Hours | 11 | ||
| 20 | Carpet to tile - 3 Bedroom Dwelling JENL | EA | 3 | ||
| 21 | Carpet to tile - 4 Bedroom Dwelling JENL | EA | 2 | ||
| 22 | Carpet to tile - 4 Bedroom Dwelling SENL | EA | 1 | ||
| Total amount: |
4005 - 4006 - 4007
| CLIN | Decription | Unit of Issue | Estimated Quantity | Unit Price | Estimated Total |
| 4005 | STAIRWELL AND COMMON AREA CLEANING | ||||
| 01 | Cleaning of stairwells and common areas 4 buildings / 3 stairwells per building (4 x 12 months) | EA | 48 | ||
| 4006 | TRASH RECEPTACLE EMPTYING | ||||
| 01 | Trash receptacle emptying total number twenty (20) | Months | 12 | ||
| 4007 | DOG WASTE BAG DISPENSER | ||||
| 01 | Dog waste bag dispenser fill up - total number eight (8) | Months | 12 | ||
| Total amount: |
File details come from the government source that posted it. Updated .