Pricing_Proposal(reference_only).pdf
PDF 194 KB Posted
- Solicitation number
- 23-0653-ITB-C
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This is a Pricing Proposal document for the County Wide Parks and Conservation Resources (PCR) Roof Replacement Contract in Florida, detailing a comprehensive roof replacement project across multiple facilities. The contract covers a 36-month period and includes extensive roofing services such as reroofing with 3-Tab 30-year Owens Corning TruDefinition Duration Shingles in Desert Tan, replacement of sheathing, underlayment, fascia, shadow boards, drip edges, and skylights. The project encompasses multiple line items for roof-related work, including labor for journeyman roofers, roofer helpers, carpenters, and associated equipment like trucks and cranes, with estimated quantities ranging from 350 to 38,636 square feet or linear feet for various components.
The pricing proposal provides a detailed breakdown of services with quantities measured in square feet, linear feet, hourly rates, and units, allowing bidders to price out specific aspects of the roof replacement project. The scope includes standard working hours from 8:00 AM to 5:00 PM, Monday through Friday, with provisions for labor, materials, overhead, and profit. Additional line items cover disposal of construction debris (2,000 pounds) and various equipment rental rates, indicating a comprehensive approach to managing the roof replacement contract. While specific unit costs are not filled in, the table is structured to enable precise cost calculations for each component of the roofing project.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Invitation to Bid - Construction (ITB-C) #23-0653-ITB-C Title: County Wide Parks and Conservation Resources (PCR) Roof Replacement Contract
9. PRICING PROPOSAL
TABLE 1
Estimated Quantity (36 month)
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Reroof project: 3 Tab 30-year GFA shingles, Owens Corning TruDefinition
Duration Shingles in Desert Tan, including labor, material, overhead and profit during standard working hours. (8:00 AM to 5:00 PM)
38,636 sq. ft.
2 Replacement of 3/4 sheathing, including all labor and materials.
3,220 sq. ft.
3 Replacement of Self Adhesive
Underlayment, including all labor and materials
38,635 sq. ft.
4 Replacement of Fascia, including all labor and materials (2 x 6 and 2 x 8) 500 Linear Foot
5 Replacement of Shadow Board including labor and materials 800 Linear Foot
6 Cooper replacement of drip edge, including labor and materials.
350 Linear Foot
7 Aluminum replacement of drip edge, including labor and materials.
2,500 Linear Foot
8 Galvanized replacement of drip edge, including labor and materials 830 Linear Foot
9 4' x 4' Replacement of Skylights, including labor and materials.
10 Unit
10 3' x 3' Replacement of Skylights, including labor and materials.
10 Unit
11 2' x 2' Replacement of Skylights, including labor and materials.
10 Unit
Invitation to Bid - Construction (ITB-C) #23-0653-ITB-C Title: County Wide Parks and Conservation Resources (PCR) Roof Replacement Contract
Line Item Description Quantity Unit of
Measure Unit Cost Total
12 Journeyman Roofer, standard working hours (Monday through Friday 8 AM to
5 PM)
800 Hourly
13 Roofer Helper, standard working hours
(Monday through Friday 8 AM to 5
PM)
800 Hourly
14 Carpenter, standard working hours
(Monday through Friday, 8 AM to 5
PM)
400 Hourly
15 Carpenter helper, standard working hours (Monday through Friday, 8 AM to 5 PM)
400 Hourly
17 Truck 50 Hourly
18 Dump Truck 50 Hourly
19 Disposal of all construction debris 2,000 pound
20 Crane and Operator 50 Hourly
TOTAL
File details come from the government source that posted it. Updated .