Pricing_Proposal_ITB24-007(reference_only).pdf
PDF 339 KB Posted
- Solicitation number
- 24-0073-ITB-C
- Issued by
- Pinellas County, Florida
About this file
This document is a Pricing Proposal for the Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028, issued by Pinellas County, Florida. The contract is a comprehensive work order/unit-priced contract for rehabilitating existing county pump stations, covering a wide range of infrastructure improvements. The proposal includes detailed line items for various technical services and equipment, with quantities specified for each item. The contract scope encompasses installing new pumps, bases, piping, control panels, controls, remote telemetry units, valves, vaults, hatches, concrete coatings, and wiring, with the flexibility to address additional work identified during project preparation.
The pricing proposal consists of an extensive itemized list with 107 distinct pay items, categorized into sections such as excavation, by-pass pumping, valve installations, pipe replacements, control panels, equipment rentals, and labor rates. Each item includes a specified quantity, unit of measurement, and space for unit pricing. The document includes provisions for unspecified work, with 726,000 units allocated at $1.00 per unit, allowing flexibility for unforeseen requirements. The contract appears designed to provide Pinellas County with a comprehensive, adaptable framework for pump station maintenance and improvement, with unit pricing that enables precise budgeting and scalable project management across multiple pump station locations.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Invitation to Bid - Construction (ITB-C) #24-0073-ITB-C Title: Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028 (PID 000964A)
9. Pricing Proposal
SANITARY SEWER ITEMS
Pay Item No. Description Quantity Unit Unit Price Amount
PS-1 Mobilization/ Demobilization (Max 3% of overall cost)
1 LS
PS-2 Execution of General Requirements 10 EA
PS-3A Initial Excavation Per Dig - 20 LF 0'-6' depth
4 EA
PS-3B Initial Excavation Per Dig - 20 LF 6'-8' depth
4 EA
PS-3C Initial Excavation Per Dig - 20 LF 8'-10' depth
4 EA
PS-4A Additional Excavation Per Dig - 10 LF
0'-6' depth
2 EA
PS-4B Additional Excavation Per Dig - 10 LF
6'-8' depth
2 EA
PS-4C Additional Excavation Per Dig - 10 LF
8'-10' depth
2 EA
PS-5A By-Pass Pumping Set Up w / 2 pumps
0 HP to 3HP
2 EA
PS-5B By-Pass Pumping Set Up w / 2 pumps
3.1 HP to 5HP
2 EA
PS-5C By-Pass Pumping Set Up w / 2 pumps
5.1 HP to 7.5HP
2 EA
PS-5D By-Pass Pumping Set Up w / 2 pumps
7.6 HP to 10HP
2 EA
PS-5E By-Pass Pumping Set Up w / 2 pumps
10.1 HP to 15HP
2 EA
PS-5F By-Pass Pumping Set Up w / 2 pumps
15.1 HP to 20HP
2 EA
Title: Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028 (PID
Pay Item No. Description Quantity Unit Unit Price Amount
PS-5G By-Pass Pumping Set Up w / 2 pumps
20.1 HP to 47HP
2 EA
PS-5H By-Pass Pumping Set Up w / 2 pumps
47.1 HP to 88 HP
2 EA
PS-5I By-Pass Pumping Set Up w / 2 pumps
88.1 HP and greater
2 EA
PS-6A By-Pass Pumping Operation with 2 pumps 0 HP to 3HP
2 DAYS
PS-6B By-Pass Pumping Operation with 2 pumps 3.1 HP to 5HP
2 DAYS
PS-6C By-Pass Pumping Operation with 2 pumps 5.1 HP to 7.5HP
2 DAYS
PS-6D By-Pass Pumping Operation with 2 pumps 7.6 HP to 10HP
2 DAYS
PS-6E By-Pass Pumping Operation with 2 pumps 10.1 HP to 15HP
4 DAYS
PS-6F By-Pass Pumping Operation with 2 pumps 15.1 HP to 20HP
4 DAYS
PS-6G By-Pass Pumping Operation with 2 pumps 20.1 HP to 47HP
2 DAYS
PS-6H By-Pass Pumping Operation with 2 pumps 47.1 HP to 88 HP
2 DAYS
PS-6I By-Pass Pumping Operation with 2 pumps 88.1 HP and greater
2 DAYS
PS-7A Well Point Dewatering-Initial 12
Points 0'-6' depth
1 EA
PS-7B Well Point Dewatering-Initial 12
Points 6'-8' depth
1 EA
PS-7C Well Point Dewatering-Initial 12
Points 8'-10' depth
1 EA
Title: Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028 (PID
PS-7D Well Point Dewatering-Initial 12
Points 10'-12' depth
1 EA
PS-8A Well Point Dewatering-Additional per
Well Point 0'-6' depth
1 EA
PS-8B Well Point Dewatering-Additional per
Well Point 6'-8' depth
1 EA
PS-8C Well Point Dewatering-Additional per
Well Point 8'-10' depth
1 EA
PS-8D Well Point Dewatering-Additional per
Well Point 10'-12' depth
1 EA
PS-9A Resilient Wedge Gate Valve (4" diameter)
3 EA
PS-9B Resilient Wedge Gate Valve (6" diameter)
3 EA
PS-9C Resilient Wedge Gate Valve (8" diameter)
1 EA
PS-9D Resilient Wedge Gate Valve (10" diameter)
1 EA
PS-9E Resilient Wedge Gate Valve (12" diameter)
1 EA
PS-10A Check Valve (4" diameter) 2 EA
PS-10B Check Valve (6" diameter) 2 EA
PS-10C Check Valve (8" diameter) 1 EA
PS-10D Check Valve 10" diameter 1 EA
PS-10E Check Valve 12" diameter 1 EA
PS-11A C-900 DR-18 PVC Pipe (4" diameter) 40 LF
PS-11B C-900 DR-18 PVC Pipe (6" diameter) 40 LF
Title: Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028 (PID
PS-11C C-900 DR-18 PVC Pipe (8" diameter) 40 LF
PS-11D C-900 DR-18 PVC Pipe (10" diameter) 20 LF
PS-11E C-900 DR-18 PVC Pipe (12" diameter) 20 LF
PS-12A Ductile Iron Pipe Replacement
(Flanged and Coated) (4" dia.)
100 LF
PS-12B Ductile Iron Pipe Replacement
(Flanged and Coated) (6" dia.)
100 LF
PS-12C Ductile Iron Pipe Replacement
(Flanged and Coated) (8" dia.)
30 LF
PS-12D Ductile Iron Pipe Replacement
(Flanged and Coated) (10" dia.)
20 LF
PS-12E Ductile Iron Pipe Replacement
(Flanged and Coated) (12" dia.)
20 LF
PS-13A Stainless Steel (316-Sch. 40) Pipe (4" dia.)
200 LF
PS-13B Stainless Steel (316-Sch. 40) Pipe (6" dia.)
200 LF
PS-13C Stainless Steel (316-Sch. 40) Pipe (8" dia.)
30 LF
PS-13D Stainless Steel (316-Sch. 40) (Pipe 10" dia.)
20 LF
PS-13E Stainless Steel (316-Sch. 40) Pipe (12" dia.)
20 LF
PS-14A Stainless Steel (316) Pipe Flanges (4" pipe flange)
60 EA
PS-14B Stainless Steel (316) Pipe Flanges (6" pipe flange)
40 EA
PS-14C Stainless Steel (316) Pipe Flanges (8" pipe flange)
30 EA
Title: Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028 (PID
PS-14D Stainless Steel (316) Pipe Flanges (10" pipe flange)
20 EA
PS-14E Stainless Steel (316) Pipe Flanges (12" pipe flange)
20 EA
PS-15 Furnish and Install Ductile Iron Fittings and Restraints
5,000 LBS
PS-16 Furnish and Install Stainless Steel
Fittings and Restraints
2,000 LBS
PS-17 Furnish and Install Stainless Steel
Pressure Gauge Connections
10 EA
PS-18A Stainless Steel (304) Pipe Saddle
Supports (4" diameter)
2 EA
PS-18B Stainless Steel (304) Pipe Saddle
Supports (6" diameter)
2 EA
PS-18C Stainless Steel (304) Pipe Saddle
Supports (8" diameter)
2 EA
PS-18D Stainless Steel (304) Pipe Saddle
Supports (10" diameter)
2 EA
PS-18E Stainless Steel (304) Pipe Saddle
Supports (12" diameter)
2 EA
PS-19 Furnish and Install Bollards (Per
Detail)
4 EA
PS-20 Furnish and Install Wet Well -
Concrete
50 CY
PS-21 Furnish and Install Wet Well -
Fiberglass
300 SF
PS-22 Furnish and Install Manhole with
Frame and Cover less than 12 Feet deep
24 VF
Title: Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028 (PID
PS-23 Furnish and Install Manhole with
Frame and Cover greater than 12 Feet deep
24 VF
PS-24 Furnish and Install Wet Well Top Slab, Access Frame and Door (HS-20 Rated)
100 SF
PS-25 Furnish and Install Wet Well Top Slab, Access Frame and Door ( 300 PSF
Rated)
100 SF
PS-26A Valve Vault (Duplex) (6' x 6') 1 EA
PS-26B Valve Vault (Duplex) (7' x 7') 1 EA
PS-26C Valve Vault (Duplex) (7'-6" x 8') 1 EA
PS-26D Valve Vault (Duplex) (8'-6" x 9') 1 EA
PS-26E Valve Vault (Duplex) (9' x 10') 1 EA
PS-27A Valve Vault (Triplex) (6' x 7') 1 EA
PS-27B Valve Vault (Triplex) (7' x 8') 1 EA
PS-27C Valve Vault (Triplex) (7'-6" x 10') 1 EA
PS-27D Valve Vault (Triplex) (8'-6" x 11') 1 EA
PS-27E Valve Vault (Triplex) (9' x 12') 1 EA
PS-28 Furnish and Install Valve Vault Top
Slab, Access Frame and Door (HS-20
Rated) (Duplex)
50 SF
PS-29 Furnish and Install Valve Vault Top
Slab, Access Frame and Door (HS-20
Rated) (Triplex)
50 SF
PS-30 Furnish and Install Valve Vault Top
Slab and Access Frame and Door (300
PSF Rated) (Duplex)
50 SF
Title: Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028 (PID
PS-31 Furnish and Install Valve Vault Top
Slab and Access Frame and Door (300
PSF Rated) (Triplex)
50 SF
PS-32A Inside PVC Drop Connection to Wet
Well (4")
6 VF
PS-32B Inside PVC Drop Connection to Wet
Well (6")
10 VF
PS-32C Inside PVC Drop Connection to Wet
Well (8")
6 VF
PS-32D Inside PVC Drop Connection to Wet
Well (10")
6 VF
PS-32E Inside PVC Drop Connection to Wet
Well (12")
6 VF
PS-32F Inside PVC Drop Connection to Wet
Well (Over 12")
6 VF
PS-33 Furnish and Install Fiberglass Liner
With Top and Grout
500 SF
PS-34 Install Epoxytec Epoxy Liner System 500 SF
PS-35 Install Enviroline Epoxy Liner System 500 SF
PS-38 Furnish and Install Wet Well Draw
Tube
100 VF
PS-39 Furnish, Install and Remove
Temporary Sheeting
500 SF
PS-40 Furnish and Install Permanent
Sheeting
200 SF
PS-41 Pavement Base & Base Restoration
(6" Crushed Concrete)
100 SY
PS-42 Asphalt Pavement Base & Base
Restoration (4" Asphaltic Base)
100 SY
Title: Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028 (PID
PS-43 Asphalt Surface Pavement 1" PC-3
ACSC
100 SY
PS-44 Flowable Fill 6 CY
PS-45 Shell Driveway Base, 6" Thick 20 SY
PS-46 Furnish and Install Structural Concrete
(4000 psi)
20 CY
PS-47 Remove/Reconstruct Concrete
Driveways/Control Panel Slabs: All 6 inches thick around wet wells
150 SY
PS-48 Pea Gravel Driveway 4 CY
PS-49 Remove/Reconstruct Concrete
Sidewalks
10 CY
PS-50 Remove/Reconstruct Concrete Curb and Gutters
150 LF
PS-51 Grass Restoration by Seeding 4 SY
PS-52 Grass Restoration by Sodding 250 SY
PS-53 Special Refill Materials - Crushed
Stone
50 CY
PS-54 Special Backfill Materials - Sand 20 CY
PS-55A Remove and Replace Concrete for
Wall Penetrations 2" Diameter or less
Hole
40 EA
PS-55B Remove and Replace Concrete for
Wall Penetrations 4" Diameter Hole
20 EA
PS-55C Remove and Replace Concrete for
Wall Penetrations 6" Diameter Hole
20 EA
PS-55D Remove and Replace Concrete for
Wall Penetrations 8" Diameter Hole
20 EA
Title: Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028 (PID
PS-55E Remove and Replace Concrete for
Wall Penetrations 10" Diameter Hole
20 EA
PS-55F Remove and Replace Concrete for
Wall Penetrations Greater than 10 "
Hole
20 EA
PS-56A Furnish and Install Control Panel 230
Volts/3 Phase 1.0 - 3 HP Contact
Motor Starter
1 EA
PS-56B Furnish and Install Control Panel 230
Volts/3 Phase 1.0 - 3 HP VFD Option for 1 Phase to 3 Phase
Conversion/cross line bypass option
1 EA
PS-56C Furnish and Install Control Panel 230
Volts/3 Phase 3.5 - 5 HP Contact
Motor Starter
1 EA
PS-56D Furnish and Install Control Panel 230
Volts/3 Phase 3.5 - 5 HP VFD Option for 1 Phase to 3 Phase
Conversion/cross line bypass option
1 EA
PS-56E Furnish and Install Control Panel 230
Volts/3 Phase 5.5 - 7.5 HP
1 EA
PS-56F Furnish and Install Control Panel 230
Volts/3 Phase 8.0 - 10 HP
1 EA
PS-56G Furnish and Install Control Panel 230
Volts/3 Phase 10.5 - 15.0 HP
1 EA
PS-56H Furnish and Install Control Panel 230
Volts/3 Phase 15.5 -23.0 HP VFD
Option/cross line bypass option
1 EA
PS-56J Furnish and Install Control Panel 230
Volts/3 Phase 15.5 -23.0 HP Soft Start
Option/cross line bypass option
1 EA
PS-56K Furnish and Install Control Panel 230
Volts/3 Phase 23.5 - 25.0 HP VFD
Option/coss line bypass option
Title: Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028 (PID
PS-56L Furnish and Install Control Panel 230
Volts/3 Phase 23.5 - 25.0 HP Soft Start
Option/cross line bypass option
1 EA
PS-56M Furnish and Install Control Panel 230
Volts/3 Phase 25.5 - 30.0 HP VFD
Option/cross line bypass option
1 EA
PS-56N Furnish and Install Control Panel 230
Volts/3 Phase 25.5 - 30.0 HP Soft Start
Option/cross line bypass option
1 EA
PS-56P Furnish and Install Control Panel 230
Volts/3 Phase 30.5 - 40.0 HP VFD
Option/cross line bypass option
1 EA
PS-56R Furnish and Install Control Panel 230
Volts/3 Phase 30.5 - 40.0 HP Soft Start
Option/cross line bypass option
1 EA
PS-56S Furnish and Install Control Panel 230
Volts/3 Phase 40.5 - 50.0 HP VFD
Option/cross line bypass option
1 EA
PS-56T Furnish and Install Control Panel 230
Volts/3 Phase 40.5 - 50.0 HP Soft Start
Option/cross line bypass option
1 EA
PS-56U Furnish and Install Control Panel 460
Volts/3 Phase 1.0 - 3 HP
1 EA
PS-56V Furnish and Install Control Panel 460
Volts/3 Phase 3.5 - 5 HP
1 EA
PS-56W Furnish and Install Control Panel 460
Volts/3 Phase 5.5 - 7.5 HP
1 EA
PS-56X Furnish and Install Control Panel 460
Volts/3 Phase 8.0 - 10 HP
1 EA
PS-56Y Furnish and Install Control Panel 460
Volts/3 Phase 10.5 - 15.0 HP
Title: Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028 (PID
PS-56Z Furnish and Install Control Panel 460
Volts/3 Phase 15.5 -20.0 HP VFD
Option/cross line bypass option
1 EA
PS-56AA Furnish and Install Control Panel 460
Volts/3 Phase 15.5 -20.0 HP Soft Start
Option/cross line bypass option
1 EA
PS-56AB Furnish and Install Control Panel 460
Volts/3 Phase 20.5 -25.0 HP VFD
Option/cross line bypass option
1 EA
PS-56AC Furnish and Install Control Panel 460
Volts/3 Phase 20.5 -25.0 HP Soft Start
Option/cross line bypass option
1 EA
PS-56AD Furnish and Install Control Panel 460
Volts/3 Phase 25.5 -30.0 HP Panel VFD
Option/cross line bypass option
1 EA
PS-56AE Furnish and Install Control Panel 460
Volts/3 Phase 25.5 -30.0 HP Panel Soft
Start Option/cross line bypass option
1 EA
PS-56AF Furnish and Install Control Panel 460
Volts/3 Phase 30.5 -40.0 HP Panel -
VFD/cross line bypass option
1 EA
PS-56AG Furnish and Install Control Panel 460
Volts/3 Phase 50.0 HP Panel -
VFD/cross line bypass option
1 EA
PS-56AH Furnish and Install Control Panel 460
Volts/3 Phase 60.0 HP Panel -
VFD/cross line bypass option
1 EA
PS-56AJ Furnish and Install Control Panel 460
Volts/3 Phase 75.0 HP Panel -
VFD/cross line bypass option
1 EA
PS-56AK Furnish and Install Control Panel 460
Volts/3 Phase 90.0 HP Panel -
VFD/cross line bypass option
Title: Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028 (PID
PS-56AL Furnish and Install Control Panel 460
Volts/3 Phase 51.0 - 60.0 HP Panel -
VFD - Triplex /cross line bypass option
1 EA
PS-57A Furnish and Install Wet Well Mixer ITT
Flygt 2.3HP mixer model #SR4620
1 EA
PS-57B Furnish and Install Wet Well Mixer
ABS 2 HP mixer model #RW2022
1 EA
PS-58A Furnish and Install Level Sensors
Greyline
5 EA
PS-58B Furnish and Install Level Sensors
Bubbler
5 EA
PS-58C Furnish and Install Level Sensors
HydroRanger/XPS-15
5 EA
PS-59 Furnish and Install Floats 10 SET
PS-60 SCADA/RTU Panel Relocation 4 EA
PS-61 Furnish and Install New Motorola ACE with Cellular SCADA/RTU Panel
2 EA
PS-62A New Submersible Pumps 3 HP Pump or less CP or N series/HC impeller option
2 EA
PS-62B New Submersible Pumps 3.5 - 5 HP
Pump CP or N series/HC impeller option
2 EA
PS-62C New Submersible Pumps 5.5 - 7.5 HP
Pump CP or N series/HC impeller option
2 EA
PS-62D New Submersible Pumps 7.5 - 10 HP
Pump CP or N series/HC impeller option
2 EA
PS-62E New Submersible Pumps 10.5 - 12 HP
Pump CP or N series/HC impeller option
Title: Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028 (PID
PS-62F New Submersible Pumps 12.5 - 15 HP
Pump CP or N series/HC impeller option
3 EA
PS-62G New Submersible Pumps 15.5 - 23 HP
Pump CP or N series/HC impeller option
3 EA
PS-62H New Submersible Pumps 23.5 - 25 HP
Pump CP or N series/HC impeller option
2 EA
PS-62I New Submersible Pumps 25.5 - 30 HP
Pump CP or N series/HC impeller option
2 EA
PS-62J New Submersible Pumps 30.5 - 35 HP
Pump CP or N series/HC impeller option
2 EA
PS-62K New Submersible Pumps 35.5 - 40 HP
Pump CP or N series/HC impeller option
2 EA
PS-62L New Submersible Pumps 40.5 - 47 HP
Pump CP or N series/HC impeller option
2 EA
PS-62M New Submersible Pumps 47.5 - 50 HP
Pump CP or N series/HC impeller option
2 EA
PS-62N New Submersible Pumps 50.5 - 60 HP
Pump CP or N series/HC impeller option
2 EA
PS-62O New Submersible Pumps 60.5 - 75 HP
Pump CP or N series/HC impeller option
2 EA
PS-62P New Submersible Pumps 75.5 - 90 HP
Pump CP or N series/HC impeller option
Title: Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028 (PID
PS-63 Furnish and Install Mix Flush Valve 3-
23 HP
1 EA
PS-64 Pump Preventative Maintenance
Testing
2 EA
PS-65 Furnish and Install Area Lighting on 10
Foot Pole
10 EA
PS-66 Furnish and Install Area Lighting on
Gooseneck
4 EA
PS-67 Furnish and Install Short Pole Area
Lighting
5 EA
PS-68 Generator Electrical Work & Startup 1 EA
PS-69A Pump Discharge Connection (4") 1 EA
PS-69B Pump Discharge Connection (6") 1 EA
PS-69C Pump Discharge Connection (8") 1 EA
PS-69D Pump Discharge Connection (10") 1 EA
PS-69E Pump Discharge Connection (12") 1 EA
PS-70 New Replacement S.S Pump Guide
Rails-2 Inch
100 LF
PS-71 New Replacement S.S Pump Guide
Rails-3 Inch
25 LF
PS-72A New Replacement S.S Guide Rail
Brackets (2 In. Upper Guide Rail
Bracket)
5 EA
PS-72B New Replacement S.S Guide Rail
Brackets (2 In. Intermediate Bracket)
4 EA
PS-72C New Replacement S.S Guide Rail
Brackets (3 In. Upper Guide Rail
Bracket)
4 EA
Title: Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028 (PID
PS-72D New Replacement S.S Guide Rail
Brackets (3 In. Intermediate Bracket)
2 EA
PS-73 Furnish and Install PVC "P" Trap in
Wet Well - 4 inch
5 EA
PS-74 Furnish and Install PVC Vent in Wet
Well
4 EA
PS-75 Remove PVC "P" Traps in Wet Well and Replace with Flanged All-Rubber
Duck Bill Type Check Valve
4 EA
PS-76A Cam-Lok Coupling Adapter & Dust Cap
(4" S.S. male IPS X male Cam-Lok &
Female Dust Cap)
8 EA
PS-76B Cam-Lok Coupling Adapter & Dust Cap
(6" S.S. male IPS X male Cam-Lok &
Female Dust Cap)
4 EA
PS-76C Cam-Lok Coupling Adapter & Dust Cap
(8" S.S. male IPS X male Cam-Lok &
Female Dust Cap)
2 EA
PS-77 Furnish and Install Exterior Pump Out
Connection Enclosure
5 EA
PS-78 Relocate Existing Potable Water
Service
4 EA
PS-79 Clean and Paint Valve Vault Concrete and Piping
1 EA
PS-80 Clean and Paint Valve Vault Concrete 2 EA
PS-81 Clean Existing Wet Well and Dispose of Waste
19 EA
PS-82 Wet Well Fillet Concrete 50 CF
PS-83 Ballast Concrete 24 CY
PS-85 Maintenance of Traffic 30,000 UNIT
Title: Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028 (PID
PS-86 Labor Rates Forman 99 HR
PS-87 Labor Rates Skilled 100 HR
PS-88 Labor Rates Welder with Equipment &
Materials
6 DAY
PS-89 Labor Rates Un-Skilled 100 HR
PS-90 Labor Rates Electrician 100 HR
PS-91 Labor Rates Electrician Helper 100 HR
PS-92 Labor Rates Backhoe Operator 50 HR
PS-93 Labor Rates Crane Truck Operator 50 HR
PS-94 Labor Rates Dump Truck Driver 50 HR
PS-95 Equipment Rental Backhoe (1.0 Cubic
Yard Bucket)
20 DAY
PS-96 Equipment Rental Dump Truck (5
Cubic Yards)
20 DAY
PS-97 Equipment Rental Trencher (40 HP) 8 DAY
PS-98 Equipment Rental Generator (10 KW) 6 DAY
PS-99 Equipment Rental Equipment Truck (1
Ton FB)
6 DAY
PS-100 Equipment Rental Trash Pump - 3" 6 DAY
PS-101 Equipment Rental Diesel Pump - 6" 10 DAY
PS-102 Equipment Rental Vacuum Truck -
3000 gallon (Standby)
8 HR
PS-103 Equipment Rental Vacuum Truck -
3000 gallon (In Use)
8 HR
Title: Sanitary Sewer Pump Station Repair, Rehabilitation, and Improvement Contract for Fiscal Years 2025-2028 (PID
PS-104 Equipment Rental Vacuum Truck -
5000 gallon (Standby)
8 HR
PS-105 Equipment Rental Vacuum Truck -
5000 gallon (In Use)
8 HR
PS-106 Equipment Rental Light Tower with
Generator
8 DAY
PS-107 Equipment Rental Crane Truck (25
Ton or less)
6 DAY
005-0900 As-Builts 10 EA
TOTAL
UNSPECIFIED ITEMS
999-0000 Unspecified Work 726,000 EA $1.00
TOTAL
File details come from the government source that posted it. Updated .