Pricing Page-Flar Rubber Roof replace.xlsx
XLSX spreadsheet 9 KB Posted
- Solicitation number
- ARFQ-0618-BVH2600000002-1
- Issued by
- Cabell County, West Virginia
About this file
This document is a pricing page for a state or local government roofing replacement project, specifically an Invitation for Bid (BVBH ARFQ 26*02) for a Veterans Home facility. The project involves flat rubber roof replacement and gutter cleaning for multiple buildings, including Building D, Storeroom, Maintenance Building, and associated walkways. The bid requires vendors to enter their pricing in specific columns (Column C, lines 4 and 5) for the specified work, with reference to Section 4.1 and 4.6 of the project specifications.
The pricing page shows a total project cost structure with spaces for vendor bid multipliers and total project costs. Currently, the document displays $0.00 for both the individual line items and the grand total, indicating this is a template for vendors to complete their specific pricing proposal. No specific pricing, funding sources, or contract terms beyond the basic project scope are detailed in this document. The file appears to be a standard bidding worksheet designed to capture vendor pricing for a specific facilities maintenance and repair project at a Veterans Home facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_ARFQ_0618_BVH2600000002_1_WV_ARFQ_FORM.PDF | ||
| Roof Replacement.docx | DOCX document | |
| Provisions for Federally Funded Procurements (2).pdf | ||
| TCA (5).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BVBH ARFQ 26*02--Vet Home Flat Rubber Roof Replace and Gutter Clean Building D, Storeroom, Mainteance Building and Walkways | ||||
| To complete this pricing page enter in bid for item in Column C, lines 4 and 5. | ||||
| Spec Ref | Catagory Description/Unit of Measurement For Bid Purposes | Vendor Bid | Multiplier | Total |
| Project plans Section 4.1, 4.6 | Flat rubber roof replace per specs, and gutter cleanout | $0.00 | 1 | $0.00 |
| GRAND TOTAL: | $0.00 |
File details come from the government source that posted it. Updated .