This is a Price Schedule Sheet for headstone maintenance and setting services at Abraham Lincoln National Cemetery under solicitation number 36C78626B0022 issued by the Department of Veterans Affairs National Cemetery Administration. The contract covers a five-year period from 2026 through 2031, consisting of a one-year base period (2026-2027) and four one-year option periods.

The solicitation requires four primary services to be performed annually: (1) Initial and Replacement Upright Headstone and Flat Marker Setting—setting approximately 2,514 headstones and flat markers within eight days of receipt per National Shrine Standards; (2) Raise and Realign Upright Headstones—raising, leveling, resetting, realigning, backfilling, and cleaning approximately 4,250 ±5% existing upright headstones annually; (3) Fine Tune Alignment (FTA) of Upright Headstones—bringing approximately 8,500 ±5% existing upright headstones into alignment within one degree plumb and visually aligned horizontally, vertically, and diagonally; and (4) Cleaning Upright Headstones—cleaning all upright headstones annually using approved cleaning products and methods. Each service line item is priced as a job (JB) with quantity of 1.00, with blank fields provided for contractors to submit unit prices and total amounts. The price schedule is structured with line items 0001-0004 for the base period, 1001-1004 for Option 1, 2001-2004 for Option 2, 3001-3004 for Option 3, and 4001-4004 for Option 4, with a grand total field at the conclusion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
__________________
__________________

Initial and Replacement Upright Headstone and Flat Marker Setting: Set all upright headstones and flat markers within 8 days of receipt per the technical specifications and National Shrine Standards. Estimated number of headstones and flat markers to be set is 2514 annually.

Contract Period: Base POP Begin: xx-xx-2026 POP End: xx-xx-2027

1.00
JB
__________________
__________________

Raise and Realign Upright Headstones: Raise, level, reset, realign, backfill, and clean approximately 4,250 ± 5% existing upright headstones annually per the technical specifications and national shrine standards.

1.00
JB
__________________
__________________

Fine Tune Alignment (FTA) Upright Headstones: Bring approximately 8,500 ± 5% existing upright headstones into alignment within one (1) degree plumb. Visually aligned horizontally, vertically, and diagonally.

1.00
JB
__________________
__________________

Cleaning Upright Headstones: Clean all upright headstones annually with approved cleaning products and methods listed in section A.7.

POP End: 04-29-2027

1.00
JB
__________________
__________________

Initial and Replacement Upright Headstone and Flat Marker Setting: Set all upright headstones and flat markers within 8 days of receipt per the technical specifications and National Shrine Standards. Estimated number of headstones and flat markers to be set is 2514 annually.

Contract Period: Option 1 POP Begin: xx-xx-2027 POP End: xx-xx-2028

1.00
JB
__________________
__________________

Raise and Realign Upright Headstones: Raise, level, reset, realign, backfill, and clean approximately 4,250 ± 5% existing upright headstones annually per the technical specifications and national shrine standards.

1.00
JB
__________________
__________________

Fine Tune Alignment (FTA) Upright Headstones: Bring approximately 8,500 ± 5% existing upright headstones into alignment within one (1) degree plumb. Visually aligned horizontally, vertically, and diagonally.

1.00
JB
__________________
__________________

Cleaning Upright Headstones: Clean all upright headstones annually with approved cleaning products and methods listed in section A.7.

1.00
JB
__________________
__________________

Initial and Replacement Upright Headstone and Flat Marker Setting: Set all upright headstones and flat markers within 8 days of receipt per the technical specifications and National Shrine Standards. Estimated number of headstones and flat markers to be set is 2514 annually.

Contract Period: Option 2 POP Begin: xx-xx-2028 POP End: xx-xx-2029

1.00
JB
__________________
__________________

Raise and Realign Upright Headstones: Raise, level, reset, realign, backfill, and clean approximately 4,250 ± 5% existing upright headstones annually per the technical specifications and national shrine standards.

1.00
JB
__________________
__________________

Fine Tune Alignment (FTA) Upright Headstones: Bring approximately 8,500 ± 5% existing upright headstones into alignment within one (1) degree plumb. Visually aligned horizontally, vertically, and diagonally.

Contract Period: Option 3

1.00
JB
__________________
__________________

Cleaning Upright Headstones: Clean all upright headstones annually with approved cleaning products and methods listed in section A.7.

1.00
JB
__________________
__________________

Initial and Replacement Upright Headstone and Flat Marker Setting: Set all upright headstones and flat markers within 8 days of receipt per the technical specifications and National Shrine Standards. Estimated number of headstones and flat markers to be set is 2514 annually.

POP Begin: xx-xx-2029 POP End: xx-xx-2030

1.00
JB
__________________
__________________

Raise and Realign Upright Headstones: Raise, level, reset, realign, backfill, and clean approximately 4,250 ± 5% existing upright headstones annually per the technical specifications and national shrine standards

1.00
JB
__________________
__________________

Fine Tune Alignment (FTA) Upright Headstones: Bring approximately 8,500 ± 5% existing upright headstones into alignment within one (1) degree plumb. Visually aligned horizontally, vertically, and diagonally.

1.00
JB
__________________
__________________

Cleaning Upright Headstones: Clean all upright headstones annually with approved cleaning products and methods listed in section A.7.

1.00
JB
__________________
__________________

Initial and Replacement Upright Headstone and Flat Marker Setting: Set all upright headstones and flat markers within 8 days of receipt per the technical specifications and National Shrine Standards. Estimated number of headstones and flat markers to be set is 2514 annually.

Contract Period: Option 4 POP Begin: xx-xx-2030 POP End: xx-xx-2031

1.00
JB
__________________
__________________

Raise and Realign Upright Headstones: Raise, level, reset, realign, backfill, and clean approximately 4,250 ± 5% existing upright headstones annually per the technical specifications and national shrine standards.

1.00
JB
__________________
__________________

Fine Tune Alignment (FTA) Upright Headstones: Bring approximately 8,500 ± 5% existing upright headstones into alignment within one (1) degree plumb. Visually aligned horizontally, vertically, and diagonally.

1.00
JB
__________________
__________________

Cleaning Upright Headstones: Clean all upright headstones annually with approved cleaning products and methods listed in section A.7.

GRAND TOTAL
__________________

File details come from the government source that posted it. Updated .