This is a cost estimate worksheet template for an Invitation for Bid (IFB) solicitation. The document is designed for contractors to submit lump sum cost estimates organized by construction division for the Initial and Replacement Upright Headstone and Flat Marker Setting project at Abraham Lincoln National Cemetery in Elwood, Illinois. Solicitation Number 36C78626B0022 is issued by the Department of Veterans Affairs National Cemetery Administration.
The worksheet requires contractors to provide pricing across five Contract Line Item Numbers (CLINs 001-005) and includes cost line items spanning the full range of construction divisions, from Division 0 (Special Sections) through Division 33 (Utilities), along with separate line items for bonds, overhead, and profit. Contractors must provide lump sum totals for each division utilized in the project or mark divisions as "N/A" if not applicable, with the option to add additional cost items deemed appropriate. The format culminates in a grand total cost submission, allowing the government to compare fixed-price bids across qualified contractors for this headstone and marker installation work at the national cemetery.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78626B0022 0002.docx | DOCX document | |
| Revised Statement of Work for Headstone Setting Raise and Realign at Abraham Lincoln NC 05152026.pdf | ||
| Updated Price Schedule Sheet 05152026.docx | DOCX document | |
| 36C78626B0022 0001.docx | DOCX document | |
| VAAR 85221975 VA Notice of Limitations On Subcontracting Certificate.docx | DOCX document | |
| Statement of Work for Headstone Setting Raise and Realign at Abraham Lincoln NC.pdf | ||
| 36C78626B0022_1.docx | DOCX document | |
| Price Schedule Sheet.docx | DOCX document | |
| Attachments 1 through 5.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IFB Contractor Cost Estimate Worksheet |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| Solicitation Number | 36C78626B0022 |
| Project Nunber | None |
| Project Name | Initial and Replacement Upright Headstone and Flat Marker Setting at Abraham Lincoln National Cemetery |
| Division | Unit | CLIN 001 | CLIN 002 | CLIN 003 | CLIN 004 | CLIN 005 | Total |
| Division 0 | |||||||
| Special Sections | |||||||
| Division 01 | |||||||
| General Requirements | |||||||
| Division 02 | |||||||
| Existing Conditions | |||||||
| Division 03 | |||||||
| Concrete | |||||||
| Division 04 | |||||||
| Masonry | |||||||
| Division 05 | |||||||
| Metals | |||||||
| Division 06 | |||||||
| Wood, Plastic, and Composites | |||||||
| Division 07 | |||||||
| Thermal and Moisture Protection | |||||||
| Division 08 | |||||||
| Openings (Doors, Windows, etc...) | |||||||
| Division 09 | |||||||
| Finishes | |||||||
| Division 10 | |||||||
| Specialties | |||||||
| Division 11 | |||||||
| Equipment | |||||||
| Division 12 | |||||||
| Furnishings | |||||||
| Division 13 | |||||||
| Special Construction | |||||||
| Division 14 | |||||||
| Fire Suppression | |||||||
| Division 22 | |||||||
| Plumbing | |||||||
| Division 23 | |||||||
| Heat, Ventilating, and Air Conditioning | |||||||
| Division 25 | |||||||
| Integrated Automation | |||||||
| Division 26 | |||||||
| Electrical | |||||||
| Division 27 | |||||||
| Communications | |||||||
| Division 28 | |||||||
| Electronic Safety and Security | |||||||
| Division 31 | |||||||
| Earthwork | |||||||
| Division 32 | |||||||
| Exterior Improvements | |||||||
| Division 33 | |||||||
| Utilities | |||||||
| Bonds |
Overhead
Profit
GRAND TOTALS $ $