IFB Cost Estimate Worksheet.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Y1PZ--Headstone Setting/Raise & Realign at Abraham Lincoln NC
Solicitation number
36C78626B0022
Issued by

About this file

This is a cost estimate worksheet template for an Invitation for Bid (IFB) solicitation. The document is designed for contractors to submit lump sum cost estimates organized by construction division for the Initial and Replacement Upright Headstone and Flat Marker Setting project at Abraham Lincoln National Cemetery in Elwood, Illinois. Solicitation Number 36C78626B0022 is issued by the Department of Veterans Affairs National Cemetery Administration.

The worksheet requires contractors to provide pricing across five Contract Line Item Numbers (CLINs 001-005) and includes cost line items spanning the full range of construction divisions, from Division 0 (Special Sections) through Division 33 (Utilities), along with separate line items for bonds, overhead, and profit. Contractors must provide lump sum totals for each division utilized in the project or mark divisions as "N/A" if not applicable, with the option to add additional cost items deemed appropriate. The format culminates in a grand total cost submission, allowing the government to compare fixed-price bids across qualified contractors for this headstone and marker installation work at the national cemetery.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

IFB Contractor Cost Estimate Worksheet
Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number.

If a Division is not being used put N/A in that field.

You can Add additional items you feel are appropriate.

Solicitation Number36C78626B0022
Project NunberNone
Project NameInitial and Replacement Upright Headstone and Flat Marker Setting at Abraham Lincoln National Cemetery
DivisionUnitCLIN 001CLIN 002CLIN 003CLIN 004CLIN 005Total
Division 0
Special Sections
Division 01
General Requirements
Division 02
Existing Conditions
Division 03
Concrete
Division 04
Masonry
Division 05
Metals
Division 06
Wood, Plastic, and Composites
Division 07
Thermal and Moisture Protection
Division 08
Openings (Doors, Windows, etc...)
Division 09
Finishes
Division 10
Specialties
Division 11
Equipment
Division 12
Furnishings
Division 13
Special Construction
Division 14
Fire Suppression
Division 22
Plumbing
Division 23
Heat, Ventilating, and Air Conditioning
Division 25
Integrated Automation
Division 26
Electrical
Division 27
Communications
Division 28
Electronic Safety and Security
Division 31
Earthwork
Division 32
Exterior Improvements
Division 33
Utilities
Bonds

Overhead

Profit

GRAND TOTALS $ $

File details come from the government source that posted it. Updated .