Price_Schedule.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- INDU Fire Suppression System Inspection & Testing Federal contract opportunity
- Solicitation number
- 140P6425Q0034
About this file
The file is a Price Schedule for fire protection system inspection and testing services at Indiana Dunes National Park. The opportunity (Solicitation Number 140P6425Q0034) is a small business set-aside contract for comprehensive fire suppression system inspections across multiple buildings, including the Douglas Center, Cowles Lodge, and ten individual cabins. The base and optional scope involves 5-year inspections, sprinkler head testing, gauge replacements, system internals checks, and specific repairs like removing antifreeze, installing control valve signs, and replacing corroded components.
The solicitation is issued by the Department of the Interior National Park Service Midwest Region, with quotes due by 12:00 PM ET on July 31, 2025, via email. The contract is expected to be awarded in August 2025, with a 120-day performance period. An organized site visit is scheduled for July 23, 2025, at 9:00 AM CT at the Dunes Learning Center Parking Lot. Offerors must be actively registered in the System for Award Management, qualify as a small business under NAICS code 561621 (with a $25.0M size standard), and submit a price schedule, evidence of technical capability, prior experience, and SAM Unique Entity ID.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6425Q0034_Amd_0001.pdf | ||
| Questions___Answers_0001.pdf | ||
| UPDATED_Price_Schedule_0001.xlsx | XLSX spreadsheet | |
| Sol_140P6425Q0034.pdf | ||
| Location_Maps.pdf | ||
| HFP_Inspection_Report.pdf | ||
| Statement_of_Work.pdf | ||
| NPS_Structural_Fire_Management_Program.pdf | ||
| SCA_WD_-_Porter_County___Lake_County__IN.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE
| UNITED STATES DEPARTMENT OF THE INTERIOR | |||||||||||||
| National Park Services | |||||||||||||
| Indiana Dunes National Park | |||||||||||||
| Fire Protection System Inspection & Testing | |||||||||||||
| Price Schedule (BASE) | |||||||||||||
| DESCRIPTION | LABOR | MATERIALS | EQUIPMENT | TOTAL BASE* | |||||||||
| BASE | LOCATION | BLDG NO. | DESCRIPTION | QNTY* | UNITS* | AMOUNT* | QNTY* | UNITS* | AMOUNT* | QNTY* | UNITS* | AMOUNT* | |
| 1 | Douglas Center | 314 | Fire Sprinkler System Wet Pipe 4.0 Inches. Perform 5 year inspection, perform batch testing on all sprinkler heads, test or replace 1.5” fire hose cabinet, replace corroded sprinkler in janitor’s closet, install control valves on risers in basement. | 1 | LS | $ - 0 | 11,062 | SF | $ - 0 | 1 | LS | $ - 0 | $ - 0 |
| 2 | Cowles Lodge | 215 | Fire Sprinkler System Dry Pipe 3.0 Inches. Perform 5 year inspection, perform batch testing on all sprinkler heads, replace gauges, perform internals on dry system, check valve, and FDC piping. Repair damaged sprinkler head that has been temporarily patched. | 1 | LS | 6,250 | SF | 1 | LS | ||||
| 3 | Cabin 1 - Jack Pine | 210 | Fire Sprinkler System, Residential Pipe 1.0 Inch. Perform 5 year inspection, replace all sprinkler heads, remove all antifreeze from system and replace with new code compliant antifreeze, install signs on control valves, perform internal inspection, replace gauges, install sprinkler box, spare sprinkler heads, and wrench. (Each Building) | 1 | LS | 576 | SF | 1 | LS | ||||
| 4 | Cabin 2 - Black Cherry | 211 | 1 | LS | 576 | SF | 1 | LS | |||||
| 5 | Cabin 3 - Sassafras | 212 | 1 | LS | 576 | SF | 1 | LS | |||||
| 6 | Cabin 4 - Cottonwood | 213 | 1 | LS | 576 | SF | 1 | LS | |||||
| 7 | Cabin 5 - Sugar Maple | 214 | 1 | LS | 576 | SF | 1 | LS | |||||
| 8 | Cabin 6 - White Pine | 216 | 1 | LS | 576 | SF | 1 | LS | |||||
| 9 | Cabin 7 - Black Oak | 217 | 1 | LS | 576 | SF | 1 | LS | |||||
| 10 | Cabin 8 - Service Berry | 218 | 1 | LS | 576 | SF | 1 | LS | |||||
| 11 | Cabin 9 - Paper Birch | 219 | 1 | LS | 576 | SF | 1 | LS | |||||
| 12 | Cabin 10 - Witch Hazel | 220 | 1 | LS | 576 | SF | 1 | LS |
| Price Schedule (OPTIONS) | |||||||||||||
| DESCRIPTION | LABOR | MATERIALS | EQUIPMENT | TOTALS OPTIONS* | |||||||||
| OPTION | LOCATION | BLDG NO. | DESCRIPTION | QNTY* | UNITS* | AMOUNT* | QNTY* | UNITS* | AMOUNT* | QNTY* | UNITS* | AMOUNT* | |
| 1 | Director Cabin | 203 | Fire Sprinkler Dry Pipe 3.0 Inch. Perform 5 year inspection, perform batch testing on all sprinkler heads, replace gauges. | 1 | LS | $ - 0 | 740 | SF | $ - 0 | 1 | LS | $ - 0 | $ - 0 |
| 2 | Staff Cabin | 204 | Fire Sprinkler Dry Pipe 3.0 Inch. Perform 5 year inspection, perform batch testing on all sprinkler heads, replace gauges. | 1 | LS | $ - 0 | 720 | SF | $ - 0 | 1 | LS | $ - 0 | $ - 0 |
| 3 | Caretakers House | 205 | Fire Sprinkler System Residential, Pipe 1.5 Inch. Perform 5 year inspection, perform batch testing on all sprinkler heads, replace gauges. | 1 | LS | $ - 0 | 1,275 | SF | $ - 0 | 1 | LS | $ - 0 | $ - 0 |
| 4 | Sears House | 209 HS-499Z | Fire Sprinkler System Residential, Pipe 1.0 Inch. Perform 5 year inspection, perform batch testing on all sprinkler heads, replace gauges, repair or replace backflow preventer. | 1 | LS | $ - 0 | 2,700 | SF | $ - 0 | 1 | LS | $ - 0 | $ - 0 |
| 5 | US 20 Dorm | 507 | Fire Sprinkler System. Perform 5 year inspection, perform batch testing on all sprinkler heads, replace gauges. | 1 | LS | $ - 0 | 2,146 | SF | $ - 0 | 1 | LS | $ - 0 | $ - 0 |
| TOTAL (ALL OPTIONS) | $ - 0 |
GRAND TOTAL (BASE + ALL OPTIONS) $ - 0
| *NOTE all quantities have been estimated. It is the responsibility of the offeror to verify all quantities and ensure that quote covers the completion of entire project. |
| *NOTE offerors are responsible for ensuring all amounts/formulas are accurate. |
| *NOTE LS = Lump Sum / SF = Square Feet |
image1.png
File details come from the government source that posted it. Updated .