UPDATED_Price_Schedule_0001.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
INDU Fire Suppression System Inspection & Testing Federal contract opportunity
Solicitation number
140P6425Q0034
Issued by
Department of the Interior National Park Service Midwest Region

About this file

The file is an updated Price Schedule for a fire protection system inspection and testing project at Indiana Dunes National Park. The solicitation (140P6425Q0034) is a small business set-aside for comprehensive fire suppression system services across multiple park buildings, including detailed inspections, testing, and repairs for wet and dry pipe sprinkler systems in locations such as Douglas Center, Cowles Lodge, and ten cabin structures. The project involves performing 5-year inspections, batch testing sprinkler heads, replacing gauges, repairing damaged components, and installing control valves and signage.

The contract is issued by the Department of the Interior National Park Service Midwest Region, with a 120-day performance period expected to be awarded in August 2025. Offerors are required to submit a quote package by August 5, 2025, at 12:00 PM ET, including a price schedule, evidence of technical capability, SAM Unique Entity ID, and amendment acknowledgments. A mandatory site visit is scheduled for July 23, 2025, at 9:00 AM CT at the Dunes Learning Center Parking Lot in Porter, IN. The project is classified under NAICS code 561621 with a small business size standard of $25.0M, and Service Contract Act Wage Determinations for Porter and Lake Counties, Indiana, will apply.

View the file

Other files for this federal contract opportunity

Other files attached to INDU Fire Suppression System Inspection & Testing, newest first.
File Type Posted
Sol_140P6425Q0034_Amd_0001.pdf PDF
Questions___Answers_0001.pdf PDF
NPS_Structural_Fire_Management_Program.pdf PDF
Price_Schedule.xlsx XLSX spreadsheet
SCA_WD_-_Porter_County___Lake_County__IN.pdf PDF
Location_Maps.pdf PDF
HFP_Inspection_Report.pdf PDF
Statement_of_Work.pdf PDF
Sol_140P6425Q0034.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE

UNITED STATES DEPARTMENT OF THE INTERIOR
National Park Services
Indiana Dunes National Park
Fire Protection System Inspection & Testing
Price Schedule (BASE)
DESCRIPTIONLABORMATERIALSEQUIPMENTTOTAL BASE*
BASELOCATIONBLDG NO.DESCRIPTIONQNTY*UNITS*AMOUNT*QNTY*UNITS*AMOUNT*QNTY*UNITS*AMOUNT*
1Douglas Center314Fire Sprinkler System Wet Pipe 4.0 Inches. Perform 5 year inspection, perform batch testing on all sprinkler heads, test or replace 1.5” fire hose cabinet, replace corroded sprinkler in janitor’s closet, install control valves on risers in basement.1LS$ - 011,062SF$ - 01LS$ - 0$ - 0
2Cowles Lodge215Fire Sprinkler System Dry Pipe 3.0 Inches. Perform 5 year inspection, perform batch testing on all sprinkler heads, replace gauges, perform internals on dry system, check valve, and FDC piping. Repair damaged sprinkler head that has been temporarily patched.1LS6,250SF1LS
3Cabin 1 - Jack Pine210Fire Sprinkler System, Residential Pipe 1.0 Inch. Perform 5 year inspection, replace all sprinkler heads, remove all antifreeze from system and replace with new code compliant antifreeze, install signs on control valves, perform internal inspection, replace gauges, install sprinkler box, spare sprinkler heads, and wrench. (Each Building)1LS576SF1LS
4Cabin 2 - Black Cherry2111LS576SF1LS
5Cabin 3 - Sassafras2121LS576SF1LS
6Cabin 4 - Cottonwood2131LS576SF1LS
7Cabin 5 - Sugar Maple2141LS576SF1LS
8Cabin 6 - White Pine2161LS576SF1LS
9Cabin 7 - Black Oak2171LS576SF1LS
10Cabin 8 - Service Berry2181LS576SF1LS
11Cabin 9 - Paper Birch2191LS576SF1LS
12Cabin 10 - Witch Hazel220Same as cabins 1-9 above, but add replacement of backflow preventer.1LS576SF1LS
Price Schedule (OPTIONS)
DESCRIPTIONLABORMATERIALSEQUIPMENTTOTALS OPTIONS*
OPTIONLOCATIONBLDG NO.DESCRIPTIONQNTY*UNITS*AMOUNT*QNTY*UNITS*AMOUNT*QNTY*UNITS*AMOUNT*
1Director Cabin203Fire Sprinkler Dry Pipe 3.0 Inch. Perform 5 year inspection, perform batch testing on all sprinkler heads, replace gauges.1LS$ - 0740SF$ - 01LS$ - 0$ - 0
2Staff Cabin204Fire Sprinkler Dry Pipe 3.0 Inch. Perform 5 year inspection, perform batch testing on all sprinkler heads, replace gauges.1LS$ - 0720SF$ - 01LS$ - 0$ - 0
3Caretakers House205Fire Sprinkler System Residential, Pipe 1.5 Inch. Perform 5 year inspection, perform batch testing on all sprinkler heads, replace gauges.1LS$ - 01,275SF$ - 01LS$ - 0$ - 0
4Sears House209 HS-499ZFire Sprinkler System Residential, Pipe 1.0 Inch. Perform 5 year inspection, perform batch testing on all sprinkler heads, replace gauges, repair or replace backflow preventer.1LS$ - 02,700SF$ - 01LS$ - 0$ - 0
5US 20 Dorm507Fire Sprinkler System. Perform 5 year inspection, perform batch testing on all sprinkler heads, replace gauges.1LS$ - 02,146SF$ - 01LS$ - 0$ - 0
TOTAL (ALL OPTIONS)$ - 0

GRAND TOTAL (BASE + ALL OPTIONS) $ - 0

*NOTE all quantities have been estimated. It is the responsibility of the offeror to verify all quantities and ensure that quote covers the completion of entire project.
*NOTE offerors are responsible for ensuring all amounts/formulas are accurate.
*NOTE LS = Lump Sum / SF = Square Feet