PRICE SCHEDULE.docx
DOCX document 19 KB Posted
- Attached to
- Expand Electrical Distribution Federal contract opportunity
- Solicitation number
- 36C24823R0102
About this file
This price schedule document outlines 18 alternates for a construction contract to expand electrical distribution for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The base bid is to completely prepare the site for building operations including demolition and removal of existing structures, and furnish labor, materials, and work to complete the project according to drawings and specifications. The period of performance is 365 calendar days from an estimated start of September 2023 through completion by September 2024. The price schedule then lists 18 deductive alternates that would reduce the scope of work and cost by eliminating specific aspects of the project, such as automatic transfer switches, feeders, circuit breakers, roof work, electrical closets, and conduit/wiring. Unit pricing is not included, as the contractor would fill this in upon bid submission.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI QUESTIONS and GOVERNMENT RESPONSES.docx | DOCX document | |
| 5 SOW 573A4-18-601 (REV).docx | DOCX document | |
| 3 CATEX Form_573A4-18-601.pdf | ||
| S02 AMEND 36C24823R0102 0002 RFI.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NUMBER
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
(Base Bid) Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Project 573A4-18-601 Expand Electrical Distribution as required by drawings and specifications in accordance with contract terms and conditions.
Period of Performance: 365 calendar days.
Contract Period: Base POP Begin: 09-20-2023 POP End: 09-19-2024 PRINCIPAL NAICS CODE: 237130 - Power and Communication Line and Related Structures Construction PRODUCT/SERVICE CODE: N061 - Installation of Equipment - Electric Wire and Power Distribution Equipment Note: The POP Begin, and POP End are estimated dates. Upon notice to proceed issuance, dates will be updated through a modification.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Deduct Alternate No.1: (Deduct Alternate No. 1 is inclusive of Base Bid minus Item 0002) Eliminate the Critical #1 ATS (C1ATS).
Contract Period: Base POP Begin: 09-20-2023 POP End: 09-19-2024
| 1.00 |
| JB |
| __________________ |
| __________________ |
Deduct Alternate No. 2: (Deduct Alternate No. 2 is inclusive of Base Bid minus Items 0002 and 0003) Eliminate the Critical #2 ATS (C2ATS).
| 1.00 |
| JB |
| __________________ |
| __________________ |
Alternate No. 3: (Deduct Alternate No. 3 is inclusive of Base Bid minus Items 0002, 0003, and 0004) Eliminate the Equipment ATS (EATS).
| 1.00 |
| JB |
| __________________ |
| __________________ |
Alternate No. 4: (Deduct Alternate No. 4 is inclusive of Base Bid 0002, 0003, 0004, and 0005) Eliminate all work associated with refeeding the fire pump, including conduit, wire, MI cable, etc.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Alternate No. 5: (Deduct Alternate No. 5 is inclusive of Base Bid minus Items 0002, 0003, 0004, 0005, and 0006) Eliminate the normal feed to the three ATS (EATS, C1ATS, and C2ATS), including conduit, wire, and terminations.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Alternate No. 6: (Deduct Alternate No. 6 is inclusive of Base Bid minus Items 0002, 0003, 0004, 0005, 0006 and 0007) Eliminate the emergency feed to the three ATS (EATS, C1ATS, and C2ATS), including conduit, wire, and terminations.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Alternate No. 7: (Deduct Alternate No. 7 is inclusive of Base Bid minus Items 0002, 0003, 0004, 0005, 0006, 0007 and 0008) Eliminate the six circuit breakers feeding the three ATS. Assume 4x400 amp, molded case breakers, and 2x800amp molded case breakers.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Alternate No. 8: (Deduct Alternate No. 8 is inclusive of Base Bid minus Items 0002, 0003, 0004, 0005, 0006, 0007, 0008 and 0009) Keep the two exhaust fans and associated wiring on the generator building roof.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Alternate No. 9: (Deduct Alternate No. 9 is inclusive of Base Bid minus Deduct Alternate 8 is inclusive of Base Bid minus Items 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009 and 0010) Do not reroof the generator building.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Alternate No. 10: (Deduct Alternate No. 10 is inclusive of Base Bid minus Items 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010 and 0011) Keep the two exhaust fans and associated wiring on the substation building roof.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Alternate No. 11: (Deduct Alternate No. 11 is inclusive of Base Bid minus Items 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011 and 0012) Do not reroof the substation building.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Alternate No. 12: (Deduct Alternate No. 12 is inclusive of Base Bid minus Items 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012 and 0013) Eliminate fitting out the fourth-floor vertical electrical closet.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Alternate No. 13: (Deduct Alternate 13 is inclusive of Base Bid minus Items 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013 and 0014) Eliminate fitting out the third-floor vertical electrical closet.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Alternate No. 14: (Deduct Alternate No. 14 is inclusive of Base Bid minus Items 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014 and 0015) Do not install the conduit from the generator equipment room to the fire pump.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Alternate No. 15: (Deduct Alternate No. 15 is inclusive of Base Bid minus Items 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015 and 0016) Eliminate installing the empty conduit to the fire pump. The approximate distance is 100’.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Alternate No. 16: (Deduct Alternate No. 16 is inclusive of Base Bid minus Items 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016 and 0017) Eliminate gutting and reworking the basement vertical closet.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Alternate No. 17: (Deduct Alternate No. 17 is inclusive of Base Bid minus Items 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, 0012, 0013, 0014, 0015, 0016, 0017 and 0018) Eliminate removing the ceilings in all the vertical closets.
| GRAND TOTAL |
| __________________ |