Price Schedule Center Hill OandM Services 2026 2031 Rev2.xlsx

XLSX spreadsheet 56 KB Posted

Attached to
Center Hill Lake OandM Requirement Contract 2026 through 2031
Solicitation number
W912P526RA005
Issued by

About this file

This is a Price Schedule Excel file for the Center Hill Lake Operations and Maintenance (O&M) Requirements Contract from February 2026 to January 2031. The contract is a 100% small business set-aside for the U.S. Army Corps of Engineers Nashville District, covering comprehensive maintenance services at Center Hill Lake in Tennessee. The contract includes a base year and four one-year option periods, with requirements spanning multiple service categories such as grass mowing, cleaning services, janitorial services, facility repairs, equipment operation, beach maintenance, herbicide application, and various site-specific maintenance tasks across locations like Center Hill Dam, recreation areas, and power plant facilities.

The pricing schedule is structured across 12 sections with zero-dollar placeholder pricing, covering activities like grass mowing at multiple sites, cleaning recreational facilities, janitorial services, facility repairs, primitive site cleaning, herbicide application, boundary line marking, beach water testing, septic tank pumping, beach and playground maintenance, pavement striping, and power plant janitorial services. The contract is a firm-fixed price requirements contract anticipated to be awarded electronically through the Army's PIEE system, with vendors required to be registered in the System for Award Management (SAM). The contract encompasses areas in DeKalb, Putnam, White, and Warren Counties of Tennessee, near cities like Smithville, Cookeville, and Sparta.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Contract Year Base Year, February 1, 2026 - January 31, 2027

This is a Requirements Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment and vehicles required to perform operations and maintenance services and limited construction at Center Hill Lake in accordance with the Technical Provisions.

Section C-2: Grass Mowing and Maintenance of Landscaped Areas
Item #Maximum QuantityUnitUnit PriceAmount
0001Center Hill Dam Bottom and Downstream (Random Fill/other Areas)6EA$0.00
0002Center Hill Dam Embankment6EA$0.00
0003Floating Mill Recreation Area17EA$0.00
0004Hurricane Bridge Day Use14EA$0.00
0005Johnson's Chapel Day Use14EA$0.00
0006Long Branch Recreation Area18EA$0.00
0007Ragland Bottom Recreation Area17EA$0.00
0008Resource Manager's Office / Operations Area/ Buffalo Valley/Overlook17EA$0.00
0009Center Hill Park17EA$0.00
0010Cane Hollow14EA$0.00
SECTION C-2 ...................... SUBTOTAL$0.00
Section C-3: Cleaning Services of Recreational Facilities and Areas
Maximum QuantityUnitUnit PriceAmount
0011Campsites6,000EA$0.00
0012Dumpsters1,000EA$0.00
0013Fish Cleaning Stations375EA$0.00
0014Litter Removal2,500EA$0.00
0015Picnic Shelters1,200EA$0.00
0016Restroom Cleaning1,750EA$0.00
0017Washhouse Cleaning1,550EA$0.00

SECTION C-3 ...................... SUBTOTAL $0.00

Section C-4: Janitorial Services
Item #Maximum QuantityUnitUnit PriceAmount
0018Resource Managers Office/Visitors Center12MO$0.00
0019Maintenance Compound Service Base12MO$0.00

SECTION C-4...................... SUBTOTAL $0.00

Section C-5: Facility Repair, Maintenance and Other Non-Routine Work
Quantity
Item #Title/Description(MAX)UnitUnit PriceAmount
NOTE: Item #'s 0020 - 0042 : Bid should be based on Service Wage Rates
0020Emergency Work Surcharge40HR$0.00
0021Carpenter, Maintenance200HR$0.00
0022Electrician, Maintenance200HR$0.00
0023Laborer, Grounds Maintenance3,000HR$0.00
0024Laborer, General Maintenance1,500HR$0.00
0025Painter, Maintenance100HR$0.00
0026Plumber, Maintenance200HR$0.00
0027Backhoe/Loader (equip Case 580)**400HR$0.00
0028Chainsaw, Gas, Min. 16" bar*400HR$0.00
0029Skid Loader (Equiv CAT 259e)**400HR$0.00
0030Skid Loader w/Forestry Cutter**300HR$0.00
0031Truck, 1/2 Ton Pickup*100HR$0.00
0032Truck, Dump (14 TN)*300HR$0.00
0033Personnel Lift (Bucket Truck )*400HR$0.00
0034Man Lift 50' *200HR$0.00
0035Brush Chipper *400HR$0.00
0036Trailer, Equipment, 12 TN100HR$0.00
0037Trailer, Utility 16'-20'100HR$0.00
0038Tractor (equiv 4,000 Ford) **100HR$0.00
0039Tractor, 4x4, w Side Arm Attachment**200HR$0.00
0040Dozer (equiv Caterpillar D-6)**100HR$0.00
0041Trencher w/(Eq Ditchwitch 3700)**100HR$0.00
0042Trencher w/ Rock Saw Attachment**60HR$0.00
* Operator with Equipment*
** Operator/Trailer with Equipment**

SECTION C-5 ........................ SUBTOTAL $0.00

Section C-6: Cleaning Services Primitive Sites
Item #Maximum QuantityUnitUnit PriceAmount
0043Primitive Camping / Remote Access Area Cleaning240EA$0.00

SECTION C-6 ........................ SUBTOTAL $0.00

Section C-7: Herbicide Application
Item #Maximum QuantityUnitUnit PriceAmount
0044Herbicide (Hyvar, Banvel or equiv)45AC$0.00

SECTION C-7 ....................... SUBTOTAL $0.00

Section C-8: Marking and Painting Boundary Line
Item #Maximum QuantityUnitUnit PriceAmount
0045Mark and Paint Boundary Line60MI$0.00

SECTION C-8 ...................... SUBTOTAL $0.00

Section C-9: Beach Water Testing and Septic Tank Pumping
Item #Maximum QuantityUnitAmount
0046Beach Water Testing50EA$0.00
0047Septic Tank Pumping40,000GL$0.00

SECTION C-9 ....................... SUBTOTAL $0.00

Section C-10: Beach and Playground Maintenance
Item #Maximum QuantityUnitUnit PriceAmount
0048Routine Beach Maintenance72EA$0.00
0049Routine Playground Maintenance90EA$0.00
0050Annual Beach Maintenance3EA$0.00

SECTION C-10 ...................... SUBTOTAL $0.00

Section C-11: Pavement Striping and Sealing
Item #Maximum QuantityUnitUnit PriceAmount
0051Pavement Sealing25,000SY$0.00
0052Re-Striping25,000LF$0.00

SECTION C-11........................ SUBTOTAL $0.00

Section C-12: Janitorial Services - Center Hill Power Plant
Item #Maximum QuantityUnitUnit PriceAmount
0053Center Hill Power Plant12MO$0.00

SECTION C-12 ....................... SUBTOTAL $0.00

SCHEDULE SUMMARY
SUBTOTAL
SECTION C2: Grass Mowing and Maintenance of Landscaped Areas$0.00
SECTION C3: Cleaning Services of Recreational Facilities and Areas$0.00
SECTION C4: Janitorial Services$0.00
SECTION C5: Facility Repair, Maintenance and Other Non-Routine Work$0.00
SECTION C6: Cleaning Services Primitive Sites$0.00
SECTION C7: Herbicide Application$0.00
SECTION C8: Marking and Painting Boundary Line$0.00
SECTION C9: Beach Water Testing and Septic Tank Pumping$0.00
SECTION C10: Beach and Playground Maintenance$0.00
SECTION C11: Pavement Striping and Sealing$0.00
SECTION C12: Janitorial Services - Center Hill Power Plant$0.00
TOTAL BASE YEAR$0.00

Option Year 1 Option Year 1, February 1, 2027 - January 31, 2028

This is a Requirements Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment and vehicles required to perform operations and maintenance services and limited construction at Center Hill Lake in accordance with the Technical Provisions.

Section C-2: Grass Mowing and Maintenance of Landscaped Areas
Item #Maximum QuantityUnitUnit PriceAmount
0001Center Hill Dam Bottom and Downstream (Random Fill/other Areas)6EA$0.00
0002Center Hill Dam Embankment6EA$0.00
0003Floating Mill Recreation Area17EA$0.00
0004Hurricane Bridge Day Use14EA$0.00
0005Johnson's Chapel Day Use14EA$0.00
0006Long Branch Recreation Area18EA$0.00
0007Ragland Bottom Recreation Area17EA$0.00
0008Resource Manager's Office / Operations Area/ Buffalo Valley/Overlook17EA$0.00
0009Center Hill Park17EA$0.00
0010Cane Hollow14EA$0.00
SECTION C-2 ...................... SUBTOTAL$0.00
Section C-3: Cleaning Services of Recreational Facilities and Areas
Maximum QuantityUnitUnit PriceAmount
0011Campsites6,000EA$0.00
0012Dumpsters1,000EA$0.00
0013Fish Cleaning Stations375EA$0.00
0014Litter Removal2,500EA$0.00
0015Picnic Shelters1,200EA$0.00
0016Restroom Cleaning1,750EA$0.00
0017Washhouse Cleaning1,550EA$0.00

SECTION C-3 ...................... SUBTOTAL $0.00

Section C-4: Janitorial Services
Item #Maximum QuantityUnitUnit PriceAmount
0018Resource Managers Office/Visitors Center12MO$0.00
0019Maintenance Compound Service Base12MO$0.00

SECTION C-4...................... SUBTOTAL $0.00

Section C-5: Facility Repair, Maintenance and Other Non-Routine Work
Quantity
Item #Title/Description(MAX)UnitUnit PriceAmount
NOTE: Item #'s 0020 - 0042 : Bid should be based on Service Wage Rates
0020Emergency Work Surcharge40HR$0.00
0021Carpenter, Maintenance200HR$0.00
0022Electrician, Maintenance200HR$0.00
0023Laborer, Grounds Maintenance3,000HR$0.00
0024Laborer, General Maintenance1,500HR$0.00
0025Painter, Maintenance100HR$0.00
0026Plumber, Maintenance200HR$0.00
0027Backhoe/Loader (equip Case 580)**400HR$0.00
0028Chainsaw, Gas, Min. 16" bar*400HR$0.00
0029Skid Loader (Equiv CAT 259e)**400HR$0.00
0030Skid Loader w/Forestry Cutter**300HR$0.00
0031Truck, 1/2 Ton Pickup*100HR$0.00
0032Truck, Dump (14 TN)*300HR$0.00
0033Personnel Lift (Bucket Truck )*400HR$0.00
0034Man Lift 50' *200HR$0.00
0035Brush Chipper *400HR$0.00
0036Trailer, Equipment, 12 TN100HR$0.00
0037Trailer, Utility 16'-20'100HR$0.00
0038Tractor (equiv 4,000 Ford) **100HR$0.00
0039Tractor, 4x4, w Side Arm Attachment**200HR$0.00
0040Dozer (equiv Caterpillar D-6)**100HR$0.00
0041Trencher w/(Eq Ditchwitch 3700)**100HR$0.00
0042Trencher w/ Rock Saw Attachment**60HR$0.00
* Operator with Equipment*
** Operator/Trailer with Equipment**

SECTION C-5 ........................ SUBTOTAL $0.00

Section C-6: Cleaning Services Primitive Sites
Item #Maximum QuantityUnitUnit PriceAmount
0043Primitive Camping / Remote Access Area Cleaning240EA$0.00

SECTION C-6 ........................ SUBTOTAL $0.00

Section C-7: Herbicide Application
Item #Maximum QuantityUnitUnit PriceAmount
0044Herbicide (Hyvar, Banvel or equiv)45AC$0.00

SECTION C-7 ....................... SUBTOTAL $0.00

Section C-8: Marking and Painting Boundary Line
Item #Maximum QuantityUnitUnit PriceAmount
0045Mark and Paint Boundary Line60MI$0.00

SECTION C-8 ...................... SUBTOTAL $0.00

Section C-9: Beach Water Testing and Septic Tank Pumping
Item #Maximum QuantityUnitAmount
0046Beach Water Testing50EA$0.00
0047Septic Tank Pumping40,000GL$0.00

SECTION C-9 ....................... SUBTOTAL $0.00

Section C-10: Beach and Playground Maintenance
Item #Maximum QuantityUnitUnit PriceAmount
0048Routine Beach Maintenance72EA$0.00
0049Routine Playground Maintenance90EA$0.00
0050Annual Beach Maintenance3EA$0.00

SECTION C-10 ...................... SUBTOTAL $0.00

Section C-11: Pavement Striping and Sealing
Item #Maximum QuantityUnitUnit PriceAmount
0051Pavement Sealing25,000SY$0.00
0052Re-Striping25,000LF$0.00

SECTION C-11........................ SUBTOTAL $0.00

Section C-12: Janitorial Services - Center Hill Power Plant
Item #Maximum QuantityUnitUnit PriceAmount
0053Center Hill Power Plant12MO$0.00

SECTION C-12 ....................... SUBTOTAL $0.00

SCHEDULE SUMMARY
SUBTOTAL
SECTION C2: Grass Mowing and Maintenance of Landscaped Areas$0.00
SECTION C3: Cleaning Services of Recreational Facilities and Areas$0.00
SECTION C4: Janitorial Services$0.00
SECTION C5: Facility Repair, Maintenance and Other Non-Routine Work$0.00
SECTION C6: Cleaning Services Primitive Sites$0.00
SECTION C7: Herbicide Application$0.00
SECTION C8: Marking and Painting Boundary Line$0.00
SECTION C9: Beach Water Testing and Septic Tank Pumping$0.00
SECTION C10: Beach and Playground Maintenance$0.00
SECTION C11: Pavement Striping and Sealing$0.00
SECTION C12: Janitorial Services - Center Hill Power Plant$0.00
TOTAL BASE YEAR$0.00

Option Year 2 Option Year 2, February 1, 2028 - January 31, 2029

This is a Requirements Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment and vehicles required to perform operations and maintenance services and limited construction at Center Hill Lake in accordance with the Technical Provisions.

Section C-2: Grass Mowing and Maintenance of Landscaped Areas
Item #Maximum QuantityUnitUnit PriceAmount
0001Center Hill Dam Bottom and Downstream (Random Fill/other Areas)6EA$0.00
0002Center Hill Dam Embankment6EA$0.00
0003Floating Mill Recreation Area17EA$0.00
0004Hurricane Bridge Day Use14EA$0.00
0005Johnson's Chapel Day Use14EA$0.00
0006Long Branch Recreation Area18EA$0.00
0007Ragland Bottom Recreation Area17EA$0.00
0008Resource Manager's Office / Operations Area/ Buffalo Valley/Overlook17EA$0.00
0009Center Hill Park17EA$0.00
0010Cane Hollow14EA$0.00
SECTION C-2 ...................... SUBTOTAL$0.00
Section C-3: Cleaning Services of Recreational Facilities and Areas
Maximum QuantityUnitUnit PriceAmount
0011Campsites6,000EA$0.00
0012Dumpsters1,000EA$0.00
0013Fish Cleaning Stations375EA$0.00
0014Litter Removal2,500EA$0.00
0015Picnic Shelters1,200EA$0.00
0016Restroom Cleaning1,750EA$0.00
0017Washhouse Cleaning1,550EA$0.00

SECTION C-3 ...................... SUBTOTAL $0.00

Section C-4: Janitorial Services
Item #Maximum QuantityUnitUnit PriceAmount
0018Resource Managers Office/Visitors Center12MO$0.00
0019Maintenance Compound Service Base12MO$0.00

SECTION C-4...................... SUBTOTAL $0.00

Section C-5: Facility Repair, Maintenance and Other Non-Routine Work
Quantity
Item #Title/Description(MAX)UnitUnit PriceAmount
NOTE: Item #'s 0020 - 0042 : Bid should be based on Service Wage Rates
0020Emergency Work Surcharge40HR$0.00
0021Carpenter, Maintenance200HR$0.00
0022Electrician, Maintenance200HR$0.00
0023Laborer, Grounds Maintenance3,000HR$0.00
0024Laborer, General Maintenance1,500HR$0.00
0025Painter, Maintenance100HR$0.00
0026Plumber, Maintenance200HR$0.00
0027Backhoe/Loader (equip Case 580)**400HR$0.00
0028Chainsaw, Gas, Min. 16" bar*400HR$0.00
0029Skid Loader (Equiv CAT 259e)**400HR$0.00
0030Skid Loader w/Forestry Cutter**300HR$0.00
0031Truck, 1/2 Ton Pickup*100HR$0.00
0032Truck, Dump (14 TN)*300HR$0.00
0033Personnel Lift (Bucket Truck )*400HR$0.00
0034Man Lift 50' *200HR$0.00
0035Brush Chipper *400HR$0.00
0036Trailer, Equipment, 12 TN100HR$0.00
0037Trailer, Utility 16'-20'100HR$0.00
0038Tractor (equiv 4,000 Ford) **100HR$0.00
0039Tractor, 4x4, w Side Arm Attachment**200HR$0.00
0040Dozer (equiv Caterpillar D-6)**100HR$0.00
0041Trencher w/(Eq Ditchwitch 3700)**100HR$0.00
0042Trencher w/ Rock Saw Attachment**60HR$0.00
* Operator with Equipment*
** Operator/Trailer with Equipment**

SECTION C-5 ........................ SUBTOTAL $0.00

Section C-6: Cleaning Services Primitive Sites
Item #Maximum QuantityUnitUnit PriceAmount
0043Primitive Camping / Remote Access Area Cleaning240EA$0.00

SECTION C-6 ........................ SUBTOTAL $0.00

Section C-7: Herbicide Application
Item #Maximum QuantityUnitUnit PriceAmount
0044Herbicide (Hyvar, Banvel or equiv)45AC$0.00

SECTION C-7 ....................... SUBTOTAL $0.00

Section C-8: Marking and Painting Boundary Line
Item #Maximum QuantityUnitUnit PriceAmount
0045Mark and Paint Boundary Line60MI$0.00

SECTION C-8 ...................... SUBTOTAL $0.00

Section C-9: Beach Water Testing and Septic Tank Pumping
Item #Maximum QuantityUnitAmount
0046Beach Water Testing50EA$0.00
0047Septic Tank Pumping40,000GL$0.00

SECTION C-9 ....................... SUBTOTAL $0.00

Section C-10: Beach and Playground Maintenance
Item #Maximum QuantityUnitUnit PriceAmount
0048Routine Beach Maintenance72EA$0.00
0049Routine Playground Maintenance90EA$0.00
0050Annual Beach Maintenance3EA$0.00

SECTION C-10 ...................... SUBTOTAL $0.00

Section C-11: Pavement Striping and Sealing
Item #Maximum QuantityUnitUnit PriceAmount
0051Pavement Sealing25,000SY$0.00
0052Re-Striping25,000LF$0.00

SECTION C-11........................ SUBTOTAL $0.00

Section C-12: Janitorial Services - Center Hill Power Plant
Item #Maximum QuantityUnitUnit PriceAmount
0053Center Hill Power Plant12MO$0.00

SECTION C-12 ....................... SUBTOTAL $0.00

SCHEDULE SUMMARY
SUBTOTAL
SECTION C2: Grass Mowing and Maintenance of Landscaped Areas$0.00
SECTION C3: Cleaning Services of Recreational Facilities and Areas$0.00
SECTION C4: Janitorial Services$0.00
SECTION C5: Facility Repair, Maintenance and Other Non-Routine Work$0.00
SECTION C6: Cleaning Services Primitive Sites$0.00
SECTION C7: Herbicide Application$0.00
SECTION C8: Marking and Painting Boundary Line$0.00
SECTION C9: Beach Water Testing and Septic Tank Pumping$0.00
SECTION C10: Beach and Playground Maintenance$0.00
SECTION C11: Pavement Striping and Sealing$0.00
SECTION C12: Janitorial Services - Center Hill Power Plant$0.00
TOTAL BASE YEAR$0.00

Option Year 3 Option Year 3, February 1, 2029 - January 31, 2030

This is a Requirements Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment and vehicles required to perform operations and maintenance services and limited construction at Center Hill Lake in accordance with the Technical Provisions.

Section C-2: Grass Mowing and Maintenance of Landscaped Areas
Item #Maximum QuantityUnitUnit PriceAmount
0001Center Hill Dam Bottom and Downstream (Random Fill/other Areas)6EA$0.00
0002Center Hill Dam Embankment6EA$0.00
0003Floating Mill Recreation Area17EA$0.00
0004Hurricane Bridge Day Use14EA$0.00
0005Johnson's Chapel Day Use14EA$0.00
0006Long Branch Recreation Area18EA$0.00
0007Ragland Bottom Recreation Area17EA$0.00
0008Resource Manager's Office / Operations Area/ Buffalo Valley/Overlook17EA$0.00
0009Center Hill Park17EA$0.00
0010Cane Hollow14EA$0.00
SECTION C-2 ...................... SUBTOTAL$0.00
Section C-3: Cleaning Services of Recreational Facilities and Areas
Maximum QuantityUnitUnit PriceAmount
0011Campsites6,000EA$0.00
0012Dumpsters1,000EA$0.00
0013Fish Cleaning Stations375EA$0.00
0014Litter Removal2,500EA$0.00
0015Picnic Shelters1,200EA$0.00
0016Restroom Cleaning1,750EA$0.00
0017Washhouse Cleaning1,550EA$0.00

SECTION C-3 ...................... SUBTOTAL $0.00

Section C-4: Janitorial Services
Item #Maximum QuantityUnitUnit PriceAmount
0018Resource Managers Office/Visitors Center12MO$0.00
0019Maintenance Compound Service Base12MO$0.00

SECTION C-4...................... SUBTOTAL $0.00

Section C-5: Facility Repair, Maintenance and Other Non-Routine Work
Quantity
Item #Title/Description(MAX)UnitUnit PriceAmount
NOTE: Item #'s 0020 - 0042 : Bid should be based on Service Wage Rates
0020Emergency Work Surcharge40HR$0.00
0021Carpenter, Maintenance200HR$0.00
0022Electrician, Maintenance200HR$0.00
0023Laborer, Grounds Maintenance3,000HR$0.00
0024Laborer, General Maintenance1,500HR$0.00
0025Painter, Maintenance100HR$0.00
0026Plumber, Maintenance200HR$0.00
0027Backhoe/Loader (equip Case 580)**400HR$0.00
0028Chainsaw, Gas, Min. 16" bar*400HR$0.00
0029Skid Loader (Equiv CAT 259e)**400HR$0.00
0030Skid Loader w/Forestry Cutter**300HR$0.00
0031Truck, 1/2 Ton Pickup*100HR$0.00
0032Truck, Dump (14 TN)*300HR$0.00
0033Personnel Lift (Bucket Truck )*400HR$0.00
0034Man Lift 50' *200HR$0.00
0035Brush Chipper *400HR$0.00
0036Trailer, Equipment, 12 TN100HR$0.00
0037Trailer, Utility 16'-20'100HR$0.00
0038Tractor (equiv 4,000 Ford) **100HR$0.00
0039Tractor, 4x4, w Side Arm Attachment**200HR$0.00
0040Dozer (equiv Caterpillar D-6)**100HR$0.00
0041Trencher w/(Eq Ditchwitch 3700)**100HR$0.00
0042Trencher w/ Rock Saw Attachment**60HR$0.00
* Operator with Equipment*
** Operator/Trailer with Equipment**

SECTION C-5 ........................ SUBTOTAL $0.00

Section C-6: Cleaning Services Primitive Sites
Item #Maximum QuantityUnitUnit PriceAmount
0043Primitive Camping / Remote Access Area Cleaning240EA$0.00

SECTION C-6 ........................ SUBTOTAL $0.00

Section C-7: Herbicide Application
Item #Maximum QuantityUnitUnit PriceAmount
0044Herbicide (Hyvar, Banvel or equiv)45AC$0.00

SECTION C-7 ....................... SUBTOTAL $0.00

Section C-8: Marking and Painting Boundary Line
Item #Maximum QuantityUnitUnit PriceAmount
0045Mark and Paint Boundary Line60MI$0.00

SECTION C-8 ...................... SUBTOTAL $0.00

Section C-9: Beach Water Testing and Septic Tank Pumping
Item #Maximum QuantityUnitAmount
0046Beach Water Testing50EA$0.00
0047Septic Tank Pumping40,000GL$0.00

SECTION C-9 ....................... SUBTOTAL $0.00

Section C-10: Beach and Playground Maintenance
Item #Maximum QuantityUnitUnit PriceAmount
0048Routine Beach Maintenance72EA$0.00
0049Routine Playground Maintenance90EA$0.00
0050Annual Beach Maintenance3EA$0.00

SECTION C-10 ...................... SUBTOTAL $0.00

Section C-11: Pavement Striping and Sealing
Item #Maximum QuantityUnitUnit PriceAmount
0051Pavement Sealing25,000SY$0.00
0052Re-Striping25,000LF$0.00

SECTION C-11........................ SUBTOTAL $0.00

Section C-12: Janitorial Services - Center Hill Power Plant
Item #Maximum QuantityUnitUnit PriceAmount
0053Center Hill Power Plant12MO$0.00

SECTION C-12 ....................... SUBTOTAL $0.00

SCHEDULE SUMMARY
SUBTOTAL
SECTION C2: Grass Mowing and Maintenance of Landscaped Areas$0.00
SECTION C3: Cleaning Services of Recreational Facilities and Areas$0.00
SECTION C4: Janitorial Services$0.00
SECTION C5: Facility Repair, Maintenance and Other Non-Routine Work$0.00
SECTION C6: Cleaning Services Primitive Sites$0.00
SECTION C7: Herbicide Application$0.00
SECTION C8: Marking and Painting Boundary Line$0.00
SECTION C9: Beach Water Testing and Septic Tank Pumping$0.00
SECTION C10: Beach and Playground Maintenance$0.00
SECTION C11: Pavement Striping and Sealing$0.00
SECTION C12: Janitorial Services - Center Hill Power Plant$0.00
TOTAL BASE YEAR$0.00

Option Year 4 Option Year 4, February 1, 2030 - January 31, 2031

This is a Requirements Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment and vehicles required to perform operations and maintenance services and limited construction at Center Hill Lake in accordance with the Technical Provisions.

Section C-2: Grass Mowing and Maintenance of Landscaped Areas
Item #Maximum QuantityUnitUnit PriceAmount
0001Center Hill Dam Bottom and Downstream (Random Fill/other Areas)6EA$0.00
0002Center Hill Dam Embankment6EA$0.00
0003Floating Mill Recreation Area17EA$0.00
0004Hurricane Bridge Day Use14EA$0.00
0005Johnson's Chapel Day Use14EA$0.00
0006Long Branch Recreation Area18EA$0.00
0007Ragland Bottom Recreation Area17EA$0.00
0008Resource Manager's Office / Operations Area/ Buffalo Valley/Overlook17EA$0.00
0009Center Hill Park17EA$0.00
0010Cane Hollow14EA$0.00
SECTION C-2 ...................... SUBTOTAL$0.00
Section C-3: Cleaning Services of Recreational Facilities and Areas
Maximum QuantityUnitUnit PriceAmount
0011Campsites6,000EA$0.00
0012Dumpsters1,000EA$0.00
0013Fish Cleaning Stations375EA$0.00
0014Litter Removal2,500EA$0.00
0015Picnic Shelters1,200EA$0.00
0016Restroom Cleaning1,750EA$0.00
0017Washhouse Cleaning1,550EA$0.00

SECTION C-3 ...................... SUBTOTAL $0.00

Section C-4: Janitorial Services
Item #Maximum QuantityUnitUnit PriceAmount
0018Resource Managers Office/Visitors Center12MO$0.00
0019Maintenance Compound Service Base12MO$0.00

SECTION C-4...................... SUBTOTAL $0.00

Section C-5: Facility Repair, Maintenance and Other Non-Routine Work
Quantity
Item #Title/Description(MAX)UnitUnit PriceAmount
NOTE: Item #'s 0020 - 0042 : Bid should be based on Service Wage Rates
0020Emergency Work Surcharge40HR$0.00
0021Carpenter, Maintenance200HR$0.00
0022Electrician, Maintenance200HR$0.00
0023Laborer, Grounds Maintenance3,000HR$0.00
0024Laborer, General Maintenance1,500HR$0.00
0025Painter, Maintenance100HR$0.00
0026Plumber, Maintenance200HR$0.00
0027Backhoe/Loader (equip Case 580)**400HR$0.00
0028Chainsaw, Gas, Min. 16" bar*400HR$0.00
0029Skid Loader (Equiv CAT 259e)**400HR$0.00
0030Skid Loader w/Forestry Cutter**300HR$0.00
0031Truck, 1/2 Ton Pickup*100HR$0.00
0032Truck, Dump (14 TN)*300HR$0.00
0033Personnel Lift (Bucket Truck )*400HR$0.00
0034Man Lift 50' *200HR$0.00
0035Brush Chipper *400HR$0.00
0036Trailer, Equipment, 12 TN100HR$0.00
0037Trailer, Utility 16'-20'100HR$0.00
0038Tractor (equiv 4,000 Ford) **100HR$0.00
0039Tractor, 4x4, w Side Arm Attachment**200HR$0.00
0040Dozer (equiv Caterpillar D-6)**100HR$0.00
0041Trencher w/(Eq Ditchwitch 3700)**100HR$0.00
0042Trencher w/ Rock Saw Attachment**60HR$0.00
* Operator with Equipment*
** Operator/Trailer with Equipment**

SECTION C-5 ........................ SUBTOTAL $0.00

Section C-6: Cleaning Services Primitive Sites
Item #Maximum QuantityUnitUnit PriceAmount
0043Primitive Camping / Remote Access Area Cleaning240EA$0.00

SECTION C-6 ........................ SUBTOTAL $0.00

Section C-7: Herbicide Application
Item #Maximum QuantityUnitUnit PriceAmount
0044Herbicide (Hyvar, Banvel or equiv)45AC$0.00

SECTION C-7 ....................... SUBTOTAL $0.00

Section C-8: Marking and Painting Boundary Line
Item #Maximum QuantityUnitUnit PriceAmount
0045Mark and Paint Boundary Line60MI$0.00

SECTION C-8 ...................... SUBTOTAL $0.00

Section C-9: Beach Water Testing and Septic Tank Pumping
Item #Maximum QuantityUnitAmount
0046Beach Water Testing50EA$0.00
0047Septic Tank Pumping40,000GL$0.00

SECTION C-9 ....................... SUBTOTAL $0.00

Section C-10: Beach and Playground Maintenance
Item #Maximum QuantityUnitUnit PriceAmount
0048Routine Beach Maintenance72EA$0.00
0049Routine Playground Maintenance90EA$0.00
0050Annual Beach Maintenance3EA$0.00

SECTION C-10 ...................... SUBTOTAL $0.00

Section C-11: Pavement Striping and Sealing
Item #Maximum QuantityUnitUnit PriceAmount
0051Pavement Sealing25,000SY$0.00
0052Re-Striping25,000LF$0.00

SECTION C-11........................ SUBTOTAL $0.00

Section C-12: Janitorial Services - Center Hill Power Plant
Item #Maximum QuantityUnitUnit PriceAmount
0053Center Hill Power Plant12MO$0.00

SECTION C-12 ....................... SUBTOTAL $0.00

SCHEDULE SUMMARY
SUBTOTAL
SECTION C2: Grass Mowing and Maintenance of Landscaped Areas$0.00
SECTION C3: Cleaning Services of Recreational Facilities and Areas$0.00
SECTION C4: Janitorial Services$0.00
SECTION C5: Facility Repair, Maintenance and Other Non-Routine Work$0.00
SECTION C6: Cleaning Services Primitive Sites$0.00
SECTION C7: Herbicide Application$0.00
SECTION C8: Marking and Painting Boundary Line$0.00
SECTION C9: Beach Water Testing and Septic Tank Pumping$0.00
SECTION C10: Beach and Playground Maintenance$0.00
SECTION C11: Pavement Striping and Sealing$0.00
SECTION C12: Janitorial Services - Center Hill Power Plant$0.00
TOTAL BASE YEAR$0.00