Price Schedule Center Hill OandM Services 2026 2031 Rev2.xlsx
XLSX spreadsheet 56 KB Posted
- Solicitation number
- W912P526RA005
About this file
This is a Price Schedule Excel file for the Center Hill Lake Operations and Maintenance (O&M) Requirements Contract from February 2026 to January 2031. The contract is a 100% small business set-aside for the U.S. Army Corps of Engineers Nashville District, covering comprehensive maintenance services at Center Hill Lake in Tennessee. The contract includes a base year and four one-year option periods, with requirements spanning multiple service categories such as grass mowing, cleaning services, janitorial services, facility repairs, equipment operation, beach maintenance, herbicide application, and various site-specific maintenance tasks across locations like Center Hill Dam, recreation areas, and power plant facilities.
The pricing schedule is structured across 12 sections with zero-dollar placeholder pricing, covering activities like grass mowing at multiple sites, cleaning recreational facilities, janitorial services, facility repairs, primitive site cleaning, herbicide application, boundary line marking, beach water testing, septic tank pumping, beach and playground maintenance, pavement striping, and power plant janitorial services. The contract is a firm-fixed price requirements contract anticipated to be awarded electronically through the Army's PIEE system, with vendors required to be registered in the System for Award Management (SAM). The contract encompasses areas in DeKalb, Putnam, White, and Warren Counties of Tennessee, near cities like Smithville, Cookeville, and Sparta.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Contract Year Base Year, February 1, 2026 - January 31, 2027
This is a Requirements Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment and vehicles required to perform operations and maintenance services and limited construction at Center Hill Lake in accordance with the Technical Provisions.
| Section C-2: Grass Mowing and Maintenance of Landscaped Areas | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0001 | Center Hill Dam Bottom and Downstream (Random Fill/other Areas) | 6 | EA | $0.00 | |
| 0002 | Center Hill Dam Embankment | 6 | EA | $0.00 | |
| 0003 | Floating Mill Recreation Area | 17 | EA | $0.00 | |
| 0004 | Hurricane Bridge Day Use | 14 | EA | $0.00 | |
| 0005 | Johnson's Chapel Day Use | 14 | EA | $0.00 | |
| 0006 | Long Branch Recreation Area | 18 | EA | $0.00 | |
| 0007 | Ragland Bottom Recreation Area | 17 | EA | $0.00 | |
| 0008 | Resource Manager's Office / Operations Area/ Buffalo Valley/Overlook | 17 | EA | $0.00 | |
| 0009 | Center Hill Park | 17 | EA | $0.00 | |
| 0010 | Cane Hollow | 14 | EA | $0.00 | |
| SECTION C-2 ...................... SUBTOTAL | $0.00 |
| Section C-3: Cleaning Services of Recreational Facilities and Areas | |||||
| Maximum Quantity | Unit | Unit Price | Amount | ||
| 0011 | Campsites | 6,000 | EA | $0.00 | |
| 0012 | Dumpsters | 1,000 | EA | $0.00 | |
| 0013 | Fish Cleaning Stations | 375 | EA | $0.00 | |
| 0014 | Litter Removal | 2,500 | EA | $0.00 | |
| 0015 | Picnic Shelters | 1,200 | EA | $0.00 | |
| 0016 | Restroom Cleaning | 1,750 | EA | $0.00 | |
| 0017 | Washhouse Cleaning | 1,550 | EA | $0.00 |
SECTION C-3 ...................... SUBTOTAL $0.00
| Section C-4: Janitorial Services | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0018 | Resource Managers Office/Visitors Center | 12 | MO | $0.00 | |
| 0019 | Maintenance Compound Service Base | 12 | MO | $0.00 |
SECTION C-4...................... SUBTOTAL $0.00
| Section C-5: Facility Repair, Maintenance and Other Non-Routine Work | ||||||
| Quantity | ||||||
| Item # | Title/Description | (MAX) | Unit | Unit Price | Amount | |
| NOTE: Item #'s 0020 - 0042 : Bid should be based on Service Wage Rates | ||||||
| 0020 | Emergency Work Surcharge | 40 | HR | $0.00 | ||
| 0021 | Carpenter, Maintenance | 200 | HR | $0.00 | ||
| 0022 | Electrician, Maintenance | 200 | HR | $0.00 | ||
| 0023 | Laborer, Grounds Maintenance | 3,000 | HR | $0.00 | ||
| 0024 | Laborer, General Maintenance | 1,500 | HR | $0.00 | ||
| 0025 | Painter, Maintenance | 100 | HR | $0.00 | ||
| 0026 | Plumber, Maintenance | 200 | HR | $0.00 | ||
| 0027 | Backhoe/Loader (equip Case 580)** | 400 | HR | $0.00 | ||
| 0028 | Chainsaw, Gas, Min. 16" bar* | 400 | HR | $0.00 | ||
| 0029 | Skid Loader (Equiv CAT 259e)** | 400 | HR | $0.00 | ||
| 0030 | Skid Loader w/Forestry Cutter** | 300 | HR | $0.00 | ||
| 0031 | Truck, 1/2 Ton Pickup* | 100 | HR | $0.00 | ||
| 0032 | Truck, Dump (14 TN)* | 300 | HR | $0.00 | ||
| 0033 | Personnel Lift (Bucket Truck )* | 400 | HR | $0.00 | ||
| 0034 | Man Lift 50' * | 200 | HR | $0.00 | ||
| 0035 | Brush Chipper * | 400 | HR | $0.00 | ||
| 0036 | Trailer, Equipment, 12 TN | 100 | HR | $0.00 | ||
| 0037 | Trailer, Utility 16'-20' | 100 | HR | $0.00 | ||
| 0038 | Tractor (equiv 4,000 Ford) ** | 100 | HR | $0.00 | ||
| 0039 | Tractor, 4x4, w Side Arm Attachment** | 200 | HR | $0.00 | ||
| 0040 | Dozer (equiv Caterpillar D-6)** | 100 | HR | $0.00 | ||
| 0041 | Trencher w/(Eq Ditchwitch 3700)** | 100 | HR | $0.00 | ||
| 0042 | Trencher w/ Rock Saw Attachment** | 60 | HR | $0.00 | ||
| * Operator with Equipment* | ||||||
| ** Operator/Trailer with Equipment** |
SECTION C-5 ........................ SUBTOTAL $0.00
| Section C-6: Cleaning Services Primitive Sites | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0043 | Primitive Camping / Remote Access Area Cleaning | 240 | EA | $0.00 |
SECTION C-6 ........................ SUBTOTAL $0.00
| Section C-7: Herbicide Application | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0044 | Herbicide (Hyvar, Banvel or equiv) | 45 | AC | $0.00 |
SECTION C-7 ....................... SUBTOTAL $0.00
| Section C-8: Marking and Painting Boundary Line | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0045 | Mark and Paint Boundary Line | 60 | MI | $0.00 |
SECTION C-8 ...................... SUBTOTAL $0.00
| Section C-9: Beach Water Testing and Septic Tank Pumping | ||||
| Item # | Maximum Quantity | Unit | Amount | |
| 0046 | Beach Water Testing | 50 | EA | $0.00 |
| 0047 | Septic Tank Pumping | 40,000 | GL | $0.00 |
SECTION C-9 ....................... SUBTOTAL $0.00
| Section C-10: Beach and Playground Maintenance | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0048 | Routine Beach Maintenance | 72 | EA | $0.00 | |
| 0049 | Routine Playground Maintenance | 90 | EA | $0.00 | |
| 0050 | Annual Beach Maintenance | 3 | EA | $0.00 |
SECTION C-10 ...................... SUBTOTAL $0.00
| Section C-11: Pavement Striping and Sealing | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0051 | Pavement Sealing | 25,000 | SY | $0.00 | |
| 0052 | Re-Striping | 25,000 | LF | $0.00 |
SECTION C-11........................ SUBTOTAL $0.00
| Section C-12: Janitorial Services - Center Hill Power Plant | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0053 | Center Hill Power Plant | 12 | MO | $0.00 |
SECTION C-12 ....................... SUBTOTAL $0.00
| SCHEDULE SUMMARY | |
| SUBTOTAL | |
| SECTION C2: Grass Mowing and Maintenance of Landscaped Areas | $0.00 |
| SECTION C3: Cleaning Services of Recreational Facilities and Areas | $0.00 |
| SECTION C4: Janitorial Services | $0.00 |
| SECTION C5: Facility Repair, Maintenance and Other Non-Routine Work | $0.00 |
| SECTION C6: Cleaning Services Primitive Sites | $0.00 |
| SECTION C7: Herbicide Application | $0.00 |
| SECTION C8: Marking and Painting Boundary Line | $0.00 |
| SECTION C9: Beach Water Testing and Septic Tank Pumping | $0.00 |
| SECTION C10: Beach and Playground Maintenance | $0.00 |
| SECTION C11: Pavement Striping and Sealing | $0.00 |
| SECTION C12: Janitorial Services - Center Hill Power Plant | $0.00 |
| TOTAL BASE YEAR | $0.00 |
Option Year 1 Option Year 1, February 1, 2027 - January 31, 2028
This is a Requirements Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment and vehicles required to perform operations and maintenance services and limited construction at Center Hill Lake in accordance with the Technical Provisions.
| Section C-2: Grass Mowing and Maintenance of Landscaped Areas | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0001 | Center Hill Dam Bottom and Downstream (Random Fill/other Areas) | 6 | EA | $0.00 | |
| 0002 | Center Hill Dam Embankment | 6 | EA | $0.00 | |
| 0003 | Floating Mill Recreation Area | 17 | EA | $0.00 | |
| 0004 | Hurricane Bridge Day Use | 14 | EA | $0.00 | |
| 0005 | Johnson's Chapel Day Use | 14 | EA | $0.00 | |
| 0006 | Long Branch Recreation Area | 18 | EA | $0.00 | |
| 0007 | Ragland Bottom Recreation Area | 17 | EA | $0.00 | |
| 0008 | Resource Manager's Office / Operations Area/ Buffalo Valley/Overlook | 17 | EA | $0.00 | |
| 0009 | Center Hill Park | 17 | EA | $0.00 | |
| 0010 | Cane Hollow | 14 | EA | $0.00 | |
| SECTION C-2 ...................... SUBTOTAL | $0.00 |
| Section C-3: Cleaning Services of Recreational Facilities and Areas | |||||
| Maximum Quantity | Unit | Unit Price | Amount | ||
| 0011 | Campsites | 6,000 | EA | $0.00 | |
| 0012 | Dumpsters | 1,000 | EA | $0.00 | |
| 0013 | Fish Cleaning Stations | 375 | EA | $0.00 | |
| 0014 | Litter Removal | 2,500 | EA | $0.00 | |
| 0015 | Picnic Shelters | 1,200 | EA | $0.00 | |
| 0016 | Restroom Cleaning | 1,750 | EA | $0.00 | |
| 0017 | Washhouse Cleaning | 1,550 | EA | $0.00 |
SECTION C-3 ...................... SUBTOTAL $0.00
| Section C-4: Janitorial Services | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0018 | Resource Managers Office/Visitors Center | 12 | MO | $0.00 | |
| 0019 | Maintenance Compound Service Base | 12 | MO | $0.00 |
SECTION C-4...................... SUBTOTAL $0.00
| Section C-5: Facility Repair, Maintenance and Other Non-Routine Work | ||||||
| Quantity | ||||||
| Item # | Title/Description | (MAX) | Unit | Unit Price | Amount | |
| NOTE: Item #'s 0020 - 0042 : Bid should be based on Service Wage Rates | ||||||
| 0020 | Emergency Work Surcharge | 40 | HR | $0.00 | ||
| 0021 | Carpenter, Maintenance | 200 | HR | $0.00 | ||
| 0022 | Electrician, Maintenance | 200 | HR | $0.00 | ||
| 0023 | Laborer, Grounds Maintenance | 3,000 | HR | $0.00 | ||
| 0024 | Laborer, General Maintenance | 1,500 | HR | $0.00 | ||
| 0025 | Painter, Maintenance | 100 | HR | $0.00 | ||
| 0026 | Plumber, Maintenance | 200 | HR | $0.00 | ||
| 0027 | Backhoe/Loader (equip Case 580)** | 400 | HR | $0.00 | ||
| 0028 | Chainsaw, Gas, Min. 16" bar* | 400 | HR | $0.00 | ||
| 0029 | Skid Loader (Equiv CAT 259e)** | 400 | HR | $0.00 | ||
| 0030 | Skid Loader w/Forestry Cutter** | 300 | HR | $0.00 | ||
| 0031 | Truck, 1/2 Ton Pickup* | 100 | HR | $0.00 | ||
| 0032 | Truck, Dump (14 TN)* | 300 | HR | $0.00 | ||
| 0033 | Personnel Lift (Bucket Truck )* | 400 | HR | $0.00 | ||
| 0034 | Man Lift 50' * | 200 | HR | $0.00 | ||
| 0035 | Brush Chipper * | 400 | HR | $0.00 | ||
| 0036 | Trailer, Equipment, 12 TN | 100 | HR | $0.00 | ||
| 0037 | Trailer, Utility 16'-20' | 100 | HR | $0.00 | ||
| 0038 | Tractor (equiv 4,000 Ford) ** | 100 | HR | $0.00 | ||
| 0039 | Tractor, 4x4, w Side Arm Attachment** | 200 | HR | $0.00 | ||
| 0040 | Dozer (equiv Caterpillar D-6)** | 100 | HR | $0.00 | ||
| 0041 | Trencher w/(Eq Ditchwitch 3700)** | 100 | HR | $0.00 | ||
| 0042 | Trencher w/ Rock Saw Attachment** | 60 | HR | $0.00 | ||
| * Operator with Equipment* | ||||||
| ** Operator/Trailer with Equipment** |
SECTION C-5 ........................ SUBTOTAL $0.00
| Section C-6: Cleaning Services Primitive Sites | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0043 | Primitive Camping / Remote Access Area Cleaning | 240 | EA | $0.00 |
SECTION C-6 ........................ SUBTOTAL $0.00
| Section C-7: Herbicide Application | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0044 | Herbicide (Hyvar, Banvel or equiv) | 45 | AC | $0.00 |
SECTION C-7 ....................... SUBTOTAL $0.00
| Section C-8: Marking and Painting Boundary Line | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0045 | Mark and Paint Boundary Line | 60 | MI | $0.00 |
SECTION C-8 ...................... SUBTOTAL $0.00
| Section C-9: Beach Water Testing and Septic Tank Pumping | ||||
| Item # | Maximum Quantity | Unit | Amount | |
| 0046 | Beach Water Testing | 50 | EA | $0.00 |
| 0047 | Septic Tank Pumping | 40,000 | GL | $0.00 |
SECTION C-9 ....................... SUBTOTAL $0.00
| Section C-10: Beach and Playground Maintenance | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0048 | Routine Beach Maintenance | 72 | EA | $0.00 | |
| 0049 | Routine Playground Maintenance | 90 | EA | $0.00 | |
| 0050 | Annual Beach Maintenance | 3 | EA | $0.00 |
SECTION C-10 ...................... SUBTOTAL $0.00
| Section C-11: Pavement Striping and Sealing | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0051 | Pavement Sealing | 25,000 | SY | $0.00 | |
| 0052 | Re-Striping | 25,000 | LF | $0.00 |
SECTION C-11........................ SUBTOTAL $0.00
| Section C-12: Janitorial Services - Center Hill Power Plant | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0053 | Center Hill Power Plant | 12 | MO | $0.00 |
SECTION C-12 ....................... SUBTOTAL $0.00
| SCHEDULE SUMMARY | |
| SUBTOTAL | |
| SECTION C2: Grass Mowing and Maintenance of Landscaped Areas | $0.00 |
| SECTION C3: Cleaning Services of Recreational Facilities and Areas | $0.00 |
| SECTION C4: Janitorial Services | $0.00 |
| SECTION C5: Facility Repair, Maintenance and Other Non-Routine Work | $0.00 |
| SECTION C6: Cleaning Services Primitive Sites | $0.00 |
| SECTION C7: Herbicide Application | $0.00 |
| SECTION C8: Marking and Painting Boundary Line | $0.00 |
| SECTION C9: Beach Water Testing and Septic Tank Pumping | $0.00 |
| SECTION C10: Beach and Playground Maintenance | $0.00 |
| SECTION C11: Pavement Striping and Sealing | $0.00 |
| SECTION C12: Janitorial Services - Center Hill Power Plant | $0.00 |
| TOTAL BASE YEAR | $0.00 |
Option Year 2 Option Year 2, February 1, 2028 - January 31, 2029
This is a Requirements Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment and vehicles required to perform operations and maintenance services and limited construction at Center Hill Lake in accordance with the Technical Provisions.
| Section C-2: Grass Mowing and Maintenance of Landscaped Areas | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0001 | Center Hill Dam Bottom and Downstream (Random Fill/other Areas) | 6 | EA | $0.00 | |
| 0002 | Center Hill Dam Embankment | 6 | EA | $0.00 | |
| 0003 | Floating Mill Recreation Area | 17 | EA | $0.00 | |
| 0004 | Hurricane Bridge Day Use | 14 | EA | $0.00 | |
| 0005 | Johnson's Chapel Day Use | 14 | EA | $0.00 | |
| 0006 | Long Branch Recreation Area | 18 | EA | $0.00 | |
| 0007 | Ragland Bottom Recreation Area | 17 | EA | $0.00 | |
| 0008 | Resource Manager's Office / Operations Area/ Buffalo Valley/Overlook | 17 | EA | $0.00 | |
| 0009 | Center Hill Park | 17 | EA | $0.00 | |
| 0010 | Cane Hollow | 14 | EA | $0.00 | |
| SECTION C-2 ...................... SUBTOTAL | $0.00 |
| Section C-3: Cleaning Services of Recreational Facilities and Areas | |||||
| Maximum Quantity | Unit | Unit Price | Amount | ||
| 0011 | Campsites | 6,000 | EA | $0.00 | |
| 0012 | Dumpsters | 1,000 | EA | $0.00 | |
| 0013 | Fish Cleaning Stations | 375 | EA | $0.00 | |
| 0014 | Litter Removal | 2,500 | EA | $0.00 | |
| 0015 | Picnic Shelters | 1,200 | EA | $0.00 | |
| 0016 | Restroom Cleaning | 1,750 | EA | $0.00 | |
| 0017 | Washhouse Cleaning | 1,550 | EA | $0.00 |
SECTION C-3 ...................... SUBTOTAL $0.00
| Section C-4: Janitorial Services | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0018 | Resource Managers Office/Visitors Center | 12 | MO | $0.00 | |
| 0019 | Maintenance Compound Service Base | 12 | MO | $0.00 |
SECTION C-4...................... SUBTOTAL $0.00
| Section C-5: Facility Repair, Maintenance and Other Non-Routine Work | ||||||
| Quantity | ||||||
| Item # | Title/Description | (MAX) | Unit | Unit Price | Amount | |
| NOTE: Item #'s 0020 - 0042 : Bid should be based on Service Wage Rates | ||||||
| 0020 | Emergency Work Surcharge | 40 | HR | $0.00 | ||
| 0021 | Carpenter, Maintenance | 200 | HR | $0.00 | ||
| 0022 | Electrician, Maintenance | 200 | HR | $0.00 | ||
| 0023 | Laborer, Grounds Maintenance | 3,000 | HR | $0.00 | ||
| 0024 | Laborer, General Maintenance | 1,500 | HR | $0.00 | ||
| 0025 | Painter, Maintenance | 100 | HR | $0.00 | ||
| 0026 | Plumber, Maintenance | 200 | HR | $0.00 | ||
| 0027 | Backhoe/Loader (equip Case 580)** | 400 | HR | $0.00 | ||
| 0028 | Chainsaw, Gas, Min. 16" bar* | 400 | HR | $0.00 | ||
| 0029 | Skid Loader (Equiv CAT 259e)** | 400 | HR | $0.00 | ||
| 0030 | Skid Loader w/Forestry Cutter** | 300 | HR | $0.00 | ||
| 0031 | Truck, 1/2 Ton Pickup* | 100 | HR | $0.00 | ||
| 0032 | Truck, Dump (14 TN)* | 300 | HR | $0.00 | ||
| 0033 | Personnel Lift (Bucket Truck )* | 400 | HR | $0.00 | ||
| 0034 | Man Lift 50' * | 200 | HR | $0.00 | ||
| 0035 | Brush Chipper * | 400 | HR | $0.00 | ||
| 0036 | Trailer, Equipment, 12 TN | 100 | HR | $0.00 | ||
| 0037 | Trailer, Utility 16'-20' | 100 | HR | $0.00 | ||
| 0038 | Tractor (equiv 4,000 Ford) ** | 100 | HR | $0.00 | ||
| 0039 | Tractor, 4x4, w Side Arm Attachment** | 200 | HR | $0.00 | ||
| 0040 | Dozer (equiv Caterpillar D-6)** | 100 | HR | $0.00 | ||
| 0041 | Trencher w/(Eq Ditchwitch 3700)** | 100 | HR | $0.00 | ||
| 0042 | Trencher w/ Rock Saw Attachment** | 60 | HR | $0.00 | ||
| * Operator with Equipment* | ||||||
| ** Operator/Trailer with Equipment** |
SECTION C-5 ........................ SUBTOTAL $0.00
| Section C-6: Cleaning Services Primitive Sites | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0043 | Primitive Camping / Remote Access Area Cleaning | 240 | EA | $0.00 |
SECTION C-6 ........................ SUBTOTAL $0.00
| Section C-7: Herbicide Application | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0044 | Herbicide (Hyvar, Banvel or equiv) | 45 | AC | $0.00 |
SECTION C-7 ....................... SUBTOTAL $0.00
| Section C-8: Marking and Painting Boundary Line | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0045 | Mark and Paint Boundary Line | 60 | MI | $0.00 |
SECTION C-8 ...................... SUBTOTAL $0.00
| Section C-9: Beach Water Testing and Septic Tank Pumping | ||||
| Item # | Maximum Quantity | Unit | Amount | |
| 0046 | Beach Water Testing | 50 | EA | $0.00 |
| 0047 | Septic Tank Pumping | 40,000 | GL | $0.00 |
SECTION C-9 ....................... SUBTOTAL $0.00
| Section C-10: Beach and Playground Maintenance | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0048 | Routine Beach Maintenance | 72 | EA | $0.00 | |
| 0049 | Routine Playground Maintenance | 90 | EA | $0.00 | |
| 0050 | Annual Beach Maintenance | 3 | EA | $0.00 |
SECTION C-10 ...................... SUBTOTAL $0.00
| Section C-11: Pavement Striping and Sealing | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0051 | Pavement Sealing | 25,000 | SY | $0.00 | |
| 0052 | Re-Striping | 25,000 | LF | $0.00 |
SECTION C-11........................ SUBTOTAL $0.00
| Section C-12: Janitorial Services - Center Hill Power Plant | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0053 | Center Hill Power Plant | 12 | MO | $0.00 |
SECTION C-12 ....................... SUBTOTAL $0.00
| SCHEDULE SUMMARY | |
| SUBTOTAL | |
| SECTION C2: Grass Mowing and Maintenance of Landscaped Areas | $0.00 |
| SECTION C3: Cleaning Services of Recreational Facilities and Areas | $0.00 |
| SECTION C4: Janitorial Services | $0.00 |
| SECTION C5: Facility Repair, Maintenance and Other Non-Routine Work | $0.00 |
| SECTION C6: Cleaning Services Primitive Sites | $0.00 |
| SECTION C7: Herbicide Application | $0.00 |
| SECTION C8: Marking and Painting Boundary Line | $0.00 |
| SECTION C9: Beach Water Testing and Septic Tank Pumping | $0.00 |
| SECTION C10: Beach and Playground Maintenance | $0.00 |
| SECTION C11: Pavement Striping and Sealing | $0.00 |
| SECTION C12: Janitorial Services - Center Hill Power Plant | $0.00 |
| TOTAL BASE YEAR | $0.00 |
Option Year 3 Option Year 3, February 1, 2029 - January 31, 2030
This is a Requirements Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment and vehicles required to perform operations and maintenance services and limited construction at Center Hill Lake in accordance with the Technical Provisions.
| Section C-2: Grass Mowing and Maintenance of Landscaped Areas | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0001 | Center Hill Dam Bottom and Downstream (Random Fill/other Areas) | 6 | EA | $0.00 | |
| 0002 | Center Hill Dam Embankment | 6 | EA | $0.00 | |
| 0003 | Floating Mill Recreation Area | 17 | EA | $0.00 | |
| 0004 | Hurricane Bridge Day Use | 14 | EA | $0.00 | |
| 0005 | Johnson's Chapel Day Use | 14 | EA | $0.00 | |
| 0006 | Long Branch Recreation Area | 18 | EA | $0.00 | |
| 0007 | Ragland Bottom Recreation Area | 17 | EA | $0.00 | |
| 0008 | Resource Manager's Office / Operations Area/ Buffalo Valley/Overlook | 17 | EA | $0.00 | |
| 0009 | Center Hill Park | 17 | EA | $0.00 | |
| 0010 | Cane Hollow | 14 | EA | $0.00 | |
| SECTION C-2 ...................... SUBTOTAL | $0.00 |
| Section C-3: Cleaning Services of Recreational Facilities and Areas | |||||
| Maximum Quantity | Unit | Unit Price | Amount | ||
| 0011 | Campsites | 6,000 | EA | $0.00 | |
| 0012 | Dumpsters | 1,000 | EA | $0.00 | |
| 0013 | Fish Cleaning Stations | 375 | EA | $0.00 | |
| 0014 | Litter Removal | 2,500 | EA | $0.00 | |
| 0015 | Picnic Shelters | 1,200 | EA | $0.00 | |
| 0016 | Restroom Cleaning | 1,750 | EA | $0.00 | |
| 0017 | Washhouse Cleaning | 1,550 | EA | $0.00 |
SECTION C-3 ...................... SUBTOTAL $0.00
| Section C-4: Janitorial Services | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0018 | Resource Managers Office/Visitors Center | 12 | MO | $0.00 | |
| 0019 | Maintenance Compound Service Base | 12 | MO | $0.00 |
SECTION C-4...................... SUBTOTAL $0.00
| Section C-5: Facility Repair, Maintenance and Other Non-Routine Work | ||||||
| Quantity | ||||||
| Item # | Title/Description | (MAX) | Unit | Unit Price | Amount | |
| NOTE: Item #'s 0020 - 0042 : Bid should be based on Service Wage Rates | ||||||
| 0020 | Emergency Work Surcharge | 40 | HR | $0.00 | ||
| 0021 | Carpenter, Maintenance | 200 | HR | $0.00 | ||
| 0022 | Electrician, Maintenance | 200 | HR | $0.00 | ||
| 0023 | Laborer, Grounds Maintenance | 3,000 | HR | $0.00 | ||
| 0024 | Laborer, General Maintenance | 1,500 | HR | $0.00 | ||
| 0025 | Painter, Maintenance | 100 | HR | $0.00 | ||
| 0026 | Plumber, Maintenance | 200 | HR | $0.00 | ||
| 0027 | Backhoe/Loader (equip Case 580)** | 400 | HR | $0.00 | ||
| 0028 | Chainsaw, Gas, Min. 16" bar* | 400 | HR | $0.00 | ||
| 0029 | Skid Loader (Equiv CAT 259e)** | 400 | HR | $0.00 | ||
| 0030 | Skid Loader w/Forestry Cutter** | 300 | HR | $0.00 | ||
| 0031 | Truck, 1/2 Ton Pickup* | 100 | HR | $0.00 | ||
| 0032 | Truck, Dump (14 TN)* | 300 | HR | $0.00 | ||
| 0033 | Personnel Lift (Bucket Truck )* | 400 | HR | $0.00 | ||
| 0034 | Man Lift 50' * | 200 | HR | $0.00 | ||
| 0035 | Brush Chipper * | 400 | HR | $0.00 | ||
| 0036 | Trailer, Equipment, 12 TN | 100 | HR | $0.00 | ||
| 0037 | Trailer, Utility 16'-20' | 100 | HR | $0.00 | ||
| 0038 | Tractor (equiv 4,000 Ford) ** | 100 | HR | $0.00 | ||
| 0039 | Tractor, 4x4, w Side Arm Attachment** | 200 | HR | $0.00 | ||
| 0040 | Dozer (equiv Caterpillar D-6)** | 100 | HR | $0.00 | ||
| 0041 | Trencher w/(Eq Ditchwitch 3700)** | 100 | HR | $0.00 | ||
| 0042 | Trencher w/ Rock Saw Attachment** | 60 | HR | $0.00 | ||
| * Operator with Equipment* | ||||||
| ** Operator/Trailer with Equipment** |
SECTION C-5 ........................ SUBTOTAL $0.00
| Section C-6: Cleaning Services Primitive Sites | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0043 | Primitive Camping / Remote Access Area Cleaning | 240 | EA | $0.00 |
SECTION C-6 ........................ SUBTOTAL $0.00
| Section C-7: Herbicide Application | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0044 | Herbicide (Hyvar, Banvel or equiv) | 45 | AC | $0.00 |
SECTION C-7 ....................... SUBTOTAL $0.00
| Section C-8: Marking and Painting Boundary Line | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0045 | Mark and Paint Boundary Line | 60 | MI | $0.00 |
SECTION C-8 ...................... SUBTOTAL $0.00
| Section C-9: Beach Water Testing and Septic Tank Pumping | ||||
| Item # | Maximum Quantity | Unit | Amount | |
| 0046 | Beach Water Testing | 50 | EA | $0.00 |
| 0047 | Septic Tank Pumping | 40,000 | GL | $0.00 |
SECTION C-9 ....................... SUBTOTAL $0.00
| Section C-10: Beach and Playground Maintenance | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0048 | Routine Beach Maintenance | 72 | EA | $0.00 | |
| 0049 | Routine Playground Maintenance | 90 | EA | $0.00 | |
| 0050 | Annual Beach Maintenance | 3 | EA | $0.00 |
SECTION C-10 ...................... SUBTOTAL $0.00
| Section C-11: Pavement Striping and Sealing | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0051 | Pavement Sealing | 25,000 | SY | $0.00 | |
| 0052 | Re-Striping | 25,000 | LF | $0.00 |
SECTION C-11........................ SUBTOTAL $0.00
| Section C-12: Janitorial Services - Center Hill Power Plant | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0053 | Center Hill Power Plant | 12 | MO | $0.00 |
SECTION C-12 ....................... SUBTOTAL $0.00
| SCHEDULE SUMMARY | |
| SUBTOTAL | |
| SECTION C2: Grass Mowing and Maintenance of Landscaped Areas | $0.00 |
| SECTION C3: Cleaning Services of Recreational Facilities and Areas | $0.00 |
| SECTION C4: Janitorial Services | $0.00 |
| SECTION C5: Facility Repair, Maintenance and Other Non-Routine Work | $0.00 |
| SECTION C6: Cleaning Services Primitive Sites | $0.00 |
| SECTION C7: Herbicide Application | $0.00 |
| SECTION C8: Marking and Painting Boundary Line | $0.00 |
| SECTION C9: Beach Water Testing and Septic Tank Pumping | $0.00 |
| SECTION C10: Beach and Playground Maintenance | $0.00 |
| SECTION C11: Pavement Striping and Sealing | $0.00 |
| SECTION C12: Janitorial Services - Center Hill Power Plant | $0.00 |
| TOTAL BASE YEAR | $0.00 |
Option Year 4 Option Year 4, February 1, 2030 - January 31, 2031
This is a Requirements Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment and vehicles required to perform operations and maintenance services and limited construction at Center Hill Lake in accordance with the Technical Provisions.
| Section C-2: Grass Mowing and Maintenance of Landscaped Areas | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0001 | Center Hill Dam Bottom and Downstream (Random Fill/other Areas) | 6 | EA | $0.00 | |
| 0002 | Center Hill Dam Embankment | 6 | EA | $0.00 | |
| 0003 | Floating Mill Recreation Area | 17 | EA | $0.00 | |
| 0004 | Hurricane Bridge Day Use | 14 | EA | $0.00 | |
| 0005 | Johnson's Chapel Day Use | 14 | EA | $0.00 | |
| 0006 | Long Branch Recreation Area | 18 | EA | $0.00 | |
| 0007 | Ragland Bottom Recreation Area | 17 | EA | $0.00 | |
| 0008 | Resource Manager's Office / Operations Area/ Buffalo Valley/Overlook | 17 | EA | $0.00 | |
| 0009 | Center Hill Park | 17 | EA | $0.00 | |
| 0010 | Cane Hollow | 14 | EA | $0.00 | |
| SECTION C-2 ...................... SUBTOTAL | $0.00 |
| Section C-3: Cleaning Services of Recreational Facilities and Areas | |||||
| Maximum Quantity | Unit | Unit Price | Amount | ||
| 0011 | Campsites | 6,000 | EA | $0.00 | |
| 0012 | Dumpsters | 1,000 | EA | $0.00 | |
| 0013 | Fish Cleaning Stations | 375 | EA | $0.00 | |
| 0014 | Litter Removal | 2,500 | EA | $0.00 | |
| 0015 | Picnic Shelters | 1,200 | EA | $0.00 | |
| 0016 | Restroom Cleaning | 1,750 | EA | $0.00 | |
| 0017 | Washhouse Cleaning | 1,550 | EA | $0.00 |
SECTION C-3 ...................... SUBTOTAL $0.00
| Section C-4: Janitorial Services | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0018 | Resource Managers Office/Visitors Center | 12 | MO | $0.00 | |
| 0019 | Maintenance Compound Service Base | 12 | MO | $0.00 |
SECTION C-4...................... SUBTOTAL $0.00
| Section C-5: Facility Repair, Maintenance and Other Non-Routine Work | ||||||
| Quantity | ||||||
| Item # | Title/Description | (MAX) | Unit | Unit Price | Amount | |
| NOTE: Item #'s 0020 - 0042 : Bid should be based on Service Wage Rates | ||||||
| 0020 | Emergency Work Surcharge | 40 | HR | $0.00 | ||
| 0021 | Carpenter, Maintenance | 200 | HR | $0.00 | ||
| 0022 | Electrician, Maintenance | 200 | HR | $0.00 | ||
| 0023 | Laborer, Grounds Maintenance | 3,000 | HR | $0.00 | ||
| 0024 | Laborer, General Maintenance | 1,500 | HR | $0.00 | ||
| 0025 | Painter, Maintenance | 100 | HR | $0.00 | ||
| 0026 | Plumber, Maintenance | 200 | HR | $0.00 | ||
| 0027 | Backhoe/Loader (equip Case 580)** | 400 | HR | $0.00 | ||
| 0028 | Chainsaw, Gas, Min. 16" bar* | 400 | HR | $0.00 | ||
| 0029 | Skid Loader (Equiv CAT 259e)** | 400 | HR | $0.00 | ||
| 0030 | Skid Loader w/Forestry Cutter** | 300 | HR | $0.00 | ||
| 0031 | Truck, 1/2 Ton Pickup* | 100 | HR | $0.00 | ||
| 0032 | Truck, Dump (14 TN)* | 300 | HR | $0.00 | ||
| 0033 | Personnel Lift (Bucket Truck )* | 400 | HR | $0.00 | ||
| 0034 | Man Lift 50' * | 200 | HR | $0.00 | ||
| 0035 | Brush Chipper * | 400 | HR | $0.00 | ||
| 0036 | Trailer, Equipment, 12 TN | 100 | HR | $0.00 | ||
| 0037 | Trailer, Utility 16'-20' | 100 | HR | $0.00 | ||
| 0038 | Tractor (equiv 4,000 Ford) ** | 100 | HR | $0.00 | ||
| 0039 | Tractor, 4x4, w Side Arm Attachment** | 200 | HR | $0.00 | ||
| 0040 | Dozer (equiv Caterpillar D-6)** | 100 | HR | $0.00 | ||
| 0041 | Trencher w/(Eq Ditchwitch 3700)** | 100 | HR | $0.00 | ||
| 0042 | Trencher w/ Rock Saw Attachment** | 60 | HR | $0.00 | ||
| * Operator with Equipment* | ||||||
| ** Operator/Trailer with Equipment** |
SECTION C-5 ........................ SUBTOTAL $0.00
| Section C-6: Cleaning Services Primitive Sites | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0043 | Primitive Camping / Remote Access Area Cleaning | 240 | EA | $0.00 |
SECTION C-6 ........................ SUBTOTAL $0.00
| Section C-7: Herbicide Application | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0044 | Herbicide (Hyvar, Banvel or equiv) | 45 | AC | $0.00 |
SECTION C-7 ....................... SUBTOTAL $0.00
| Section C-8: Marking and Painting Boundary Line | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0045 | Mark and Paint Boundary Line | 60 | MI | $0.00 |
SECTION C-8 ...................... SUBTOTAL $0.00
| Section C-9: Beach Water Testing and Septic Tank Pumping | ||||
| Item # | Maximum Quantity | Unit | Amount | |
| 0046 | Beach Water Testing | 50 | EA | $0.00 |
| 0047 | Septic Tank Pumping | 40,000 | GL | $0.00 |
SECTION C-9 ....................... SUBTOTAL $0.00
| Section C-10: Beach and Playground Maintenance | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0048 | Routine Beach Maintenance | 72 | EA | $0.00 | |
| 0049 | Routine Playground Maintenance | 90 | EA | $0.00 | |
| 0050 | Annual Beach Maintenance | 3 | EA | $0.00 |
SECTION C-10 ...................... SUBTOTAL $0.00
| Section C-11: Pavement Striping and Sealing | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0051 | Pavement Sealing | 25,000 | SY | $0.00 | |
| 0052 | Re-Striping | 25,000 | LF | $0.00 |
SECTION C-11........................ SUBTOTAL $0.00
| Section C-12: Janitorial Services - Center Hill Power Plant | |||||
| Item # | Maximum Quantity | Unit | Unit Price | Amount | |
| 0053 | Center Hill Power Plant | 12 | MO | $0.00 |
SECTION C-12 ....................... SUBTOTAL $0.00
| SCHEDULE SUMMARY | |
| SUBTOTAL | |
| SECTION C2: Grass Mowing and Maintenance of Landscaped Areas | $0.00 |
| SECTION C3: Cleaning Services of Recreational Facilities and Areas | $0.00 |
| SECTION C4: Janitorial Services | $0.00 |
| SECTION C5: Facility Repair, Maintenance and Other Non-Routine Work | $0.00 |
| SECTION C6: Cleaning Services Primitive Sites | $0.00 |
| SECTION C7: Herbicide Application | $0.00 |
| SECTION C8: Marking and Painting Boundary Line | $0.00 |
| SECTION C9: Beach Water Testing and Septic Tank Pumping | $0.00 |
| SECTION C10: Beach and Playground Maintenance | $0.00 |
| SECTION C11: Pavement Striping and Sealing | $0.00 |
| SECTION C12: Janitorial Services - Center Hill Power Plant | $0.00 |
| TOTAL BASE YEAR | $0.00 |