Price Proposal Form.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Hydraulic Hardline Piping
Solicitation number
N0016726Q1089
Issued by

About this file

This is a Price Proposal Form template in Excel format for the Hydraulic Hardline Piping solicitation issued by Naval Surface Warfare Center Carderock Division (NSWCCD), Department of the Navy Naval Sea Systems Command. The form is designed to capture pricing information from contractors responding to solicitation number N0016726Q1089 for the provision and installation of non-welded steel piping systems in multiple laboratories at Buildings 19 and 60 in West Bethesda, Maryland.

The contract opportunity is structured as a one-year base period with options and requires contractors to supply and install hydraulic hardline piping that will connect existing and planned MTS hydraulic power units (HPUs) to MTS and NSWCCD-developed hydraulic testing systems. The pricing template serves as the mechanism for offerors to submit their cost proposals for materials, labor, installation services, and any other associated expenses related to this hydraulic piping work. As a template document, it does not contain specific pricing terms, response deadlines, or award information, but rather provides the standardized format that contractors must use when submitting their financial proposals for evaluation by NSWCCD.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

DATE:

CONTRACT TITLE: Contract No:

Modification - add mini-split HVAC, room 120HA

PRIME CONTRACTOR'S WORKRevisions/Comments
1.Direct MaterialsERROR:#REF!
2.Sales Tax on Materials6.00%of line 1ERROR:#REF!
3.Direct Labor
4.Insurance, Taxes, and Fringe Benefits20.00%of line 3$0.00
5.Rental EquipmentERROR:#REF!
6.Sales Tax on Rental Equipment6.00%of line 5ERROR:#REF!
7.Equipment Ownership and Operating Expenses
8.SubtotalERROR:#REF!
9.Prime's Field Overhead8.00%of line 80.0%ERROR:#REF!
10.SUBTOTALERROR:#REF!
SUBCONTRACTOR A WORK
11.Direct MaterialsERROR:#REF!
12.Sales Tax on Materials6.00%of line 11ERROR:#REF!
13.Direct Labor
14.Insurance, Taxes, and Fringe Benefits20.00%of line 13$0.00
15.Rental Equipment$0.00
16.Sales Tax on Rental Equipment6.00%of line 15$0.00
17.Equip. Ownership and Operating Expenses
18.SUBTOTALERROR:#REF!
19.Field Overhead8.00%of line 18ERROR:#REF!
20.SUBTOTALERROR:#REF!
21.Home Office Overhead5.00%of line 20ERROR:#REF!
22.Profit10.00%of line 20ERROR:#REF!
23.SUBTOTAL (Add Lines 20-22)ERROR:#REF!
SUBCONTRACTOR B WORK
24.Direct Materials
25.Sales Tax on Materials6.00%of line 24$0.00
26.Direct Labor
27.Insurance, Taxes, and Fringe Benefits20.00%of line 26$0.00
28.Rental Equipment$0.00
29.Sales Tax on Rental Equipment6.00%of line 28$0.00
30.Equip. Ownership and Operating Expenses
31.SUBTOTAL$0.00
32.Field Overhead8.00%of line 31$0.00
33.SUBTOTAL$0.00
34.Home Office Overhead5.00%of line 33$0.00
35.Profit10.00%of line 33$0.00
36.SUBTOTAL (Add Lines 33 - 35)$0.00
SUMMARY
37.Prime Contractor's Work (from line 10)ERROR:#REF!
38.Sub-contractor A Work (from line 23)ERROR:#REF!
39.Sub-contractor B Work (from line 36)$0.00
40.SUBTOTAL (add lines 37-39)ERROR:#REF!
41.Prime's Field Office Overhead on sub.0.00%of line 400.00%ERROR:#REF!
42.Prime's Home Office Overhead10.00%of line 40ERROR:#REF!
43.Prime's Profit10.00%of line 40ERROR:#REF!
44.SUBTOTAL (add lines 97-99)ERROR:#REF!
45.Prime Contractor's Bond Premium2.00%of line 44ERROR:#REF!
46.TOTAL COST (Add Lines 44 and 45)ERROR:#REF!
TOTALERROR:#REF!
Prime Contractor name:
Subcontractor A name:
Subcontractor B name:
Signature & Title of preparer:
Project Manager

Signiture of Reviewer:

Signiture of Approver:
Contracting Officer RepresentativeDate:31 Dec 99

&"Arial,Bold"&UFOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .