A6 PWS ENCL1_Drawings REV3.pdf
PDF 335 KB Posted
- Attached to
- Hydraulic Hardline Piping
- Solicitation number
- N0016726Q1089
About this file
This document is a technical schematic diagram illustrating hydraulic piping layouts for testing equipment at two separate Naval Surface Warfare Center Carderock Division (NSWCCD) facilities.
The primary configuration (NSWCCD Building 60, Room 172) depicts a hydraulic system connecting an MTS 505.60 Hydraulic Power Unit (HPU) in the pump room to multiple MTS test frames via non-welded piping. The system includes three MTS 318-series frames (100kip and 55kip capacities), two MTS 370.10 22kip frames, and additional 22kip frames distributed throughout the facility. Hydraulic non-welded piping with separate pressure, return, and drain lines extends approximately 50 feet horizontally through a trench containing existing piping, with vertical runs of 10-30 feet to individual test frames. The contract scope includes installation of individual ball valves and hydraulic tees with caps for each pressure, return, and drain line. All piping lengths are estimated. The optional secondary configuration (NSWCCD Building 19, Room B-Bay) shows a simplified layout with six MTS 370.10 22kip frames connected to an HPU via a maximum 30-foot horizontal run with maximum 2-foot branch lines to each frame, utilizing existing concrete wall penetrations for piping routing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Gov_Response_Hardline_Piping_PPI.pdf | ||
| Solicitation - N0016726Q1089.pdf | ||
| Wage Determination MD20260120 060426.pdf | ||
| Pre Proposal Inquiry Spreadsheet Hardline Piping.xlsx | XLSX spreadsheet | |
| RFQ N0016726Q1089 Hydraulic Hardline Piping.pdf | ||
| A6 PWS_172 Hardline Piping - RV3.pdf | ||
| Price Proposal Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MTS 318.50
100kip Frame
MTS 318.25
A/T, 55kip
Frame
MTS 370.10
22kip Frame
Hydraulic Piping (Existing)
Hydraulic Non-Welded Piping (CONTRACT) Separate Hydraulic Pipes for Pressure, Return, and Drain Lines
50 ft.
10 ft.
25 ft.
60/172A (Pump Room)
NSWCCD BLDG 60 RM 172 – V2
M
TS 505.60 H
PU
MTS 370.10
22kip Frame
30 ft.
10 ft.
30 ft.
10 ft.
Hydraulic Piping Trench Trench contains existing non-welded piping
Hydraulic Valves – Individual Ball Valves for Pressure, Return, Drain Lines
Hydraulic Tees w/ Caps – Pressure, Return, Drain Lines
25 ft.
25 ft.
NOTE: Piping lengths are estimated.
NSWCCD BLDG 19 RM B-BAY (OPTION)
CONCRETE WALL
M
TS H
PU
Hydraulic Non-Welded Piping (CONTRACT) Separate Hydraulic Pipes for Pressure, Return, and Drain Lines
Hydraulic Valves – Individual Ball Valves for Pressure, Return, Drain Ball Valves
Hydraulic Tees w/ Caps – Pressure, Return, Drain Lines
MTS 370.10
22kip Frame
MTS 370.10
22kip Frame
Utilize existing wall penetrations for piping
MAX 30 ft.
MTS 370.10
22kip Frame
MTS 370.10
22kip Frame
MTS 370.10
22kip Frame
MTS 370.10
22kip Frame
MAX 2 ft.
NOTE: Piping lengths are estimated.