Price Form.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Equipment Shelter & POP Installation
- Solicitation number
- 2138786
- Issued by
- Essex County, New York
About this file
This is a Price Form for an Equipment Shelter & Point of Presence (POP) Installation project in Franklin County, New York, detailing labor and materials required across three sites. Site 1 encompasses the DSS Building in Malone and includes civil work such as concrete pads, utility trenches, and site restoration, along with installation of a county-furnished 8'x12' shelter, 30kW Cummins generator with 24-hour tank, 1-ton HVAC unit, electrical infrastructure including contractor-supplied conduit and wiring, grounding systems with ground rods and exothermic welds, and equipment racks with cable ladder systems. Site 2 at the Westville Fire Department in Constable requires installation of county-furnished equipment and one equipment rack with floor anchoring, weather head and cable entry components, electrical work including a 20-ampere two-pole breaker and sub-meter with power feeders, and grounding systems with building steel bonding. The form indicates a third site exists, though detailed line items are not provided in the visible content.
The price form presents all line items with zero dollar amounts listed in both the unit price and extended price columns, suggesting this is a template awaiting contractor pricing submission. The work involves a combination of county-furnished items requiring only installation labor (identified as OFCI—labor costs only) and contractor-furnished materials and labor for supporting infrastructure, electrical, and grounding components. No incumbent has held an identical or substantially similar contract within the past five years. The file does not specify response deadlines, contract terms, or renewal options in the visible sections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Westville Fire Dept_Franklin County_PCD_Rev0.06.19.2026.pdf | ||
| DSS Building_FranklinCounty_CD_Rev0.08.10.2026_S&S.pdf | ||
| Malone Relay Rack Layout 7.29.26.xlsx | XLSX spreadsheet | |
| BOM DSS Shelter 8.25.26.xlsx | XLSX spreadsheet | |
| Westville Racks.xlsx | XLSX spreadsheet | |
| DSS 8X12 RC SHELTER.pdf | ||
| FC_MIP3_RFB-26-0921-1_Advertisement_for_Bids.pdf | ||
| FC_MIP3_Shelter_RFB-26-0921-1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| # | Description of Work | Unit Price ($) | Quantity | Extended ($) | |
| SITE 1 — DSS Building, 184 Finney Blvd, Malone | |||||
| 1.1 | Site civil: concrete pads (shelter & generator), utility trench, conduit, backfill, site restoration | $ - 0 | |||
| 1.2 | Install County-Furnished AP FORT 8’x12’ shelter (AMCS-14496104-STD) — OFCI: labor, rigging, setting on pad | $ - 0 | |||
| 1.3 | Install County-Furnished 30kW Cummins C30D6 generator w/ 24-hr tank — OFCI: labor, setting, connections, load bank test | $ - 0 | |||
| 1.4 | Install County-Furnished 1-ton HVAC unit — OFCI: labor and connections | $ - 0 | |||
| 1.5 | Electrical: Contractor-furnished conduit, wire, load center connections, manual transfer switch wiring, all contractor-supplied electrical materials and labor | 5 | |||
| 1.6 | Complete grounding system — Contractor-furnished ground rods, halo, bus bars, exothermic welds, bonding conductors | $ - 0 | |||
| 1.7 | Install County-Furnished equipment, equipment racks (2) and overhead cable ladder — OFCI: labor; Contractor-furnished rack hardware, fasteners, cable ladder supports | $ - 0 | |||
| SITE 1 TOTAL | $ - 0 | ||||
| SITE 2 — Westville Fire Department, 3827 State Route 37, Constable | |||||
| 2.1 | Install County-Furnished equipment and equipment rack (1) and floor anchor — OFCI: labor; Contractor-furnished anchor hardware | $ - 0 | |||
| 2.2 | Weather head, cable entry port, and overhead fiber cable routing — Contractor-furnished all materials and labor | $ - 0 | |||
| 2.3 | Electrical: 20A/2P breaker, sub-meter, power feeders in Contractor-furnished conduit to rack | $ - 0 | |||
| 2.4 | Grounding: Contractor-furnished ground bus bar, building steel bonding, all bonding conductors and labor | $ - 0 | |||
| SITE 2 TOTAL | $ - 0 | ||||
| GRAND TOTAL — ALL THREE SITES | $ - 0 |