Malone Relay Rack Layout 7.29.26.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Equipment Shelter & POP Installation
Solicitation number
2138786
Issued by
Essex County, New York

About this file

This file is a relay rack layout diagram for the Malone equipment installation, associated with a New York State local contract opportunity for Equipment Shelter & Point of Presence (POP) Installation managed by Franklin County, New York. The document presents a detailed schematic of a 84-inch-tall relay rack system configured across two relay racks and one power rack, specifying the precise positioning of telecommunications and power distribution equipment from position 1 (battery tray at base) to position 48 (at top). Key equipment components include Calix E7-2 shelves (three units in positions 30-34), Commscope fiber distribution panels and splitters (1:32 splitters in positions 33-35 and 24-port fiber distribution panel in position 46), Nokia MF-2 batteries, ICT Hybrid Ultra DC Power System, Westell NPGMT1125 units, Ciena fiber LPC to UPC patch panel, and Telect fuse panel, supporting a comprehensive telecommunications infrastructure deployment.

The layout diagram does not contain pricing information, set-asides, incumbent details, or specific contract terms within the file itself. The related contract opportunity indicates that no business enterprises were awarded identical or substantially similar procurement contracts within the past five years, suggesting this may represent new infrastructure development or expansion in Franklin County, New York. Additional contract details including bid submission dates, site visit requirements, and funding sources would be contained in the primary contract solicitation document rather than in this technical equipment specification file.

View the file

Other files

File Type Posted
Westville Racks.xlsx XLSX spreadsheet
DSS 8X12 RC SHELTER.pdf PDF
FC_MIP3_RFB-26-0921-1_Advertisement_for_Bids.pdf PDF
FC_MIP3_Shelter_RFB-26-0921-1.pdf PDF
Price Form.xlsx XLSX spreadsheet
Westville Fire Dept_Franklin County_PCD_Rev0.06.19.2026.pdf PDF
DSS Building_FranklinCounty_CD_Rev0.08.10.2026_S&S.pdf PDF
BOM DSS Shelter 8.25.26.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vermontville

Netsure 502 58236800 Telect Fuse Panel

Ciena

Fiber LPC to UPC patch panel Nokia MF-2

Batteries

Malone-Relay Rack1 Layout

MtgMtgMtg
PosPosPos
4848ICT Hybrid Ultra DC Pwr Sys48
Westell NPGMT1125 10A-10B47Westell NPGMT1125 10A-10B4747
46Commscope 24 Port FDP FC-DANC Tie Pnl4646
454545
44Commscope FPX 144 Fiber Dist Pnl 14444
434343
424242
414141
404040
393939
383838
373737
363636
35Commscope 1:32 Splitter Sh 13535
Calix E7-2 Shelf #1 ASM100134Commscope 1:32 Splitter Sh 23434
33Commscope 1:32 Splitter Sh 33333
Calix E7-2 Shelf #2, XG1601323232
313131
Calix E7-2 Shelf #3, XG402303030
292929
282828
84"272727
262626
252525
242424
232323
222222
212121
202020
191919
181818
171717
161616
151515
141414
131313
121212
111111
101010
999
88Batteries8
777
666
555
444
333
222
11Battery Tray1
Relay Rack 1Relay Rack 2Power Rack

File details come from the government source that posted it. Updated .