Price Breakout Schedule.pdf

PDF 202 KB Posted

Attached to
W912QR26QA070 - Buckhorn Lake Debris Clean Up
Solicitation number
W912QR26QA070
Issued by

About this file

This is a Price Breakout Schedule for a debris removal and disposal contract. The base scope of work includes four line items: mobilization (per each); removal, reduction, and disposal of 16,000 cubic yards of unreduced vegetation debris; removal and disposal of 10 cubic yards of construction and white goods debris; and demobilization (per each). The contractor must provide unit costs for each base item, with a total base price calculated upon completion of all entries.

The contract includes two optional line items that may be exercised if needed. Option 1 allows for removal and disposal of up to 1,000 cubic yards of vegetation debris, awardable up to 10 times, while Option 2 covers removal and disposal of 10 cubic yards of construction and white goods debris, awardable up to 4 times. Contractors must submit pricing for each optional line item on a per-unit basis. The schedule requires a total base price, a total for all options combined, and a grand total reflecting the base plus all potential options. Pricing is structured to allow the government flexibility in exercising options based on actual debris removal needs.

View the file

Other files

File Type Posted
Solicitation - W912QR26QA070.pdf PDF
Exhibits.pdf PDF
Reps and Certs.pdf PDF
Additional Clause.pdf PDF
SOW.pdf PDF
Special Instructions1.pdf PDF
PIEE Directions.pdf PDF
PROJNET INSTRUCTIONS.pdf PDF
Wage Rates.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE BREAKOUT SCHEDULE

BASE DESCRIPTION Per Unit UNIT COST 0001 Mobilization $ EA $ 0002 Removal, reduction, and disposal of 16,000 Cubic Yards of unreduced vegetation debris

$ 16,000

CY

0003 Removal and disposal of 10 Cubic Yards of construction and white goods debris

$ 10 CY $

0004 Demobilization $ EA $ Total Base: $

OPTION DESCRIPTION Per Unit UNIT COST 0005 Option 1: Removal and disposal of 1,000 Cubic Yards of vegetation debris (Awardable up to 10 times)

$ 1,000 CY $

0006 Option 2: Removal and disposal of 10 Cubic Yards of construction and white goods debris (Awardable up to 4 times)

$ 10 CY $

Total Base: $ Total Base + All Options: $

NOTE: Option 001 can be exercised up to 10 times if needed. Option 002 can be exercised up to 4 times in needed.

File details come from the government source that posted it. Updated .