Document Type: This file comprises exhibits accompanying a federal contract opportunity, including a project map, sample forms, a quality control plan template, and project photographs.

Exhibit A - Project Location Map: Depicts Buckhorn Lake State Resort Park in Kentucky, showing the lake's extent, surrounding counties (Perry, Leslie, Letcher, Knott, and Harlan), access routes via US Highways 23, 80, and 50, and designated shoreline areas including protected lake shoreline areas, limited development shoreline areas, and public recreation/prohibited access zones. The map identifies key locations such as Buckhorn Dam, spillway, Gays Creek, Trace Branch, Confluence, Daniel Boone Parkway, Dry Hill Bridge, and surrounding communities.

Exhibit B - Contract Discrepancy Report (DA Form 5479-R): A sample federal form for documenting contract performance issues, requiring contract number, contractor and manager identification, dates (prepared, oral notification, returned by contractor, action complete), description of discrepancies, signatures from the contracting officer and contractor representative, and sections for government evaluation and corrective actions.

Exhibit C - Quality Control Plan Sample: Outlines contractor requirements for pre-work employee training on contract specifications, crew cross-training, task completion checklists with timestamps and employee sign-offs, and designation of a Quality Control Inspector (QCI) in writing. The plan specifies that inspections must occur immediately upon work completion using random or planned sampling for routine items and 100 percent inspection for unusual, important, or highly visible items. Zero defect tolerance is mandated, with immediate corrective action required. Daily Quality Control Inspection Reports documenting completed work, facilities inspected, inspection times, results, and any deficiencies must be submitted to the Corps of Engineers same-day or next morning before 10:00 a.m. The plan includes procedures for addressing Contract Discrepancy Reports issued by government representatives.

Exhibits D - Project Photographs: Three photographs showing Buckhorn Lake, including one depicting debris containment booming on the water, one showing a natural shoreline with autumn foliage, and one displaying fallen logs and trees along the water's edge.

View the file

Other files

File Type Posted
Solicitation - W912QR26QA070.pdf PDF
Reps and Certs.pdf PDF
Price Breakout Schedule.pdf PDF
Additional Clause.pdf PDF
SOW.pdf PDF
Special Instructions1.pdf PDF
PIEE Directions.pdf PDF
PROJNET INSTRUCTIONS.pdf PDF
Wage Rates.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A

Exhibit B

Sample Forms

Exhibit C Quality Control Plan Sample

Prior to beginning work, each employee will be trained to perform the task he or she has been hired to perform.

This training will consist of a review and thorough explanation of the contract specifications and requirements, followed by ‘on-the-job’ training to ensure that the contract requirements are understood. All members of a crew will be cross-trained, so that they understand all aspects of a particular type of work. Following training, each employee will be provided with a checklist of work that they are required to perform, which will serve to ensure that all aspects of a particular job are completed on time. The employee will mark each item as it is completed (with completion time), and will sign and date each sheet to ensure accountability for completed work.

Prior to start of the contract, the Contractor will designate a Quality Control Inspector (QCI) in writing. The designated QCI will perform inspections of completed work as soon as possible to ensure that the work meets contract specifications. The inspection schedule will depend on the type of work being completed; items of a routine nature will be inspected based on a random or planned sampling schedule. 100% of unusual items, items which are more important, or highly visible items will be inspected.

Allowable reject levels for all items of work will be zero.

Upon discovery of any deficiency, corrective action will be initiated immediately. The QCI will immediately either correct the deficiency personally, direct another employee to correct the deficiency, or direct the employee who marked the item as ‘complete’ to correct the deficiency. The QCI will meet with the employee who was responsible for initial completion of the work and review contract specifications for the work which was inadequately performed.

The QCI will determine what actions caused the inadequate work and take immediate steps to ensure that the work is correctly performed the next time it is scheduled.

A Quality Control Inspection Report will be completed by the QCI for each day’s work. This report will document what work was completed, what facilities were inspected, the time the inspections were performed, and the results of these inspections. This report will also document any deficiencies noted during inspections and corrective actions taken on deficiencies. This report will be provided to the Corps of Engineers the same day the work is scheduled, or the next morning prior to 10:00 a.m. by e-mail, fax, or in person.

If a Contract Discrepancy Report (CDR) is issued by the government, the Contractor will review the CDR with the QCI within one day of receipt of the CDR, and will meet with the Corps of Engineers representative as soon as possible. Prior to meeting with the Corps representative, the Contractor will meet with the QCI and the individual/crew responsible for completing the work to determine the cause of the contract discrepancy and what actions will be required to prevent any reoccurrence. The Contractor will document these actions on the CDR for submittal to the government.

The contractor will modify these procedures as required to ensure that contract specifications are met.