Prevailing Wage Rate Schedule Summary
This is a prevailing wage rate schedule issued by the State of Michigan for state-funded construction projects, specifically for Phase 3 Improvements at F.J. McLain State Park in Houghton County. The document, issued on April 11, 2022, by requestor Sanders & Czapski Associates, PLLC, establishes official commercial prevailing wage rates applicable to the project (Project Number 751/16043.JBB, Official Request #32). The contract must be awarded by July 10, 2022. The schedule comprehensively details hourly wage rates across 45+ construction trade classifications, including straight time, time-and-a-half overtime, and double-time compensation levels, with effective dates primarily ranging from November 2021 through January 2022.
The prevailing wage rates cover a broad spectrum of construction trades and labor categories, from skilled trades such as electricians, plumbers, and carpenters to general laborers and specialized roles including divers, equipment operators, and asbestos abatement workers. Apprentice wage rates are provided for most classifications with specified progression periods. The rates reflect geographic and work-type variations, with some classifications including provisions for alternative work schedules (such as 4-10 hour days), make-up days for inclement weather, and overtime multipliers after specified hours. Contractors and subcontractors are required to post copies of all prevailing wage and fringe benefit rates in a conspicuous location on the construction site. The document serves as the binding wage rate reference for all workers on this state-funded project to ensure compliance with Michigan's prevailing wage requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Michigan
Requestor: Sanders & Czapski Associates, PLLC
Project Description: Phase 3 Improvements - F.J. McLain State Park
Houghton County
Official Request #: 32
Project Number: 751/16043.JBB
Straight Hourly
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Boilermaker
H H H H H H H D$72.47 $107.55 $142.63
BO169
Boilermaker Y
12/13/2021
Apprentice Rates:
1st Period $53.53 $79.15 $104.75
2nd Period $55.14 $81.56 $107.97
3rd Period $56.73 $83.94 $111.15
4th Period $58.31 $86.31 $114.31
5th Period $59.85 $88.62 $117.39
6th Period $63.03 $93.39 $123.75
7th Period $66.17 $98.10 $130.03
8th Period $69.32 $102.83 $136.33
Bricklayer
H H H H H H H D$51.92 $66.19 $80.46
BR2-UP
Bricklayers, Stone Masons, Marble Masons, Mosaic Workers, Cement Masons, Plasterers, Pointer, Cleaner, Caulkers, Plant Masonry Workers, Refractory Specialists, Tuck Pointers, Tile Layers, Terrazzo Workers, and Marble, Tile & Terrazzo Finishers.
N
12/3/2021
Apprentice Rates:
1st Period $41.93 $51.20 $60.48
2nd Period $43.36 $53.35 $63.34
3rd Period $44.78 $55.48 $66.18
4th Period $46.21 $57.62 $69.04
5th Period $47.64 $59.77 $71.90
6th Period $49.07 $61.92 $74.76
Requestor: Sanders & Czapski Associates, PLLC
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Straight Hourly
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Carpenter
X X H X X X X D$48.25 $61.82 $75.38
CA1510-C
Carpenter, Drywall Taper & Finisher, & Floor Layer Y
12/1/2021
Apprentice Rates:
1st 6 months $37.40 $45.54 $53.68
2nd 6 months $38.75 $47.56 $56.38
3rd 6 months $40.11 $49.60 $59.10
4th 6 months $41.47 $51.64 $61.82
5th 6 months $42.82 $53.67 $64.52
6th 6 months $44.18 $55.71 $67.24
7th 6 months $45.54 $57.75 $69.96
8th 6 months $46.89 $59.78 $72.66
Saturday make up day allowedcomment
X X X X X X X D$61.82 $82.17 $102.52
CA1510-D
Carpenter - Diver Y
12/3/2021
Apprentice Rates:
1st 6 months $49.61 $63.86 $78.10
2nd 6 months $50.63 $65.38 $80.14
3rd 6 months $51.64 $66.90 $82.16
4th 6 months $53.68 $69.96 $86.24
5th 6 months $55.72 $73.02 $90.32
6th 6 months $57.75 $76.06 $94.38
7th 6 months $59.78 $79.11 $98.44
8th 6 months $60.80 $80.64 $100.48
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
X X X X X X X D$54.33 $70.65 $86.96
CA1510-Mw
Millwright Y
12/1/2021
Apprentice Rates:
1st 6 months $44.54 $55.96 $67.38
2nd 6 months $45.19 $56.94 $68.68
3rd 6 months $46.17 $58.40 $70.64
4th 6 months $47.80 $60.85 $73.90
5th 6 months $49.44 $63.31 $77.18
6th 6 months $51.07 $65.76 $80.44
7th 6 months $52.70 $68.20 $83.70
8th 6 months $53.51 $69.42 $85.32
X X H X X H H D$48.45 $62.12 $75.78
CA1510-P
Pile driver Y
12/1/2021
Apprentice Rates:
1st 6 months $40.25 $49.82 $59.38
2nd 6 months $40.93 $50.84 $60.74
3rd 6 months $41.62 $51.87 $62.12
4th 6 months $42.98 $53.91 $64.84
5th 6 months $44.35 $55.96 $67.58
6th 6 months $45.72 $58.02 $70.32
7th 6 months $47.08 $60.06 $73.04
8th 6 months $47.77 $61.10 $74.42
Saturday make up day allowedcomment
Cement Mason
H H H H H H H D$38.67 $50.71 $62.74
CE514-UP
Cement Mason Y
11/29/2021
Apprentice Rates:
1st Year $30.25 $38.08 $45.90
2nd Year $32.65 $41.68 $50.70
3rd Year $35.06 $45.29 $55.52
Requestor: Sanders & Czapski Associates, PLLC
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Drywall
H H H H H H H D$42.87 $57.12 $71.36
PT-1011-DF
Drywall Finisher, Soundproofing, & Plural Component Applicator N
1/7/2022
Apprentice Rates:
1st 1,000 hours $31.47 $40.02 $48.56
2nd 1,000 hours $32.90 $42.16 $51.42
3rd 1,000 hours $34.32 $44.29 $54.26
4th 1,000 hours $35.75 $46.44 $57.12
5th 1,000 hours $37.17 $48.56 $59.96
6th 1,000 hours $38.60 $50.71 $62.82
7th 1,000 hours $40.02 $52.84 $65.66
8th 1,000 hours $41.45 $54.98 $68.52
Electrician
H H H H H H H D$59.14 $77.43 $95.72
EC-906z2H
Inside wireman for work above $160,000 A 4 ten schedule may be worked if 4 consecutive days, M-Th
Y
11/15/2021
Apprentice Rates:
1st period $30.38 $37.71 $45.02
2nd period $32.20 $40.43 $48.66
3rd period $35.87 $45.94 $56.00
4th period $39.52 $51.42 $63.30
5th period $43.18 $56.90 $70.62
6th period $46.84 $62.39 $77.94
Friday make up day allowedcomment
Requestor: Sanders & Czapski Associates, PLLC
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H H H H H H D$57.08 $74.34 $91.60
EC-906z2L
Inside wireman for work below 160,000 A 4 ten schedule may be worked if 4 consecutive days, M-Th
Y
11/15/2021
Apprentice Rates:
1st period $29.55 $36.46 $43.36
2nd period $31.27 $39.04 $46.80
3rd period $34.73 $44.23 $53.72
4th period $38.18 $49.40 $60.62
5th period $41.63 $54.58 $67.52
6th period $45.08 $59.76 $74.42
Friday make up day allowedcomment
Elevator Constructor
D D D D D D D D$96.72 $152.57
EL-85
Elevator Constructor Mechanic Y
11/30/2021
Apprentice Rates:
1st year $68.96 $99.68
2nd year $74.88 $111.18
3rd year $77.85 $116.95
4th year $84.65 $129.33
4 tens allowed M-TH comment
Glazier
H H H H H H H D$49.84 $67.73 $85.62
GL-826
Glazier 4 tens allowed on consecutive days Y
12/9/2021
Apprentice Rates:
1st level $31.62 $40.40 $49.18
2nd level $35.12 $45.66 $56.18
3rd Level $40.38 $53.54 $66.70
4th level $45.66 $61.46 $77.26
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Heat and Frost Insulator
H H H H D D D D$42.97 $55.93 $68.89 as127
Heat and Frost Insulators Y
11/3/2014
Apprentice Rates:
1st year $30.01 $36.49 $42.97
2nd year $32.60 $40.37 $48.15
3rd year $35.19 $44.26 $53.33
4th year $37.79 $48.16 $58.53 make up day allowed
X X X H H H H H$25.29 $36.51
AS25S
Spray Insulation N
6/2/2016
Ironworker
H H D H D D D D$50.07 $69.76 $89.45
IR-8-A
For work over $10 million: Structural, Ornamental, Machinery Rigger & Reinforcing Ironworker; installation of sheet metal siding A 4-10 work week allowed Monday thru Thursday. Friday may be used as a make-up day. Hours in excess of 40 must be paid tim
Y
9/29/2014
Apprentice Rates:
0 - 1,000 hours $25.39 $37.75 $50.11
1,001 - 2,000 hours $37.71 $51.22 $64.73
2,001 - 3,000 hours $39.01 $53.17 $67.33
3,001 - 4,000 hours $40.31 $55.12 $69.93
4,001 - 5,000 hours $41.61 $57.07 $72.53
5,001 - 6,000 hours $42.92 $59.04 $75.15
6,001 - 7,000 hours $44.22 $60.98 $77.75 make up day allowed
Requestor: Sanders & Czapski Associates, PLLC
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H D H D D D D$46.73 $64.76 $82.79
IR-8-B
For work under $10 Million: Structural, Ornamental, Machinery Rigger & Reinforcing Ironworker; pre-engineered metal buildings A 4-10 work week allowed Monday thru Thursday. Friday may be used as a make-up day. Hours in excess of 40 must be paid time a
Y
9/29/2014
Apprentice Rates:
0-1,000 hours $25.39 $37.75 $50.11
1,001 - 2,000 hours $37.71 $51.22 $64.73
2,001 - 3,000 hours $39.01 $53.17 $67.33
3,001 - 4,000 hours $40.31 $55.12 $69.93
4,001 - 5,000 hours $41.61 $57.07 $72.53
5,001 - 6,000 hours $42.92 $59.04 $75.15
6,001 - 7,000 hours $44.22 $60.98 $77.75 make up day allowed
Laborer
X X D X D D D D$37.68 $49.67 $61.66
L1329-B-A
Class A Laborer - construction laborer on building and heavy construction work, storm, and sanitary sewers on all construction sites and streets which are not included in the road builder rates, tool crib attendant, civil engineer helper, rodman, oxi-gun
Y
11/29/2021
Apprentice Rates:
0 - 1,000 hours $31.68 $40.67 $49.66
1,001 - 2,000 hours $32.78 $42.37 $51.96
2,001 - 3,000 hours $33.98 $44.17 $54.36
3,001 - 4,000 hours $36.48 $47.87 $59.26
X X D X D D D D$39.91 $53.02 $66.12
L1329-B-B
Class B Laborer - Cement gun nozzleman, blasters, miners, drillers, buster operators, layers of all non-metallic pipe
Y
11/29/2021
X X X X X X X D$37.68 $49.67 $61.66
L1329-B-C
Class C Laborer - caisson worker & airtrack Y
12/16/2021
X X X X X X X D$39.91 $53.02 $66.12
L1329-B-D
Class E Laborer - digester, tanks & kilns Y
12/16/2021
Requestor: Sanders & Czapski Associates, PLLC
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
H H H H H H H D$41.52 $55.58 $69.64
MITA-RZ4-C1
Laborer Road Class 1: asphalt shoveler or loader, yard man, fence erector tender, dumper, joint filling, form setting, form stripper, pavement reinforcing, waterproofing, seal coating, bridge painting, sandblasting, pressure grouting, RC equipment
Y
1/5/2022
Apprentice Rates:
3,001-4,000 hours $40.31 $53.77 $67.22
2,001-3,000 hours $39.46 $52.49 $65.52
1,001-2,000 hours $36.68 $48.32 $59.96
0-1,000 hours $35.46 $46.49 $57.52
H H H H H H H D$41.73 $55.90 $70.06
MITA-RZ4-C2
Laborer Road Class 2: mixer operator, air or electric tool operator, spreader, boxman, concreter paddler, power chain saw operator, paving patch truck dumper, tunnel mucker, concrete saw operator, dry pack macine and roto-mill grounds person
Y
1/5/2022
Apprentice Rates:
3,001-4,000 hours $40.51 $54.07 $67.62
2,001-3,000 hours $38.07 $50.41 $62.74
1,001-2,000 hours $36.84 $48.56 $60.28
0-1,000 hours $35.62 $46.73 $57.84
H H H H H H H D$42.02 $56.33 $70.64
MITA-RZ4-C3
Laborer Road Class 3: tunnel miner, finish tenders, guard rail builder, median barrier installer, earth retention barrier and wall installer, fence erector, bottom man, powder man, wagon drill and air track operator, curb and side rail setter
Y
1/5/2022
Apprentice Rates:
3,001-4,000 hours $40.78 $54.47 $68.16
2,001-3,000 hours $38.31 $50.77 $63.22
1,001-2,000 hours $37.08 $48.92 $60.76
0-1,000 hours $35.84 $47.06 $58.28
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H H H H H H D$42.46 $56.99 $71.52
MITA-RZ4-C4
Laborer Road Class 4: asphalt raker Y
1/5/2022
Apprentice Rates:
3,001-4,000 hours $41.20 $55.10 $69.00
2,001-3,000 hours $38.69 $51.33 $63.98
1,001-2,000 hours $37.43 $49.45 $61.46
0-1,000 hours $36.17 $47.55 $58.94
H H H H H H H D$42.08 $56.42 $70.76
MITA-RZ4-C5
Laborer Road Class 5: pipe layers, oxy-gun Y
1/5/2022
Apprentice Rates:
3,001-4,000 hours $40.84 $54.56 $68.28
2,001-3,000 hours $38.36 $50.84 $63.32
1,001-2,000 hours $37.12 $48.98 $60.84
0-1,000 hours $35.88 $47.12 $58.36
H H H H H H H D$42.51 $57.07 $71.62
MITA-RZ4-C6
Laborer Road Class 6: line form setter for curb or pavement, asphalt screed checker/screw man on asphalt paving machines
Y
1/5/2022
Apprentice Rates:
3,001-4,000 hours $41.25 $55.17 $69.10
2,001-3,000 hours $38.73 $51.39 $64.06
1,001-2,000 hours $37.47 $49.51 $61.54
0-1,000 hours $36.21 $47.61 $59.02
H H H H H H H D$45.84 $62.06 $78.28
MITA-RZ4-C7
Laborer Road Class 7: concrete specialist - including finishing and trowling, cast in place or precast by any method
Y
1/5/2022
Apprentice Rates:
3,001-4,000 hours $44.41 $59.91 $75.42
2,001-3,000 hours $41.56 $55.64 $69.72
1,001-2,000 hours $40.13 $53.49 $66.86
0-1,000 hours $38.70 $51.35 $64.00
Requestor: Sanders & Czapski Associates, PLLC
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
H H H X X X X D$46.70 $62.52 $78.33
MLDC
Asbestos & Lead Abatement Laborer 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days
Y
1/7/2022
Apprentice Rates:
Trainee 600 hours +1 year $34.07
Laborer - Hazardous
H H H H H H H D$37.50 $52.99 $68.48
LHAZ-Z11-A
Class A - performing work in conjunction with site preparation and other preliminary work prior to actual removal, handling, or containment of hazardous waste substances not requiring use of personal protective equipment required by state or federal reg
Y
12/14/2021
Apprentice Rates:
0-1,000 work hours $31.50 $43.99 $56.48
1,001-2,000 work hours $32.70 $45.79 $58.88
2,001-3,000 work hours $33.90 $47.59 $61.28
3,001-4,000 work hours $36.30 $51.19 $66.08
4 10s allowed M-Th or T-F; inclement weather makeup day Friday make up day allowedcomment
H H H H H H H D$38.50 $54.29 $70.28
LHAZ-Z11-B
Class B - performing work in conjunction with the removal, handling, or containment of hazardous waste substances when the use of personal protective equipment levels "A", "B" or "C" is required.
Y
12/14/2021
Apprentice Rates:
0-1,000 work hours $32.26 $44.93 $57.80
1,001-2,000 work hours $33.50 $46.79 $60.28
2,001-3,000 work hours $34.75 $48.66 $62.78
3,001-4,000 work hours $37.25 $52.42 $67.78
4 10s allowed M-Th or T-F; inclement weather makeup day Friday make up day allowedcomment
Requestor: Sanders & Czapski Associates, PLLC
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Laborer - Landscape
X X H X X X H D$28.80 $39.51 $50.18
LLAN-Z2-A
Class B1: Landscape Operatior includes air, gas, and diesel equipment operator, lawn sprinkler installer,skidsteer, mini excavators, ride and walk behind trenchers, backhoe loaders, off road dump vehicle, articulated haulers, hydroseeder, wheel loaders
1/4/2022
X X H X X X H D$26.80 $36.48 $46.15
LLAN-Z2-B
Class B2: Skilled Landscape Laborer: small power tool operator, lawn sprinkler installers' tender, irrigation installers' tender material mover
1/4/2022
H H H H H H H D$24.66 $33.27 $41.87
LLAN-Z2-C
Class C: landscape laborer with 90 or more calendar days worked N
1/7/2022
H H H H H H H D$15.54 $23.31 $31.08
LLAN-Z2-D
Class D: Inexperienced landscape laborer - individual who has worked less than 90 calendar days
N
1/7/2022
Laborer Underground - Tunnel, Shaft & Caisson
X X X X X X X D$38.42 $51.00 $63.57
LAUCT-Z2-1
Class I - Tunnel, shaft and caisson laborer, dump man, shanty man, hog house tender, testing man (on gas), and watchman.
Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $32.85 $42.64 $52.43
1,001-2,000 work hours $33.97 $44.32 $54.67
2,001-3,000 work hours $35.08 $45.99 $56.89
3,001-4,000 work hours $37.31 $49.33 $61.35
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
X X X X X X X D$38.51 $51.13 $63.75
LAUCT-Z2-2
Class II - Manhole, headwall, catch basin builder, bricklayer tender, mortar man, material mixer, fence erector, and guard rail builder
Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $32.92 $42.75 $52.57
1,001-2,000 work hours $34.04 $44.43 $54.81
2,001-3,000 work hours $35.16 $46.11 $57.05
3,001-4,000 work hours $37.39 $49.45 $61.51
X X X X X X X D$38.61 $51.28 $63.95
LAUCT-Z2-3
Class III - Air tool operator (jack hammer man, bush hammer man and grinding man), first bottom man, second bottom man, cage tender, car pusher, carrier man, concrete man, concrete form man, concrete repair man, cement invert laborer, cement finisher, con
Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $32.99 $42.85 $52.71
1,001-2,000 work hours $34.12 $44.55 $54.97
2,001-3,000 work hours $35.24 $46.23 $57.21
3,001-4,000 work hours $37.49 $49.60 $61.71
X X X X X X X D$38.77 $51.52 $64.27
LAUCT-Z2-4
Class IV - Tunnel, shaft and caisson mucker, bracer man, liner plate man, long haul dinky driver and well point man.
Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $33.11 $43.03 $52.95
1,001-2,000 work hours $34.25 $44.74 $55.23
2,001-3,000 work hours $35.38 $46.43 $57.49
3,001-4,000 work hours $37.64 $49.83 $62.01
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
X X X X X X X D$39.03 $51.91 $64.79
LAUCT-Z2-5
Class V - Tunnel, shaft and caisson miner, drill runner, keyboard operator, power knife operator, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars)
Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $33.31 $43.33 $53.35
1,001-2,000 work hours $34.45 $45.04 $55.63
2,001-3,000 work hours $35.60 $46.77 $57.93
3,001-4,000 work hours $37.89 $50.20 $62.51
X X X X X X X D$39.34 $52.38 $65.41
LAUCT-Z2-6
Class VI - Dynamite man and powder man. Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $33.54 $43.67 $53.81
1,001-2,000 work hours $34.70 $45.41 $56.13
2,001-3,000 work hours $35.86 $47.15 $58.45
3,001-4,000 work hours $38.18 $50.63 $63.09
X X X X X X X D$31.61 $40.78 $49.95
LAUCT-Z2-7
Class VII - Restoration laborer, seeding, sodding, planting, cutting, mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes and flagstones.
Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $27.75 $34.99 $42.23
1,001-2,000 work hours $28.52 $36.15 $43.77
2,001-3,000 work hours $29.29 $37.30 $45.31
3,001-4,000 work hours $30.84 $39.63 $48.41
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Laborer -Underground Open Cut, Class I
X X X X X X X D$35.55 $46.67 $57.79
LAUC-Z5-1
Construction Laborer Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $30.71 $39.41 $48.11
1,001-2,000 work hours $31.68 $40.86 $50.05
2,001-3,000 work hours $32.65 $42.32 $51.99
3,001-4,000 work hours $34.58 $45.22 $55.85
Laborer -Underground Open Cut, Class II
X X X X X X X D$35.69 $46.88 $58.07
LAUC-Z5-2
Mortar and material mixer, concrete form man, signal man, well point man, manhole, headwall and catch basin builder, guard rail builders, headwall, seawall, breakwall, dock builder and fence erector.
Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $30.82 $39.58 $48.33
1,001-2,000 work hours $31.79 $41.03 $50.27
2,001-3,000 work hours $32.77 $42.50 $52.23
3,001-4,000 work hours $34.72 $45.42 $56.13
Laborer -Underground Open Cut, Class III
X X X X X X X D$35.82 $47.08 $58.33
LAUC-Z5-3
Air, gasoline and electric tool operator, vibrator operator, drillers, pump man, tar kettle operator, bracers, rodder, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars, etc.), cement finisher, welder, pipe jacking and boring man, wagon
Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $30.92 $39.72 $48.53
1,001-2,000 work hours $31.90 $41.20 $50.49
2,001-3,000 work hours $32.88 $42.66 $52.45
3,001-4,000 work hours $34.84 $45.60 $56.37
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Laborer -Underground Open Cut, Class IV
X X X X X X X D$35.87 $47.15 $58.43
LAUC-Z5-4
Trench or excavating grade man. Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $30.95 $39.77 $48.59
1,001-2,000 work hours $31.94 $41.26 $50.57
2,001-3,000 work hours $32.92 $42.72 $52.53
3,001-4,000 work hours $34.89 $45.68 $56.47
Laborer -Underground Open Cut, Class V
X X X X X X X D$35.92 $47.23 $58.53
LAUC-Z5-5
Pipe Layer (including crock, metal pipe, multiplate or other conduits) Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $30.99 $39.83 $48.67
1,001-2,000 work hours $31.98 $41.32 $50.65
2,001-3,000 work hours $32.96 $42.78 $52.61
3,001-4,000 work hours $34.93 $45.74 $56.55
Laborer -Underground Open Cut, Class VI
X X X X X X X D$33.30 $43.30 $53.29
LAUC-Z5-6
Grouting man, top man assistant, audio visual television operations and all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work & the installation and repair of water service pipe and appurtenance
Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $29.03 $36.89 $44.75
1,001-2,000 work hours $29.88 $38.16 $46.45
2,001-3,000 work hours $30.74 $39.46 $48.17
3,001-4,000 work hours $32.45 $42.02 $51.59
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Laborer -Underground Open Cut, Class VII
X X X X X X X D$31.41 $40.46 $49.51
LAUC-Z5-7
Restoration laborer, seeding, sodding, planting, cutting, mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes, flagstones etc.
Y
1/4/2022
Apprentice Rates:
0-1,000 work hours $27.61 $34.76 $41.91
1,001-2,000 work hours $28.37 $35.90 $43.43
2,001-3,000 work hours $29.13 $37.04 $44.95
3,001-4,000 work hours $30.65 $39.32 $47.99
Operating Engineer - Marine Construction
H H H H H H H D$52.81 $78.57 $104.32
GLF D
Diver/Wet Tender/Tender/Rov Pilot/Rov Tender N
12/16/2021
X X H H H H H D$78.97 $102.47 $125.97
GLF-1
Diver/Wet Tender, Engineer (hydraulic dredge) Y
1/7/2022
Subdivision of county all Great Lakes, islands therein, & connecting & tributary waters make up day allowed
X X H H H H H D$77.47 $100.22 $122.97
GLF-2
Crane/Backhoe Operator, 70 ton or over Tug Operator, Mechanic/Welder, Assistant Engineer (hydraulic dredge), Leverman (hydraulic dredge), Diver Tender
Y
1/7/2022
Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters make up day allowed
X X H H H H H D$78.97 $102.47 $125.97
GLF-2B
Friction, Lattice Boom or Crane License Certification30 Y
1/7/2022
Subdivision of county All Great Lakes, islands, therein, & connecting & tributary waters make up day allowed
X X H H H H H D$72.92 $93.40 $113.87
GLF-3
Deck Equipment Operator, Machineryman, Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 lbs or more), Tug/Launch Operator, Loader, Dozer on Barge, Deck Machinery
Y
1/7/2022
Requestor: Sanders & Czapski Associates, PLLC
Project Description: Phase 3 Improvements - F.J. McLain State Park
StatewideCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters make up day allowed
X X H H H H H D$66.72 $84.10 $101.47
GLF-4
Deck Equipment Operator, (Machineryman/Fireman), (4 equipment units or more), Off Road Trucks, Deck Hand, Tug Engineer, & Crane Maintenance 50 ton capacity and under or Backhoe 115,000 lbs or less, Assistant Tug Operator
Y
1/7/2022
Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters make up day allowed
Operating Engineer General Construction & Underground
X X H H H H H D$61.10 $79.31 $97.51
EN-324UP-120GU
Crane 120' boom & jib N
12/10/2021
Double time after 12 hours Mon-Sat comment
X X H H H H H D$61.92 $80.54 $99.15
EN-324UP-140GU
Crane 140' boom & jib N
12/10/2021
Double time after 12 hours Mon-Sat comment
X X H H H H H D$65.22 $85.49 $105.75
EN-324UP-400GU
Crane with 400' or longer main boom & jib N
12/10/2021
Double time after 12 hours Mon-Sat comment
X X H H H H H D$57.80 $74.36 $90.91
EN-324UP-AGU
Class A- Regular equipment operator, crane, dozer, front end loader, pumpcrete, squeeze crete, job mechanic, welder, concrete pump, excavator, milling & pulverizing machines, & scraper (self-propelled & tractor drawn).
N
12/10/2021
Apprentice Rates:
1st 6 months $49.16 $61.39 $73.63
2nd 6 months $50.60 $63.55 $76.51
3rd 6 months $52.04 $65.71 $79.39
4th 6 months $53.48 $67.87 $82.27
5th 6 months $54.92 $70.03 $85.15
6th 6 months $56.36 $72.19 $88.03
Requestor: Sanders & Czapski Associates, PLLC
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Double time after 12 hours Mon-Sat comment
X X H H H H H D$54.55 $69.48 $84.41
EN-324UP-BGU
Class B- Air-Trac Drill, boom truck (non-swing), concrete mixers, material hoist and tugger, pumps 6" and over, beltcrete, sweeping machine, trencher, head grease man, winches, well points and freeze systems
N
12/10/2021
Double time after 12 hours Mon-Sat comment
X X H H H H H D$53.37 $67.71 $82.05
EN-324UP-CGU
Class C- Fork Truck, air compressor, conveyer, concrete saw, farm tractor(without attachments), generator, guard post driver, mulching machines, pumps under 6", welding machines, grease man
N
12/10/2021
Double time after 12 hours Mon-Sat comment
X X H H H H H D$52.43 $66.30 $80.17
EN-324UP-DGU
Class D- Oiler, fireman, heater operator, brock concrete breaker, elevators (other than passenger), end dump & skid steer
N
12/10/2021
Double time after 12 hours Mon-Sat comment
X X H H H H H D$40.65 $54.88 $69.11
EN-324UP-EGU
Class E - Fire watch for work performed by a mamber of the Operating Engineers, fueling of all poer-driven equipment when operatoed by a member of the Operating Engineers, ground man, hole watch for work performed by a member of the Operating Engineers, l
12/10/2021
X X H H H H H D$62.21 $80.97 $99.73
EN-324UP-GU
Crane 220' boom & jib N
12/10/2021
Double time after 12 hours Mon-Sat comment
X X H H H H H D$62.10 $88.38 $114.66
EN-324UP-MGU
Mechanic w/ truck & tools N
12/16/2021
Double time after 12 hours Mon-Sat comment
Operating Engineer Steel Work
X X H H H H H D$67.06 $88.25 $109.43
EN-324UP-120S
Crane 120' boom & jib Y
12/10/2021
Requestor: Sanders & Czapski Associates, PLLC
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Double time after 12 hours Mon-Sat comment
X X H H H H H D$67.36 $88.70 $110.03
EN-324UP-140S
Crane 140' boom & jib Y
12/10/2021
Double time after 12 hours Mon-Sat comment
X X H H H H H D$67.95 $97.16 $126.36
EN-324UP-220S
Crane 220' boom & jib Y
12/16/2021
Double time after 12 hours Mon-Sat comment
X X H H H H H D$70.30 $93.11 $115.91
EN-324UP-300S
Crane with 300' boom & jib Y
12/10/2021
Double time after 12 hours Mon-Sat make up day allowedcomment
X X H H H H H D$72.08 $95.78 $119.47
EN-324UP-400S
Crane with 400' boom & jib Y
12/10/2021
Double time after 12 hours Mon-Sat make up day allowedcomment
X X H H H H H D$60.59 $78.54 $96.49
EN-324UP-CWS
Compressor, Welder & Forklift Y
12/10/2021
Double time after 12 hours Mon-Sat comment
X X H H H H H D$66.19 $86.94 $107.69
EN-324UP-MS
Mechanic w/ truck & tools Y
12/10/2021
Double time after 12 hours Mon-Sat comment
X X H H H H H D$59.05 $76.23 $93.41
EN-324UP-OFS
Oiler & Fireman Y
12/10/2021
Double time after 12 hours Mon-Sat comment
Requestor: Sanders & Czapski Associates, PLLC
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
X X H H H H H D$64.41 $84.27 $104.13
EN-324UP-OS
Operator Y
12/10/2021
Apprentice Rates:
1st 6 months $54.05 $68.73 $83.41
2nd 6 months $55.77 $71.31 $86.85
3rd 6 months $57.50 $73.90 $90.31
4th 6 months $59.23 $76.50 $93.77
5th 6 months $60.96 $79.10 $97.23
6th 6 months $62.68 $81.68 $100.67
Double time after 12 hours Mon-Sat comment
Operating Engineer Underground
H H H H H H H D$60.93 $78.89 $96.85
EN-324A2-UC1
Class I Equipment - Backfiller Tamper, Backhoe, Batch Plant Operator, Clamshell, Concrete Paver 2 drums or larger, Conveyor Loader Euclid type, Crane (crawler, truck type or pile driving), Dozer, Dragline, Elevating Grader, endloader, gradall, grader, hyd
Y
12/10/2021
Apprentice Rates:
0-999 hours $49.19 $61.74 $74.29
1,000-1,999 hours $50.99 $64.44 $77.89
2,000-2,999 hours $52.78 $67.12 $81.47
3,000-3,999 hours $54.58 $69.82 $85.07
4,000-4,999 hours $56.37 $72.51 $88.65
5,000-5,999 hours $58.16 $75.19 $92.23
H H H H H H H D$56.04 $71.56 $87.07
EN-324A2-UC2
Class II Equipment - Boom Truck, Crusher, Hoist, Pump 6 inch discharge or larger, side boom tractor, Tractor (pneu-tired other than backhoe or front end loader), Trencher 8 ft. digging capcity and smaller, Vac Truck
H H H H H H H D$55.54 $70.81 $86.07
EN-324A2-UC3
Class III Equipment - Air Compressors 600 cfm or larger, Air Compressors 2 or more less than 600 dfm, Boom Truck non-swinging non-powered type boom, Concrete Breaker self-propelled or truck mounted, Concrete paver 1 drum 1/2 yd. or larger, Elevator other
Y
12/10/2021
Requestor: Sanders & Czapski Associates, PLLC
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
H H H H H H H D$55.26 $70.39 $85.51
EN-324A2-UC4
Class IV Equipment - Boiler, Concrete Saw 40 hp or over, curing machine self propelled, end dumps, extend a boom forklift, farm tractor with attachment, finishing machine concrete, firemen, hydraulic pipe pushing machine, mulching equipment, oiler, pumps
Painter
H H H H H H H D$37.65 $49.29 $60.92
PT-1011
Painter N
1/7/2022
Apprentice Rates:
1st 1000 hours $28.34 $35.32 $42.30
2nd 1000 hours $29.51 $37.08 $44.64
3rd 1000 hours $30.67 $38.82 $46.96
4th 1000 hours $31.83 $40.56 $49.28
5th 1000 hours $33.00 $42.31 $51.62
6th 1000 hours $34.16 $44.05 $53.94
7th 1000 hours $35.32 $45.79 $56.26
8th 1000 hours $36.49 $47.54 $58.60
Pipe and Manhole Rehab
H H H H H H H H$28.20 $38.20
TM247
General Laborer for rehab work or normal cleaning and cctv work-top man, scaffold man, CCTV assistant, jetter-vac assistant
4/17/2015
H H H H H H H H$32.70 $44.95
TM247-2
Tap cutter/CCTV Tech/Grout Equipment Operator: unit driver and operator of CCTV; grouting equipment and tap cutting equipment
H H H H H H H H$31.45 $43.07
TM247-3
CCTV Technician/Combo Unit Operator: unit driver and operator of cctv unit or combo unit in connection with normal cleaning and televising work
N
4/17/2015
Requestor: Sanders & Czapski Associates, PLLC
Project Description: Phase 3 Improvements - F.J. McLain State Park
StatewideCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
H H H H H H H H$33.20 $45.70
TM247-4
Boiler Operator: unit driver and operator of steam/water heater units and all ancillary equipment associated
H H H H H H H H$33.20 $45.70
TM247-5
Combo Unit driver & Jetter-Vac Operator N
H H H H H H H H$34.20 $47.20
TM247-6
Pipe Bursting & Slip-lining Equipment Operator N
Plasterer
H H H H H H H D$45.79 $60.94 $76.08
CE514-P-UP
Plasterer N
12/3/2021
Apprentice Rates:
1st Year $35.19 $45.04 $54.88
2nd Year $38.22 $49.58 $60.94
3rd Year $41.25 $54.12 $67.00
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Plumber & Pipefitter
H H H H H H H D$63.63 $94.76 $125.88
PL-111
Plumber & Pipefitter 4 ten hour days may be worked only Monday- Thursday
Y
1/7/2022
Apprentice Rates:
1st 6 months $31.81 $47.03 $62.24
2nd 6 months $33.66 $49.80 $65.94
3rd 6 months $48.86 $72.60 $96.34
4th 6 months $50.70 $75.36 $100.02
5th 6 months $52.55 $78.14 $103.72
6th 6 months $54.40 $80.91 $107.42
7th 6 months $56.24 $83.67 $111.10
8th 6 months $58.09 $86.44 $114.80
9th 6 months $59.94 $89.22 $118.50 make up day allowed
Roofer
X X X X X X X D$41.46 $53.86 $66.26
RO-149-UP
Commercial Roofer Y
1/19/2022
Apprentice Rates:
Apprentice 1 $31.62 $39.59 $47.56
Apprentice 2 $33.03 $41.66 $50.29
Apprentice 3 $34.39 $43.66 $52.92
Apprentice 4 $35.76 $45.67 $55.58
Apprentice 5 $37.12 $47.67 $58.21
Apprentice 6 $37.92 $48.82 $59.72 make up day allowed
Requestor: Sanders & Czapski Associates, PLLC
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Sewer Relining
H H H H H H H D$49.71 $67.42 $85.13
SR-I
Class I-Operator of audio visual CCTV system including remote in-ground cutter and other equipment used in conjunction with CCTV system.
N
12/10/2021
Apprentice Rates:
0-6 months $39.05 $51.43 $63.81
6-12 months $42.83 $57.10 $71.37
H H H H H H H D$47.67 $64.36 $81.05
SR-II
Class II-Operator of hot water heaters and circulation system; water jetters; and vacuum and mechanical debris removal systems and those assisting.
Sheet Metal Worker
H H H H D D D D$61.69 $77.49 $93.28 shm-7-5
Sheet Metal Worker 4 10s allowed as consecutive days, M-Th Y
1/14/2022
Apprentice Rates:
1st 6 months $35.94 $43.84 $51.74
2nd 6 months $35.94 $43.84 $51.74
3rd 6 months $38.25 $46.94 $55.62
4th 6 months $40.57 $50.04 $59.52
5th 6 months $42.90 $53.17 $63.43
6th 6 months $45.23 $56.28 $67.34
7th 6 months $47.55 $59.40 $71.24
8th 6 months $49.88 $62.51 $75.15
A make up day may be worked due to inclement weather, the make up hours shall be paid at the regular hourly rate of pay.
make up day allowedcomment
Requestor: Sanders & Czapski Associates, PLLC
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
Sprinkler Fitter
H H H H H H H D$60.34 $78.45 $96.56
SP 669
Sprinkler Fitter Y
11/16/2021
Apprentice Rates:
Class 1 $24.57 $32.72 $40.87
Class 2 $26.38 $35.43 $44.49
Class 3 $39.14 $49.10 $59.06
Class 4 $40.95 $51.82 $62.68
Class 5 $43.01 $54.78 $66.55
Class 6 $44.82 $57.49 $70.17
Class 7 $46.63 $60.21 $73.79
Class 8 $48.45 $62.94 $77.43
Class 9 $50.26 $65.65 $81.05
Class 10 $52.07 $68.37 $84.67 make up day allowed
Tile, Terrazzo and Mosaic Finisher
H H H H H H H D$42.34 $54.17 $65.99
BR2-TF
Tile, Terrazzo and Mosaic Finisher N
12/3/2021
Apprentice Rates:
1st Period $35.25 $43.53 $51.81
2nd Period $36.43 $45.30 $54.17
3rd Period $37.61 $47.07 $56.53
4th Period $38.79 $48.84 $58.89
5th Period $39.97 $50.61 $61.25
6th Period $41.16 $52.39 $63.63
Truck Driver
H H H H H H H H$44.10 $48.81
TM-RB2
of all trucks of 8 cubic yd capacity or over Y
1/12/2022
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .
Time and a Half
Double Time
Contract must be awarded by: 7/10/2022
Issue Date: 4/11/2022
Name
Classification Overtime ProvisionDescription
Official Commercial Prevailing Wage Rates for State Funded Projects
Last Updated
H H H H H H H H$44.00 $48.66
TM-RB2A
of all trucks of 8 cubic yard capacity or less (except dump trucks of 8 cubic yard capacity or over, tandem axle trucks, transit mix and semis, euclid type equipment, double bottoms and low boys)
6/7/2016
H H H H H H H H$44.25 $49.04
TM-RB2B
on euclid type equipment Y
6/7/2016
Project Description: Phase 3 Improvements - F.J. McLain State Park
HoughtonCounty:
32 Official Request #:
Project Number: 751/16043.JBB
Official Rate Schedule Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe b e n e f i t r a t e s p r e s c r i b e d i n a c o n t r a c t .