Addendum 2 16043.pdf

PDF 505 KB Posted

Attached to
751/16043. JBB; F. J. McLain State Park - Phase 3 Improvement
Solicitation number
RFQ 171 220000000304 3
Issued by
Houghton County, Michigan

About this file

This Addendum #2, issued May 5, 2022, by Sanders & Czapski Associates, PLLC on behalf of the Michigan Department of Natural Resources, provides clarifications and revisions to the contract documents for Phase 3 Improvements at F.J. McLain State Park located at 18530 M-203 in Hancock, Michigan. The addendum adds Section 12 35 30 (Casework) specifications in their entirety and clarifies electrical panel requirements and installation methods for the Mini-Cabins. Specifically, electrical panels manufactured by Square D are specified with equal products from Eaton and Cutler Hammer permitted and subject to approval during the submittal process. New outlets in the Mini-Cabins must be flush-mounted with concealed wiring routed through wall cavities and crawl spaces without damage to existing surfaces, while new service panels and conduit may be surface-mounted to exterior walls. The date, time, and location for receipt of bids remain unchanged by this addendum, and bidders must acknowledge receipt on the Bid Form.

The casework specifications establish requirements for manufactured base and wall cabinets complying with Kitchen Cabinet Manufacturers Association (KCMA) A161.1 standards and bearing the KCMA "Certified Cabinet" seal. Acceptable manufacturers include KraftMaid Cabinets, Thomasville Cabinetry, and Merillat Cabinets, with specifications requiring flush overlay style, face frame construction, wood stiles and rails with raised panels, decorative full-surface hinges, and wire pulls. Cabinets must be manufactured for commercial use with a finished counter height of 34 inches maximum above finished floor. Installation requirements mandate conditioning cabinets to prevailing humidity conditions, installation with concealed shims to maintain flush surfaces, level and plumb tolerance of 1/8 inch in 8 feet, and fastening to structural members using No. 10 wafer-head screws with 1-inch penetration or toggle bolts as appropriate. All work must comply with the State of Michigan 2015 Building Code Chapter 11 for accessibility requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SANDERS & CZAPSKI ASSOCIATES, PLLC

ARCHITECTURE / LANDSCAPE ARCHITECTURE / HISTORIC PRESERVATION

109 South Front Street / Suite 210 / Marquette, MI 49855

Phone: 906 – 273 - 1207

Phase 3 Improvements

F.J. McLain State Park

ADDENDUM #2

May 5, 2022

Project: Phase 3 Improvements – F.J. McLain State Park Department of Natural Resources

18530 M-203 Hancock, Michigan 49930

File No: 751/16043.JBB Index No: 51240 Agency: Department of Natural Resources

Issued by: Sanders & Czapski Associates, PLLC 109 S. Front St., Suite 210 Marquette, Michigan 49855

Date: May 5, 2022

Notice to Bidders:

This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and previously issued Addenda. Portions of the Addendum affecting the Contract Documents will be incorporated into the Contract by enumeration of the Addendum in the Owner/Contractor Agreement.

The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form(s)

The date, time and location for receipt of bids is unchanged by this Addendum.

Attachments to this Addendum:

This Addendum includes the following attached Documents.

o Section 12 35 30 – Casework

The Specifications:

A. Section 12 35 30 – Casework

1. Add: Section 12 35 30 – Casework in its entirety, included as an attachment to this addendum.

The Drawings:

A. Sheet E1 / E2 – Electrical Plans

Clarify: Electrical panels are specified as manufactured by Square D, equal products manufactured by Eaton and Cutler Hammer are also allowed and will be reviewed for approval as part of the submittal process.

Clarify: New outlets in the Mini-Cabins are to be flush mounted, with concealed wiring feeding new and existing outlets and heaters. The expectation is that wiring be fished through wall cavities, crawl spaces etcetera, without damage to existing wall paneling and other surfaces. New Mini-cabin service panels and conduit may be surface mounted to exterior wall with surface conduit feeding the panel and from the panel to the new crawl space.

END OF ADDENDUM #2

Phase 3 Improvements - F.J. McLain State Park File No. 751/16043.JBB Index No. 51240

Addendum #2 – May 5, 2022

CASEWORK 12 35 30 - 1

SECTION 12 35 30

CASEWORK

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section includes manufactured base and wall cabinets and related accessories.

1.2 RELATED WORK

A. 06 10 00 Rough Carpentry

B. 06 20 00 Finish Carpentry

C. 09 29 00 Gypsum Board

1.3 REFERENCES AND REGULATORY REQUIREMENTS

A. Appropriate references included in 01 10 90 References.

B. State of Michigan 2015 Building Code, Chapter 11 “Accessibility” for barrier free accessibility requirements.

C. Wood Moulding and Millwork Producers Association (WMMPA).

D. Architectural Woodwork Institute (AWI).

E. Woodwork Institute (WI).

F. Kitchen Cabinet Manufacturers Association (KCMA).

1.4 SUBMITTAL REQUIREMENTS

A. Shop drawings showing plans and details, product data and samples. Manufacturer’s standard materials, colors and finishes.

1.5 QUALITY ASSURANCE

A. In accordance with 01 40 00 Quality Requirements.

1.6 DELIVERY, STORAGE AND HANDLING

A. All material shall be delivered in manufacture’s cartons, properly handled and properly stored until ready for installation.

Phase 3 Improvements - F.J. McLain State Park File No. 751/16043.JBB Index No. 51240

CASEWORK 12 35 30 - 2

B. Environmental Limitations: Do not deliver or install cabinets until building is enclosed, wet work is complete and HVAC system is operating.

PART 2 - PRODUCTS

2.1 CABINETS

A. Comply with KCMA A161.1.

1. Provide cabinets with KCMA's "Certified Cabinet" seal affixed in a semi-exposed location of each unit.

B. Kitchen Cabinets:

1. Manufacturers:

a. KraftMaid Cabinets.

b. Thomasville Cabinetry

c. Merillat Cabinets

2. Face Style: Flush overlay.

3. Cabinet Style: Face frame.

4. Door and Drawer Fronts: Wood stiles and rails, with raised wood center panels.

5. Face Frame Finish: Wood.

6. Exposed Cabinet End Finish: Wood.

7. Exposed Wood: white clear solid wood or hardwood plywood with Grade A faces per

HPVA HP-1, selected for compatible color and grain.

8. Semiexposed Materials: Solid wood or hardwood plywood with Grade C faces per

HPVA HP-1, stained to match faces.

9. Door and Drawer Pulls: Wire pulls.

10. Hinges: Decorative full-surface hinges.

11. Drawer Guides: Epoxy-coated-metal, self-closing drawer guides with nylon-tired, ball-bearing rollers.

C. Dimensions. All cabinets shall be manufactured for commercial use application requiring a finished counter height of 2’-10” (34 inches) maximum above the finished floor.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Before installation, condition cabinets to average prevailing humidity conditions in installation areas.

B. Install cabinets with no variations in flushness of adjoining surfaces by using concealed shims.

Where casework abuts other finished work, scribe and cut for accurate fit. Provide filler strips, scribe strips, and moldings in finish to match casework face.

Phase 3 Improvements - F.J. McLain State Park File No. 751/16043.JBB Index No. 51240

CASEWORK 12 35 30 - 3

C. Install cabinets without distortion so doors and drawers fit openings properly and are aligned.

D. Install level and plumb to a tolerance of 1/8 inch in 8 feet.

E. Fasten each cabinet to adjacent unit and to structural members of wall construction. Fasten wall cabinets through back, near top and bottom, at ends and not less than 24 inches o.c.

1. Use No. 10 wafer-head screws sized for 1-inch penetration into wood framing, blocking, or hanging strips.

2. Use toggle bolts through metal backing behind gypsum board.

F. Adjust all hardware to provide unencumbered operation.

G. Coordinate installation of countertop.

H. Clean dirt and debris off of all cabinet surfaces. Touch up any surfaces damaged during installation.

END OF SECTION 12 35 30