Preliminary Results~21.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- Port Orford MS Storage Bldg 07 improvements
- Solicitation number
- S-73000-00004564
- Issued by
- Crook County, Prospect CDP, Oregon
About this file
The document provided is a Preliminary Results spreadsheet for a state and local contract opportunity related to the Port Orford MS Storage Bldg 07 improvements project in Oregon. The project is overseen by Douglas County and consists of a base bid for all the required work, as well as two additive alternates for the installation of overhead sectional doors and bollards. The base bid and alternates were submitted by two contractors, Vitus Construction and Farrar Construction, with their respective unit prices and total prices. The total bid amounts for the base bid plus alternates are $223,800.00 for Vitus Construction and $258,245.00 for Farrar Construction.
The pricing terms, set asides, funding requirements, and other salient information are not provided in the given document. However, the document indicates that this is a preliminary result, suggesting that the contract award has not been finalized.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| How to attach a file in OregonBuys for a Bid-Quote~5.docx | DOCX document | |
| RFP 22-031 Legislative Advocacy Services - Notice Of Intent To Award 11-29-22.pdf | ||
| ATT B Specifications~2.pdf | ||
| ATT C - Bid Pricing Submittal Form~1.xlsx | XLSX spreadsheet | |
| OregonBuys Vendor Solicitation Response~52.pdf | ||
| 35454 Port Orford ITB.docm | DOCM document | |
| ATT A Plans~2.pdf | ||
| Oct 25 2022 PreBid Meeting Minutes.docx | DOCX document | |
| Pre-Bid Sign In Sheet OCT 25 2022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Preliminary Results Bid S-73000-00004564 Port Orford MS Storage Bldg 07 improvements | |||||||
| November 14, 2022 | |||||||
| Contractor | Vitus Construction | Farrar Construction | |||||
| Bid Item | Description | ||||||
| Est. Qty | Unit | Unit Price | Total Price | Unit Price | Total Price | ||
| 1 | BASE BID (All work excluding additive alternates) | 1 | LS | $159,500.00 | $159,500.00 | $184,680.00 | $184,680.00 |
| 2 | Additive Alternate #1 - Installation of 5 Overhead Sectional Doors Including, Tracks, Operators and Controls | 1 | LS | $46,000.00 | $46,000.00 | $49,000.00 | $49,000.00 |
| 3 | Additive Alternate #2 - Installation of 10 Bollards including Foundations, Saw Cut and Removal of Asphalt Pavement, and Installtion of New Concrete Apron. | 1 | LS | $18,300.00 | $18,300.00 | $24,565.00 | $24,565.00 |
| Total Base Bid + Alternates | $223,800.00 | $258,245.00 |
Sheet2
| EST. | UNIT | TOTAL | |||
| ITEM | DESCRIPTION | QTY. | UNIT | PRICE | PRICE |
| 1 | |||||
| 2 | |||||
| 3 | |||||
| 4 | |||||
| 5 | |||||
| 6 | |||||
| 7 | |||||
| 8 | |||||
| 9 | |||||
| 10 | |||||
| TOTAL BID AMOUNT |