Oct 25 2022 PreBid Meeting Minutes.docx
DOCX document 85 KB Posted
- Attached to
- Port Orford MS Storage Bldg 07 improvements
- Solicitation number
- S-73000-00004564
- Issued by
- Crook County, Prospect CDP, Oregon
About this file
This document is the pre-bid meeting minutes for a construction project to improve the Port Orford Maintenance Station Storage Building in Port Orford, Oregon. The project is managed by the Oregon Department of Transportation (ODOT) and involves the demolition and replacement of existing building components including roofing, siding, gutters, and the installation of a man-door. Two alternates are also included: the installation of 5 overhead sectional doors, and the installation of 10 bollards. The bids for this state-funded project are due on November 14, 2022, and the contract is expected to be awarded approximately one week later, with a substantial completion date of February 2, 2023 and a final completion date of February 16, 2023. The project is located in Douglas County, Oregon.
The document outlines the bidding requirements, including access to bid documents through OregonBuys.gov, the requirement for bid, performance, and payment bonds, and the requirement for a $30,000 Public Works Bond for the general contractor and subcontractors. Substitution requests must be submitted by qualified prime contractors at least 7 days prior to the bid date. Liquidated damages of $1,250 per calendar day will be assessed if the substantial completion date is not met. Progress payments will be made monthly, and the general contractor is responsible for obtaining all necessary permits and inspections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATT B Specifications~2.pdf | ||
| ATT C - Bid Pricing Submittal Form~1.xlsx | XLSX spreadsheet | |
| OregonBuys Vendor Solicitation Response~52.pdf | ||
| How to attach a file in OregonBuys for a Bid-Quote~5.docx | DOCX document | |
| Preliminary Results~21.xlsx | XLSX spreadsheet | |
| RFP 22-031 Legislative Advocacy Services - Notice Of Intent To Award 11-29-22.pdf | ||
| 35454 Port Orford ITB.docm | DOCM document | |
| ATT A Plans~2.pdf | ||
| Pre-Bid Sign In Sheet OCT 25 2022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
POMSPB10252022
Construction Project
Pre Bid Meeting Agenda Speaking Pts.
Project Name: Port Orford Maintenance Station Storage Building Improvements Meeting Location: 1219 Arizona St., Port Orford, OR 97465 Meeting Date and Time: Tuesday, October 25, 2022, 11:00 AM ITB Number: #S-73000-00004564
1. Introductions of the Agency Team (Steve Gennett)
| Construction Project Manager | Steve Gennett | ||
| Sr. Construction Project Manager | Raymond Cooper | ||
| Procurement | Terri Sinclair-Olson | ||
| Structural Engineer | Jon Doughton | ||
| ODOT TMM | Scott Mickelson |
2. Sign-In Sheet (Steve Gennett)
A. Point out sign-in sheet location and need to sign-in.
B. Sign-in Sheet will be posted after the meeting on OregonBuys.gov.gov
3. Project Overview (Steve Gennett)
A. Please hold your questions until the ODOT Agency Team has completed our portion of the presentation.
B. Project Overview
i. State of Oregon General Condition for Public Improvement Contracts will be referenced as General Conditions.
ii. Because of safety concerns this is the only time this morning that you will be given the chance to be on-site.
iii. Project bids will close November 14, 2022 2:00 PM with contract award taking place approximately one week later.
4. Project Background (Jon Doughton)
Base bid: Port Orford Storage Building Improvements including demolition and replacement of existing building components including roofing, siding, gutters, and installing man-door on north end of building.
New electrical work is not included in contract. Demolition of existing electrical components is included in base contract.
Alternate 1: Installation of 5 overhead sectional doors including tracks, operators, and controls.
Alternate 2: Installation of 10 bollards including foundations, saw cut, and removal of asphalt pavement, and installation of new concrete apron.
5. Bidding Requirements (Raymond Cooper)
A. Terri is the single point of contact during Bidding thru Notice to Proceed.
B. How to access bid documents. Access documents through OregonBuys.gov.gov
C. Define Bid items:
Base Bid:
Alternate 1 Alternate 2
D. Bids close on November 14, 2022.
E. This is a State funded project, BOLI Rates apply.
F. Bid, Performance, and Payment Bonds are Required.
G. General Contractor and Sub-Contractors are required to have a $30,000 Public Works Bond.
H. Substitution requests will follow the process as described in the project specifications. (Section 01 25 00). Substitution requests will only be considered if submitted by a qualified Prime Contractor, submitted using the substitution request form and submitted at least 7 days prior to the bid date.
I. Only General Contractors will be allowed to submit substitution requests (Bidders).
J. Any statements made during the pre-bid will not change the plans, specifications, or contract documents unless an addendum is issued by the ODOT contract administrator.
K. Communication during Bid Phase. All questions and substitution requests must be submitted to the Single Point of Contact. Questions and requests must be submitted via email for quick and efficient dissemination of information.
L. Responsive bids and Responsible Bidder. Bids submitted through OregonBuys.gov.
M. Other Addenda and updates will be issued through OregonBuys.gov.
N. Sign in Sheet will be posted on OregonBuys.gov after the meeting by OPO O. Bid Phase Questions: Questions and answers will be posted to OregonBuys.gov.
P. Other
6. Contract Administration: (Steve Gennett) A. General Contractor will have superintendent on site at all times.
B. (General Conditions section B.6). Superintendent and any changes to the Superintendent must be approved by ODOT.
C. The site will continue to be used by ODOT crews during the project.
D. Contractor will provide their own toilet facilities, job trailer, phone, communications, electrical power, water, etc.
E. General Contractor or Sub-Contractors will not be allowed to camp on-site.
F. Liquidated damages of $1,250.00 per calendar day will be assessed if substantial completion is not met on February 2, 2023. If your means and methods result in a stop order, the substantial completion date will not be extended.
G. Substantial Completion date is February 2, 2023.
H. The final completion date is February 16, 2023.
I. ODOT does not pre-pay for any material or work.
J. General application for payment will be accepted only for materials that have been installed.
K. Contractor will provide a schedule of values to the CPM (General Conditions section E.1)
L. Progress payments will be made monthly. (General Conditions E.2)
M. Contractor will provide a Project Schedule to the CPM.
N. ONE CALL is required (811 “Call Before You Dig”). Private Locate will be required as needed. Contractor will pay all fees associated with Location services.
O. General Contractor and Specialty Contractors are required to purchase permits and call for the JHA for inspections. General Building Permit it ready for issue. General Contractor will pay for the General Building Permit. Specialty permits must be procured and paid for by applicable subcontractors.
P. All project directions will come from the ODOT CPM.
7. Questions (Steve Gennett, Agency Team)
PORT ORFORD MS STORAGE BUILDING PRE-BID QUESTIONS
1.1 Are there known cultural or archeological issues at this site?
ODOT Construction Project Manager (CPM) will confer with Region 3 Environmental Section for confirmation, but no cultural or archeological issues are anticipated.
1.2 Where is the staging area?
This is an active ODOT Maintenance Station whose operations will continue during construction, but ample staging space is available. Coordinate with the ODOT CPM or Transportation Maintenance Manager (TMM) as needed.
1.3 Submittals?
If you intend to bid on the job, you are encouraged to have as many submittals as possible completed prior to the preconstruction meeting.
1.4 Lockset on man door ?
Provided by ODOT. Anticipate a 626 Schlage.
1.5 Framing hidden by metal?
Some framing is hidden by sheet metal and cannot be examined for soundness. For this reason, an allowance has been made for replacement of up to 10 wall girts as part of the base bid. Any required work beyond the base bid scope will be additional work.
1.6 Standing seam vs. exposed fasteners?
Specifications call for standing seam metal roofing with hidden fasteners, not exposed fasteners.
1.7 Color?
Color selected by CPM from roofing manufacturer’s standard color samples at direction of TMM. Anticipate forest green to match color scheme of existing buildings.
8. Meeting adjournment/Close out (Steve Gennett)
Thank you for participating.
Facilities Construction Projects POMSPB10252022 Page 1 Pre Bid Meeting Agenda 10.25.2022 \\scdata2\Facilities_admin\ProjectsInProgress\Region3\21-23 Biennium\F4080401 Port Orford MS Pole Building Repair\08-Communications\Meeting Agenda\10.25.2022 Pre-Bid Agenda (spg10.31.2022final).docx image1.jpeg image10.jpeg