This is a Bidding Documents Notice from the Iowa Department of Administrative Services for tuckpointing and masonry repairs at the Cherokee Mental Health Institute in Cherokee, Iowa, under RFB #951300-01. The procurement encompasses exterior masonry restoration work including removal of deteriorated mortar joints, repointing of masonry joints, brick and stone repairs, stone sill replacement, steel lintel repointing, expansion joint sealant replacement, window flashing and trim replacement, and application of penetrating water repellent to masonry surfaces. The project is divided into two bid packages: Option #1 covers the Administration, Rear Center, North A/B/C, and South A/B/C buildings, while Option #2 addresses the Voldeng Building, with bidders permitted to submit proposals for either or both packages. Three unit price items are available for additional tuckpointing work, tuckpointing with deep joint repairs, and brick replacement. Bidding documents are available from Rapids Reproduction beginning April 16, 2026. Mandatory pre-bid meetings are scheduled for April 23-24, 2026, at 10:30 AM at the Cherokee Mental Health Institute's Main Admin Building. Written questions and substitute product requests must be submitted by 2:00 PM on April 28, 2026, to Issuing Officer Michael Bradbury. Sealed bids must be submitted electronically through the State's IMPACS Electronic Procurement System no later than 2:00 PM on Monday, May 4, 2026, with bid opening at 3:00 PM via Google Meet teleconference. Construction is anticipated to commence in August 2026 with substantial completion targeted for November 25, 2026.
Qualified bidders must be registered construction contractors with the Iowa Labor Commissioner, demonstrate compliance with Iowa State Building Code standards, possess an established place of business in Iowa if claiming resident bidder status, and comply with all federal and state affirmative action and equal employment opportunity requirements. All bids must remain valid for thirty calendar days following the submission deadline. Bid security equal to five percent of the total bid amount must accompany each submission in the form of a bid bond, certified check, or cashier's check. Performance and payment bonds, proof of insurance coverage, and background checks for all on-site employees are required prior to contract execution. All subcontractors and suppliers must be identified within forty-eight hours of the bid submission date and cannot be replaced without owner approval. Payment applications will be processed with three percent retainage, and the closeout paperwork line item must represent no less than one percent of the contract value or $1,000, whichever is greater. No specific budget range or award value is disclosed in the procurement documents; the award will be made to the lowest responsible bidder whose submission complies with all bidding requirements. The Iowa Sales Tax does not apply to this project, and Davis Bacon Wages requirements do not apply. Additional information may be obtained by contacting Michael Bradbury at (515) 823-9327 or construction.procurement@iowa.gov.
Text of this file
Skip to content
X-twitter
Youtube
Upload Files
Main Menu
Request a Service Call
Blog
Digital PlanRoom
Resources
Overview
My Supply Lists
Open Positions
Credit Application
Document Size Chart
Adobe Acrobat Reader
Foxit PDF Reader
Contact Us
Need Assistance?
Call us 319-364-2473 or Contact Us via form.
Upload Files
Search ...
Results
See all results
Search ...
Results
See all results
Account
Quotes
$0.00
| 0 | |
| Cart |
Shop Online
$0.00
| 0 | |
| Cart |
Main Menu
What We Do
Technical Document Printing & Marketing
Overview
Technical Documents Printing Quote
Marketing Materials
Overview
Business Cards
Mailing Services
Forms / Invoices
Folders
Letterheads & Envelopes
Signs
Overview
Yard Signs
Site Signs
Safety Signs
Banners
Banner Stands
Banner Stands / A-Frame Signs
Wall Decals & Window Graphics
Overview
Wall Decals
Window Graphics
Equipment Sales
Overview
Wide Format Printers / Scanners
Printer Repairs
Equipment Supplies
Ink & Toner
Paper & Media
Parts
Vehicle Graphics
Overview
Full Wrap Vehicle Graphics
Partial Wrap / Decals
3D Printing & Additive Manufacturing Services
Overview
3D Printing Quote
Environmental Graphic Design
Overview
Environmental Graphic Design Quote
Scanning & Archiving
Overview
Scanning / Archiving Quote
Technical Document Printing & Marketing
Overview
Technical Documents Print Quote
Marketing Materials
Overview
Business Cards
Mailing Services
Stationary / Invoices
Folders
Envelopes
Signs
Overview
Yard Signs
Site Signs
Safety Signs
Banners
Banner Stands
Banner Stands / A-Frame Signs
Parking Signs
Sign Blanks
Wall Decals & Window Graphics
Overview
Wall Decals
Window Graphics
Equipment Sales
Overview
Wide Format Printers / Scanners
Printer Repairs
Vehicle Graphics
Overview
Full Wrap Vehicle Graphics
Partial Wrap / Small Signs
3D Printing & Additive Manufacturing Services
Overview
3D Printing Quote
Environmental Graphic Design
Overview
Environmental Design Quote
Scanning & Archiving
Overview
Scanning / Archiving Quote
Custom Gifts
Overview
Lifesize Standees
Custom Heart Yard Signs
Custom Puzzles
On-site Data Vault
Overview
On-site Data Vault
Who We Serve
Architects
Learn More
K-12 Education
Learn More
Engineers
Learn More
Higher Education
Learn More
Manufacturing
Learn More
Municipalities
Learn More
Events & Venues Hospitality
Learn More
Legal Teams
Learn More
Commercial & Non-Profit
Learn More
Construction
Learn More
Real Estate
Learn More
| Who We Are |
| Our History |
| Leadership |
| Capabilities |
Where We Are
Cedar Rapids
Cedar Falls
Clive
Davenport
Dubuque
Iowa City
Shop Online
Need Assistance?
Call us at 319-364-2473 or Contact Us via online form.
Enhance any facility with eye-catching custom graphics!
Rapids Reproductions has a team in place to help you with any project from concept to installation.
Shop Products & Services
You can always count on Rapids Reproductions.
Set the mood for your team or work environment with wall graphics
View Wall Decals
Our Product Expertise
Signage
Yard Signs, Banner Stands, Athletic Signs
Learn More
Prints
Photography & Canvas
Learn More
Marketing Materials
Brochures, Flyers, Mailers, & Presentations
Learn More
Vehicle Graphics
Wraps, decals, etc.
Learn More
Technical Document Printing & Marketing
Technical Documents, Blueprints, etc.
Learn More
3D Printing & Additive Manufacturing
3D Printing, Design, Prototyping, Casting
Learn More
Environmental Graphic Design
Wall Art, Banners, Signage
Learn More
Wall Decals & Window Graphics
Decals, Window Graphics, etc.
Learn More
Scanning & Archiving
Scan & Reprint Old Documents
Learn More
Looking for your next wideformat printer?
Rapids Reproductions is an authorized service dealer for Hewlett-Packard wide format printers and Pagewide XL technology.  Rapids Reproductions has been a loyal HP partner for over 30 years.
View Printer Products
Work with Rapids Reproductions
Ready To Start A Project?
View Products & Services
Get In Touch
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Request a Quote Tell us about your project and its application.
Internal Review We will review your information and respond with any questions.
Receive Quote You will receive a quote from us within 3 business days.
Design Once a quote has been approved we will begin setting up the proof of your project.
Printing Upon approval of the proof your project will be printed.
Project Hand Off Your project can either be installed, delivered, or picked up at a store location near you.
There's No Limit To What We Do.
At Rapids Reproductions, we are a top supplier of wide-format products and services to help Architects, Engineers, Manufacturers, Surveyors, and Graphic Artists. We are always working to expand our services to better meet our clients’ needs. By investing in the latest technology we can provide our customers with the best printing solutions, from blueprints to 3D prints to custom-shaped signs, and much more.
Learn More About Rapids
Hear What Our Customers Have To Say
Kelly TheisenCustomer
The staff is friendly and knowledgeable of their services. I always get a response back from them in a timely manner. We are pleased with the documents that they produce and the timely matter that they are sent out.
Harriet DuwaPurchasing Manager
We are very satisfied here at Build to Suit with Rapids Reproductions! You guys are fast and very friendly to work with!! We appreciate that! It doesn�t matter if I send something to the Iowa City office or Cedar Rapids office, you and Grady are very helpful and always let me know when my prints are ready!!
MikeArtist
I picked up my prints yesterday and wanted to let you know that they turned out very well. I was very pleased with the results, and am happy to have a local source for having my art printing done.
Thanks for your help!
Tony BrownMusicians, Songwriter, Artist, Music Producer @ Tony Brown Music, Honor w/No Fat Publishing, & Living Nation
I am a pretty particular person about who I allow to do my graphic printing and reproductions. Usually if someone messes up one time, that's too many times for me. I try to work with people who take what I give them and my ideas and make me go "Wow!" when i come in to proof or pick up my projects. All I can say about Technigraphics is that they take all my worries out of getting the job done. They not only get it done expeditiously but the quality of workmanship is beyond most of the places I have worked with in the Iowa City area. I recommend them to anyone who contacts me and needs to get any kind of printing or promotional materials done.
Michelle StumpMarketing Director @ Carl A. Nelson & Company
I simply wouldn�t trust my designs with any other business. Rapids Reproductions produces high-quality products every time from publications and brochures to banners and artwork. Their customer service is first rate.
Barbara VinogradeFree Medical Clinic, Iowa City
Our organization has worked with Rapids Reproductions for many years, and we will continue to ask for their assistance. Their staff could not be more efficient. Their work is beautifully done. I would recommend their services to anyone, without reservation.
Tom HempelWatercolor Artist
My first contact with Rapids Reproductions was about in 2012 when I was driving around looking for a company to print me a poster for an upcoming art show. They helped me pick out one of my paintings, select a size that would be seen from the street, and put it on a foam board. The show was a huge success, which has developed into several shows every year.
Nick Hoover, my printer, has developed a remarkable partnership with my work. After a short time he was reproducing my prints as good if not better than the originals. I sometimes cannot tell them apart. Keep up the good work.
Rachel MansonMechanical Engineer @ Crystal Group
I received the 3D prints this morning. Thank you for having them dropped off and for getting them done so quickly. I really appreciate it. They work great!
Lindsey FlanneryMarketing and Development Manager @ Indian Creek Nature Center
I just wanted to take a moment to say THANK YOU for your amazing work on the bee exhibit! Our staff (and already many visitors) are SO impressed with how this turned out. Matt, thank you for fixing the background to make it meet nicely along the edges � I struggled hard with that and you made it look perfect, with no mirror effect. Dan, the install looks fantastic too.
Thanks again for your work on this � it makes our jobs so much easier to have a great vendor like Rapids on our side.
Services
Technical Document Printing & Marketing
Marketing Materials
Signs
Wall Decals / Window Graphics
Vehicle Graphics
Equipment Sales
3D Printing / Additive Manufacturing
Environmental Graphic Design
Scanning / Archiving
Onsite Data Vaults
Industries
Architects
Engineers
Manufacturing
Events & Venues Hospitality
Commercial & Non-Profit
K-12 Education
Higher Education
Municipalities
Legal Teams
Real Estate (Docket Portal)
Construction
About
Our History
Leadership
Capabilities
Blog
Resources
Locations
Cedar Rapids
Cedar Falls
Clive
Davenport
Dubuque
Iowa City
Shop Online
Contact Us
Follow us on our socials!
Youtube
Tiktok
Privacy Policy
Terms & Conditions
Privacy Policy
Terms & Conditions
© 2026 Rapids Reproduction, Inc. All Rights Reserved.
© 2026 Rapids Reproduction, Inc.
All Rights Reserved.
Website Maintained by Running Robots
Uploaded
Failed
Terms and Conditions - Privacy Policy
Other files
| File | Type | Posted |
|---|---|---|
| RFB951300-01 - Notice to Bidders.pdf | ||
| RFB951300-01 - Drawings.pdf | ||
| RFB951300-01 - Project Manual.pdf | ||
| RFB951300-01 - Bid Form.pdf | ||
| RFB951300-01 - Addendum #01.pdf | ||
| A-201 North and South Elevations.html | HTML file | |
| ConsensusDocs 260 Performance Bond.html | HTML file | |
| ConsensusDocs 261 Payment Bond.html | HTML file | |
| A-101 Overall Plan.html | HTML file | |
| ConsensusDocs 802 Sample Agreement Form.html | HTML file | |
| A-202 East and West Elevations.html | HTML file | |
| HHS CHMHI Tuckpointing Phase 2.2 - Drawings | — | |
| 1383505-event.pdf | ||
| G-001 Cover Sheet.html | HTML file | |
| A-530 Details.html | HTML file | |
| ConsensusDocs 262 Bid Bond.html | HTML file | |
| RFB 951300-01 Project Manual.html | HTML file |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .