Preliminary Bid Results – Boone Bridge Northbound Joint Replacement
This is a preliminary bid tabulation for the Oregon Department of Transportation's Boone Bridge Northbound Joint Replacement project, ITB No. S-73000-00018174, located on Interstate 5 over the Willamette River at milepost 283.11 in Clackamas County. The project scope includes constructing temporary and permanent bridge joints, premixed polymer concrete overlay, pavement markings, temporary work access and containment, pressure washing, and related incidental work. The bid tabulation presents 20 line items covering mobilization, traffic control, barrier installation, containment plans, bridge removal, polymer concrete preparation and installation, joint seals, gland replacement, modular joint systems, and surface treatments. Bids closed on November 10, 2026, at 2:00 p.m. The project has a substantial completion deadline of September 1, 2027, with final completion required by September 15, 2027.
Two bids were received for this project: Wildish Standard Paving Co. submitted a total bid of $2,157,521.30, while HP Civil Inc. submitted $2,714,785.24. The project is estimated between $2.0 million and $2.5 million for bonding purposes and is funded through state funds. Award will be made to the responsible bidder submitting the lowest responsive bid. Bidders must hold an Oregon Construction Contractors Board license and obtain a Public Works bond prior to commencing work. Performance and payment bonds equal to 100% of the contract amount, along with $2,000,000 per occurrence and $5,000,000 aggregate general liability insurance and $1,000,000 combined single limit auto liability insurance, are required. Bid security equals 10% of the total bid. ODOT retains 5% of payments, with liquidated damages set at $1,707.00 per calendar day beyond substantial completion and $2,000.00 per 15-minute interval per lane for unauthorized lane closures. Prevailing wage rates follow BOLI Region 2 for Clackamas County, effective October 5, 2026. All steel, iron, coatings, and specified manufactured products must be produced in the United States, with required certificates of materials origin.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 11/10/26 | ||||
| ITB No. | S-73000-00018174 | BIDDER | |||
| NAME: | Wildish Standard Paving Co. | HP Civil Inc. | |||
| Bid Closing: | November 10, 2026 2:00 pm | CITY/STATE: | |||
| Description: | Boone Bridge Northbound Joint Replacement | CCB#: | |||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | MOBILIZATION | 1 | LS | $ 215,000.00 | $ 215,000.00 | $ 271,451.24 | $ 271,451.24 |
| 2 | TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE | 1 | LS | $ 300,000.00 | $ 300,000.00 | $ 550,000.00 | $ 550,000.00 |
| 3 | MOBILE BARRIER | 30 | DAY | $ 0.01 | $ 0.30 | $ 1.00 | $ 30.00 |
| 4 | TEMPORARY WORK ACCESS AND CONTAINMENT | 1 | LS | $ 200,000.00 | $ 200,000.00 | $ 140,000.00 | $ 140,000.00 |
| 5 | POLLUTION CONTROL PLAN | 1 | LS | $ 1,000.00 | $ 1,000.00 | $ 500.00 | $ 500.00 |
| 6 | WORK CONTAINMENT PLAN | 1 | LS | $ 5,000.00 | $ 5,000.00 | $ 15,000.00 | $ 15,000.00 |
| 7 | BRIDGE REMOVAL WORK | 991 | SQFT | $ 100.00 | $ 99,125.00 | $ 46.00 | $ 45,597.50 |
| 8 | CLASS 2 PREPARATION | 25 | SQYD | $ 0.01 | $ 0.25 | $ 0.01 | $ 0.25 |
| 9 | PPC REMOVAL | 468 | SQYD | $ 25.00 | $ 11,703.25 | $ 55.00 | $ 25,747.15 |
| 10 | FURNISH PREMIXED POLYMER CONCRETE | 11 | CUYD | $ 2,000.00 | $ 22,756.00 | $ 4,600.00 | $ 52,338.80 |
| 11 | CONSTRUCT PPC OVERLAY | 468 | SQYD | $ 50.00 | $ 23,406.50 | $ 150.00 | $ 70,219.50 |
| 12 | PRECOMPRESSED FOAM SILICONE JOINT SEAL | 128 | FOOT | $ 175.00 | $ 22,470.00 | $ 62.00 | $ 7,960.80 |
| 13 | GLAND REPLACEMENT | 257 | FOOT | $ 200.00 | $ 51,360.00 | $ 50.00 | $ 12,840.00 |
| 14 | MODULAR BRIDGE JOINT SYSTEMS | 1 | LS | $ 850,000.00 | $ 850,000.00 | $ 1,100,000.00 | $ 1,100,000.00 |
| 15 | TEMPORARY JOINT SYSTEM | 1 | LS | $ 327,000.00 | $ 327,000.00 | $ 350,000.00 | $ 350,000.00 |
| 16 | PRESSURE WASHING | 1 | LS | $ 20,000.00 | $ 20,000.00 | $ 40,000.00 | $ 40,000.00 |
| 17 | COPE EXISTING STEEL | 16 | EACH | $ 100.00 | $ 1,600.00 | $ 950.00 | $ 15,200.00 |
| 18 | SUPPORT BAR REPAIR | 36 | EACH | $ 100.00 | $ 3,600.00 | $ 400.00 | $ 14,400.00 |
| 19 | MONO-DIRECTIONAL WHITE TYPE IAR MARKERS | 10 | EACH | $ 35.00 | $ 350.00 | $ 35.00 | $ 350.00 |
| 20 | METHYL METHACRYLATE, EXTRUDED, SURFACE, PROFILED | 210 | FOOT | $ 15.00 | $ 3,150.00 | $ 15.00 | $ 3,150.00 |
| $ 2,157,521.30 | $ 2,714,785.24 |