This is a Temporary Work Access and Containment (TWAC) submittal and design documentation for the Boone Bridge Northbound Joint Rehabilitation project (Structure No. 02254A), a bridge rehabilitation project over the Willamette River at Mile Post 283.11 on Interstate 5 in Oregon, coordinated by the Oregon Department of Transportation (ODOT). The submittal, dated June 15, 2026, includes stamped working drawings and structural calculations (Revision 4) prepared by VAK Construction Engineering Services, LLC for Lee Contractors. The project requires design of temporary work access and containment in accordance with AASHTO Guide Design Specifications for Bridge Temporary Works and Specification 00253. The design includes an access platform with wood scaffolding, handrails, and 6-mil reinforced plastic sheeting containment system to prevent debris from leaving the work area and to facilitate pressure washing operations. The TWAC design was reviewed and recommended for acceptance with comments by R1 Environmental, with field modifications anticipated to achieve watertight containment around existing obstacles such as utilities, stringers, work platforms, and steel girders. Region 1 Environmental requested inspection of the containment system prior to authorization of pressure washing activities.
The design utilizes Douglas Fir-Larch lumber with specified grades and sizing, including 2x4 and 4x4 members, 5/8-inch CDX plywood, Simpson Titen HD anchors with 3.5-inch embedment, and structural calculations based on NDS for Wood Construction and ACI 318 standards. Design loads include a live load of 25 pounds per square foot with a 5 percent lateral load factor. The submittal documentation comprises detailed plan views, elevation and section drawings, connection details, handrail specifications, and comprehensive structural calculations for all members including joists, carriers, posts, bracing, and plastic sheeting anchorage. The design accommodates field fitting of members around existing bridge structural elements, with maximum member spacings and configurations specified to maintain structural adequacy. All materials and fasteners are specified with detailed installation requirements, and the design calculations demonstrate that all structural elements meet allowable stress limits under the specified loading conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: June 15, 2026
To: Stephen Evans, Project Coordinator
Cc: Richard Smith, Resident Engineer
Randy Killen, Assistant Resident Engineer Stephen Burgess, R1 Bridge Lead Engineer
Paul Langdale, R1 Environmental Coordinator Project File: ProjectWise M23061
From: Paul Strauser, R4 Bridge Lead Engineer
Subject: (MBM26-033) NB Boone Bridge (I-5 Over Willamette River at MP 283.11 Joint Rehabilitation
Structure No. 02254A (Willamette River, Hwy 1 (Boone Bridge)) Stamped Working Drawings and Calcs - Rev 4 - BI #4 – Temporary Work Access and Containment
Stephen, Submittal reviewed with R1 Environmental and recommended to be Accepted with Comments, as follows:
Contract includes Specification 00253 Temporary Work Access and Containment (TWAC), which requires design according to the AASHTO Guide Design Specification for Bridge Temporary Works. VAK has listed the NDS for Wood Construction and ACI 318 as the design criteria. Request that Lee Contractors and VAK Construction Engineering Services ensure no revisions are required in the proposed design.
Agency perceives the plastic sheeting between the concrete backwall and the TWAC to be necessary. The concrete backwall, concrete walking surface, and plastic sheeting attached to the deck soffit on the steel span are perceived to be sufficient to prevent debris from leaving the work area. Edges at station left and right may likely require some field fitting to ensure appropriate containment is achieved.
The submittal does not completely convey requirements to achieve watertight containment around existing obstacles (utilities, stringers, work platforms, or up against existing steel girders). Field modifications are expected. Region 1 Environmental requests a chance to inspect the containment prior to authorizing any pressure washing. Sincerely, Paul Strauser 541.410.1428
Department of Transportation Bridge Engineering Section
355 Capitol Street NE, MS 11 Salem, Oregon 97301-3871
Paul Strauser (ODOT Bridge) ShopDrawing2018.xlsx
CHK'DSYM. REVISIONS BY DATE
Date: CHK'D By:Designer:Drawn By: Drawing Number:Scale: Rev.
VAK Construction Engineering Services, LLC 8285 SW Nimbus Avenue, Suite 104 Beaverton, Oregon 97008
503.718.5999 tel 503.718.5980 fax www.vakengineering.com
C A
D F
IL
E
:2
6A
R
D R
G S
.D W
G
LEE CONTRACTING
Boone Bridge
Access Scafolding Design Plan
CC 04/28/2026 BJHBJH AS NOTED 26-076A-01 30 Issued for Submittal CC 04/30/2026 BJH
1 Revised per Review CC 06/01/2026 BJH
2 Revised per Review CC 06/09/2026 BJH
3 Revised per Review CC 06/11/2026 BJH
Scale:
Plan 3/16" = 1'-0"
1. All member spacing's shown are maximums and may be reduced U.N.O..
2. Platform height is noted as maximum and may be reduced to fit the site conditions.
3. Vertical handrail post shall be DF-L #1 or better. All other sawn lumber shown are s4s sizes and shall be DF-L #2 or better.
4. Typical joist spacing shall be 18" max o.c.., U.N.O.
5. Plywood shall be 5/8" Plyform CDX and placed with face grain normal to studs U.N.O. with thickness as noted. Plywood shall be connected to joists with 10d nails at 18" o.c., max.
6. 16d nails shall be box nails with a diameter of 0.135" and 3" length or larger. 10d nails shall be box with a diameter of 0.128" and 2". Spacing should be such that no splitting of wood occurs.
7. Anchors shall be 1/2"Ø Simpson Titen HD or DeWalt Screw-Bolt + with 3.5" embed. Minimum torque 16 lb-ft unless more is required per manufacturer. All anchors shall be installed per manufactures specifications and recommendations.
8. During work platform shall be surrounded by reinforced 6 mil plastic sheeting. A HEPA air filters should be placed within the 6 mil plastic and positive air pressure used to contain any airborne debris.
9. Containment plastic will need to be sealed around bridge bearings
10. All operations which involve water and/or rain catchments will be removed from the work area with a vacuum truck as needed and disposed of properly.
11. Existing and operational rubble will be removed from the area with a vacuum truck as needed and disposed of properly.
12. Patch holes with a PCC repair material meeting the requirements of Section 02015 and according to the manufacturer’s recommendations.
13. Joists, post, handrail may need to be adjusted to fit through existing steel bracing and plywood will need to be cut to fit. As long as maximum spacings are maintained field fitting is accetptable without VAK's input.
14. Dimensions, offsets, lines, future structural elements and grade elevations shown on the plans are for reference only and are based on the information garnered from the provided documentation. General contractor is to coordinate dimensions, offsets, lines and any potential conflicts with future structural, architectural, mechanical and civil elements. Any discrepancies and lack of coordination between these drawings, site conditions and / or the above mentioned elements shall be sent to the engineer (VAK Construction Engineering) in a timely manner.
15. VAK will not supervise, direct, control or have authority over or be responsible for contractor's means, methods, techniques, sequences or procedures of demolition, construction, or the safety precautions and programs incident thereto, or for any failure of contractor to comply with laws and regulations applicable to the furnishing or performance of Work.
16. Design Loads:
Live Load: 25 PSF Lateral Load: 5% of Dead and Live
17. Design References:
NDS for Wood Construction, ASD
GENERAL NOTES:
Concrete Span
Steel Span
61'-0 1/2" (ref.)
Access Platform
4'- 0"
(m ax
06/11/2026
06/30/2027
VAK Construction Engineering Services, LLC 8285 SW Nimbus Avenue, Suite 104 Beaverton, Oregon 97008
503.718.5999 tel 503.718.5980 fax www.vakengineering.com
C A
D F
IL
E
:2
6A
R
D R
G S
.D W
G
LEE CONTRACTING
Boone Bridge
Access Scafolding Design Elevation / Section
CC 04/28/2026 BJHBJH AS NOTED 26-076A-02 30 Issued for Submittal CC 04/30/2026 BJH
1 Revised per Review CC 06/01/2026 BJH
2 Revised per Review CC 06/09/2026 BJH
3 Revised per Review CC 06/11/2026 BJH
Scale:
Section - Access Platform 1/4" = 1'-0"
Scale:
Elevation - Access Platform 1/4" = 1'-0"
9'- 0"
(m ax
4x4 Carrier
9'- 0"
(m ax
2x4 Horizontal Bracing (typ.)
4x4 Post @ 4'-0" O.C. (max.)
Simpson H3 Hurricane Bracket @ non-cantilevered end of every joist
2x4 Joists @ 1'-4" O.C.
6" (max.)
2x4 Horizontal Bracing (typ.)
4x4 Carrier
2x4 Bracing, Typ.
5/8" Plywood
Use Wedge Pack to Ensure Carrier is Tight to Wall (if needed)
Handrail, See6 mil Reinforced Plastic Surrounding Work Area
5/8" Plywood
2x4 w/ (2) 16d Nails (each side)
Reinforced Plastic
Ø 1/2" Titen HD or Screw-Bolt & Anchor w/ 3 1/2" Embed. @ 5'-0" O.C.
2x4 (15'-0" min. length)
2x4 Bracing, Typ.
4x4 Post @ 4'-0" O.C. (max.)
2x4 Joists @ 1'-4" O.C.
Reinforced Plastic Will Need to be Sealed Around Bridge Bearings
Joists at Posts May Need to be Adjusted and Plywood Cut to Fit Around Steel Bridge Bracing. As Long as Maximum Spacings are Maintained Field Fitting is Acceptable.
VAK Construction Engineering Services, LLC 8285 SW Nimbus Avenue, Suite 104 Beaverton, Oregon 97008
503.718.5999 tel 503.718.5980 fax www.vakengineering.com
C A
D F
IL
E
:2
6A
R
D R
G S
.D W
G
LEE CONTRACTING
Boone Bridge
Access Scafolding Design Details
CC 04/28/2026 BJHBJH AS NOTED 26-076A-03 30 Issued for Submittal CC 04/30/2026 BJH
1 Revised per Review CC 06/01/2026 BJH
2 Revised per Review CC 06/09/2026 BJH
3 Revised per Review CC 06/11/2026 BJH
Scale:
Brace Connection Detail 1 1/2" = 1'-0"
Scale:
Carrier to Post Connection 1 1/2" = 1'-0"
5/8" Plywood Gusset w/ (2) 16d Nails (each member) (one side of post only)
4x4 Carrier
4x4 Post @ 4'-0" O.C. (max.)
(2) 16d Nails @ Each End of 2x4 Brace (typ.)
2x4 Bracing (typ.)
*Use for All Diagonal & Horizontal Bracing
4x4 Post @ 4'-0" O.C.
(max.)
Scale:
Handrail Detail 3/4" = 1'-0"
4x4 Post @ 4'-0" O.C. (max.)
2x4 w/ (2) 16d Nails (each side)
4x4 Carrier
(2) 16d Toe Nail @ Post Only
2'- 0"
4'-0" (max.)
2x4 Joist
3 1/2" x 5/8" Plywood w/ (2) 10d Nails
2x4 Mid Rail w/ (2) 10d Nails
2x4 Post (No. 1)
Optional Top Rail Location 2x4 Top Rail w/ (2) 10d Nails
1'-
3/ 4"
1'- 9"
(2) 16d Nails
5/8" Plywood
2'-0" (max.)
Lee Contractors
B.Herndon STRUCTURAL CALCULATIONS 06/11/26
FOR
NB Boon Bridge(I-5 Over Willamette) Joint Rehab 26-076A Access Platform R3
CONTENTS:
Plywood and Joist Check 2-3
Joist Design Check 4-12
Carrier Design Check 13-19
Post Check 20
Bracing Check 21
Connection Designs 22-24
Handrail Design 25-29
Plastic Sheething Anchorage 30-45
Reference Documents 46-49
ATTACHMENTS:
NONE
REFERENCE DRAWINGS:
26-076A-01(3) thru -03(3)
DESIGN REFERENCES:
NDS for Wood Construction
06/11/2026
06/30/2027
Paul Strauser (ODOT Bridge) Revision Needed AASHTO Guide Design Specifications for Bridge Temporary Works
Construction Engineering Services
SHEET: _____ OF _____
PLYWOOD DESIGN BASED ON "APA CONCRETE FORMING DESIGN GUIDE"
DESIGN SPANS PER APA GUIDE:
FOR BENDING: USE CENTER TO CENTER (CtoC) OF SUPPORTS.
FOR DEFL: USE CLEAR DIST BTWN 2X SUPTS + 0.25".
USE CLEAR DIST BTWN 3X OR GREATER SUPTS + 0.625".
FOR SHEAR: USE CLEAR DIST. BTWN SUPPORTS.
LOCATION:
LOADING CRITERIA: PLYWOOD: 5/8 CDX GROUP 1
CONCRETE WT: 150.00 PCF, 24 kN/m^3
IN MM
SLAB THICKNESS: 0.00 0 CONCR. UNIT LOAD: 0.00 PSF, 0 kN/m^2
SUPT SPACING: 16.00 406 LIVE LOAD: 25.00 PSF, 1 kN/m^2
SUPPORT "d": 1.50 38 TOTAL DESIGN LOAD: 25.00 PSF, 1 kN/m^2
DESIGN SPAN LENGTH BEND'G L SHEAR L DEFL. L
IN 16.00 14.75 14.750
MM 406 375 375
SPAN M-COEFF. V-COEFF. D-COEFF.
2-SPAN CONT. 0.1250 0.6250 0.0054
DESIGN FORCES: DESIGN M DESIGN V
5.56 lb ft 19.21 lb
7.53 N m 85 N
MATERIAL PROPERTIES I-PAR KS-PAR Ib/Q-PAR
5/8 CDX GROUP 1 0.12 in^4/ft 0.33 in^3/ft 5.35 in^2/ft
6613 mm^4/ m 17581 mm^3/ m 11316 mm^2/ m
DESIGN STRESSES: fb fv DEFL
204 psi 4 psi 0.001 in
1406 kN/m^2 25 kN/m^2 0.03 mm
PLYWOOD CRITERIA: Fb, psi Fs psi E, psi
1930 psi 72 psi 1650000 psi
13307 kN/m^2 496 kN/m^2 11376349 kN/m^2
DEMAND RATIOS: BENDING SHEAR DEFL L/
0.11 0.05 14930
OK! OK! OK!
formwk9.xls 4/30/2026
Construction Engineering Services
SHEET: _____ OF _____
ITEM: JOISTS NOMINAL SIZE: 2 X 4
TIMBER GRADE: 2X4,4X4,NO 2
LOADING CRITERIA:
SLAB THKS: 0.00 in, 0 mm CONC. UNIT WT: 150.00 pcf, 24 kN/m^3
SPACING: 16.00 in, 406 mm
SUPPORT d: 3.50 in, 89 mm SLAB UNIT LD= 0.00 psf, 0 kN/m^2
UNIT L.L.= 25.00 psf, 1 kN/m^2
SPAN: 5.00 ft, 1524 mm TTL UNIT LOAD= 25.00 psf, 1 kN/m^2
DESIGN FORCES: SPAN: SIMPLE
UNIFORM LD= 33.33 plf, 0 kN/m M-COEFF.= 0.1250
DESIGN M= 104.17 lb ft, 0.14 kN m V-COEFF.= 0.5000
DESIGN V= 68.75 lbs, 0.31 kN D-COEFF.= 0.0130
DESIGN STRESSES: 2 X 4 DEMAND RATIOS: 2-SPAN CONT.
3-SPAN CONT.
fb= 408.10 psi, 2814 kN/m^2 BENDING= 0.21 OK!
fv= 19.64 psi, 135 kN/m^2 SHEAR= 0.14 OK!
DEFL= 0.05 in, 1 mm DEFL L/ 1098 OK!
MATERIAL PROPERTIES: Fv E
140 psi 1600000 psi
965 kN/m^2 11031611 kN/m^2
GRADE Fb net REPETITIVE SIZE DURATION Fb design
2X4,4X4,NO 2 900 psi 1.15 1.50 1.25 1941 psi
6205 kN/m^2 13380 kN/m^2
NOMINAL SIZE b d A I S
2 X 4 1.50 in 3.50 in 5.25 in^2 5.36 in^4 3.06 in^3
38 mm 89 mm 3387 mm^2 2230584 mm^4 50194 mm^3 formwk9.xls 4/30/2026
2'-0"
25psf*1.333' = 34 plf
300lb worker supported by at least
(2) joists
Project: Joist Ben Herndon, VAK CONSTRUCTION ENGINEERING SERVICES, LLC June 11, 2026 V:\2026\26076 LEE CONTRACTING BOONE BRIDGE\PHASE A ACCESS SCAFOLDING DESIGN\CALCS\R0\
Load Case Summary 3 Service Load Cases 2 Factored Combinations
Load Cases Load Case Design Checks Seismic Type Results Analyze? Envelope?
( 1)D -NA- -NA- Yes Yes No
( 2)L -NA- -NA- Yes Yes No
( 3)L(Point) -NA- -NA- Yes Yes No
( 4)D + L(Point) Allowable (ASD) -NA- Yes Yes No
( 5)D+ L Allowable (ASD) -NA- Yes Yes No
Load Combination Summary Factored Combination: D + L(Point)
Factor : Service Case
1.00 x D
1.00 x L(Point)
Factored Combination: D+ L Factor : Service Case
1.00 x D
1.00 x L
VisualAnalysis 12.00.0020 (www.iesweb.com)
Uplift support required, H3 Hurricane Clip 170 lbs.
Worst Case
VAK Construction Engineering, LLC.
Sheet______ of______
Wood Member Check - Joist
Width Height
1.50 x 3.5
Δy= 0.014 in Shear: 1.5
Mx= 0.302 K-Ft Duration: 1
Vx= 0.152 Kips Repetitive: 1
No.= 1 Wet Use: 1
Flate Use: 1
Size Factor: 1.5
Ult Factor: 1 (1.7 to Obtain Ult Stress)
Span 2 ft Cantilever: 2 (2 for cantilever)
A= 5.25 in
Fb= 850 Psi
Sx= 3.06 in
Fv= 180 Psi
Analysis: Limits: Check:
fb= 1183 Psi < Fb'= 1275 Psi Ok!
fv= 43 Psi < Fv'= 180 Psi Ok!
L/Δ= 1714 > L/Δ= 240 Ok!
Member:
6/11/2026
Wood Member Check - Carrier
Width Height
3.50 x 3.5
Δy= 0.016 in Shear: 1.5
Mx= 0.228 K-Ft Duration: 1
Vx= 0.282 Kips Repetitive: 1
No.= 1 Wet Use: 1
Flate Use: 1
Size Factor: 1.5
Ult Factor: 1 (1.7 to Obtain Ult Stress)
Span 8 ft Cantilever: 1 (2 for cantilever)
A= 12.25 in
Fb= 850 Psi
Sx= 7.15 in
Fv= 180 Psi
Analysis: Limits: Check:
fb= 383 Psi < Fb'= 1275 Psi Ok!
fv= 35 Psi < Fv'= 180 Psi Ok!
L/Δ= 6000 > L/Δ= 240 Ok!
6/8/2026
Wood Member Check - Post
Width Height
3.50 x 3.5
Δy= 0 in Shear: 1.5
Mx= 0.562 K-Ft Duration: 1.6
Vx= 0 Kips Repetitive: 1
My= 0 K-ft Wet Use: 1
Vy= 0.272 Kips Flate Use: 1
Fx= 0.451 Kips Size Factor: 1
C: 0.85 (3.7.1)
K: 1.20
Col. Stability: 0.23
Beam Stability: 1.02
Ult Factor: 1 (1.7 to Obtain Ult Stress)
Span 9 ft Cantilever: 1 (2 for cantilever)
Unbraced Lu: 10.8 ft
(Table 3.3.3) Le(Beam): 12.96 ft Fc= 1400 Psi
A= 12.25 in
Fb= 850 Psi
Sx= 7.15 in
Fv= 180 Psi
Sy= 7.15 in
Emin= 1,300,000 Psi
Analysis: Limits: Check:
fbx= 944 Psi < Fbx'= 1386 Psi Ok!
fby= 0 Psi < Fby'= 1386 Psi Ok!
fvx= 0 Psi < Fvx'= 288 Psi Ok!
fvy= 22 Psi < Fvy'= 1386 Psi Ok!
L/Δ= ##### > L/Δ= 240 #DIV/0!
fc= 36.82 Psi < Fc'= 518 Psi Ok!
Bi-Axial Bend: (3.9-3) 0.736 < 1.00 Good
(3.9-4) 0.07 < 1.00 Good
6/9/2026
Wood Member Check - Brace
Width Height
1.50 x 3.5
Δy= 0 in Shear: 1.5
Mx= 0 K-Ft Duration: 1.6
Vx= 0 Kips Repetitive: 1
My= 0 K-ft Wet Use: 1
Vy= 0 Kips Flate Use: 1
Fx= 0.06 Kips Size Factor: 1
C: 0.85 (3.7.1)
K: 2.00
Col. Stability: 0.00
Beam Stability: 0.72
Ult Factor: 1 (1.7 to Obtain Ult Stress)
Span 9.9 ft Cantilever: 1 (2 for cantilever)
Unbraced Lu: 19.8 ft
(Table 3.3.3) Le(Beam): 23.76 ft Fc= 1400 Psi
A= 5.25 in
Fb= 850 Psi
Sx= 3.06 in
Fv= 180 Psi
Sy= 1.31 in
Emin= 1,300,000 Psi
Analysis: Limits: Check:
fbx= 0 Psi < Fbx'= 976 Psi Ok!
fby= 0 Psi < Fby'= 976 Psi Ok!
fvx= 0 Psi < Fvx'= 288 Psi Ok!
fvy= 0 Psi < Fvy'= 976 Psi Ok!
L/Δ= ##### > L/Δ= 240 #DIV/0!
fc= 11.43 Psi < Fc'= 11 Psi No Good
Bi-Axial Bend: (3.9-3) 1.154 < 1.00 NG!
(3.9-4) 1.07 < 1.00 NG!
4/30/2026
Wood Member Check - Handrail Post
Width Height
1.50 x 3.5
Δy= 0.011 in Shear: 1.5
Mx= 0.7 K-Ft Duration: 2
Vx= 0.2 Kips Repetitive: 1
No.= 1 Wet Use: 1
Flate Use: 1
Size Factor: 1.5
Ult Factor: 1 (1.7 to Obtain Ult Stress)
Span 3.5 ft Cantilever: 1 (2 for cantilever)
A= 5.25 in
Fb= 1150 Psi
Sx= 3.06 in
Fv= 180 Psi
Analysis: Limits: Check:
fb= 2743 Psi < Fb'= 3450 Psi Ok!
fv= 57 Psi < Fv'= 360 Psi Ok!
L/Δ= 3818 > L/Δ= 240 Ok!
5/29/2026
Wood Member Check - Handrail Post
Width Height
1.50 x 3.5
Δy= 0 in Shear: 1.5
Mx= 0 K-Ft Duration: 1.6
Vx= 0 Kips Repetitive: 1
My= 0 K-ft Wet Use: 1
Vy= 0 Kips Flate Use: 1
Fx= 0.2 Kips Size Factor: 1
C: 0.85 (3.7.1)
K: 1.50
Col. Stability: 0.12
Beam Stability: 0.96
Ult Factor: 1 (1.7 to Obtain Ult Stress)
Span 3.5 ft Cantilever: 1 (2 for cantilever)
Unbraced Lu: 5.25 ft
(Table 3.3.3) Le(Beam): 6.3 ft Fc= 1400 Psi
A= 5.25 in
Fb= 850 Psi
Sx= 3.06 in
Fv= 180 Psi
Sy= 1.31 in
Emin= 1,300,000 Psi
Analysis: Limits: Check:
fbx= 0 Psi < Fbx'= 1303 Psi Ok!
fby= 0 Psi < Fby'= 1303 Psi Ok!
fvx= 0 Psi < Fvx'= 288 Psi Ok!
fvy= 0 Psi < Fvy'= 1303 Psi Ok!
L/Δ= ##### > L/Δ= 240 #DIV/0!
fc= 38.1 Psi < Fc'= 264 Psi Ok!
Bi-Axial Bend: (3.9-3) 0.021 < 1.00 Good
(3.9-4) 0.14 < 1.00 Good
Member:
5/29/2026
2x4 for Handrail reactions is acceptable as well
Wood Member Check - Top Rail (Weak)
Width Height
3.50 x 1.5
Δy= 0.011 in Shear: 1.5
Mx= 0.2 K-Ft Duration: 2
Vx= 0.2 Kips Repetitive: 1
No.= 1 Wet Use: 1
Flate Use: 1
Size Factor: 1.5
Ult Factor: 1 (1.7 to Obtain Ult Stress)
Span 3.5 ft Cantilever: 1 (2 for cantilever)
A= 5.25 in
Fb= 850 Psi
Sx= 1.31 in
Fv= 180 Psi
Analysis: Limits: Check:
fb= 1829 Psi < Fb'= 2550 Psi Ok!
fv= 57 Psi < Fv'= 360 Psi Ok!
L/Δ= 3818 > L/Δ= 240 Ok!
Wood Member Check - Post
Width Height
3.50 x 3.5
Δy= 0 in Shear: 1.5
Mx= 0.544 K-Ft Duration: 1.6
Vx= 0 Kips Repetitive: 1
My= 0 K-ft Wet Use: 1
Vy= 0.272 Kips Flate Use: 1
Fx= 0.451 Kips Size Factor: 1
C: 0.85 (3.7.1)
K: 1.20
Col. Stability: 0.23
Beam Stability: 1.02
Ult Factor: 1 (1.7 to Obtain Ult Stress)
Span 9 ft Cantilever: 1 (2 for cantilever)
Unbraced Lu: 10.8 ft
(Table 3.3.3) Le(Beam): 12.96 ft Fc= 1400 Psi
A= 12.25 in
Fb= 850 Psi
Sx= 7.15 in
Fv= 180 Psi
Sy= 7.15 in
Emin= 1,300,000 Psi
Analysis: Limits: Check:
fbx= 914 Psi < Fbx'= 1386 Psi Ok!
fby= 0 Psi < Fby'= 1386 Psi Ok!
fvx= 0 Psi < Fvx'= 288 Psi Ok!
fvy= 22 Psi < Fvy'= 1386 Psi Ok!
L/Δ= ##### > L/Δ= 240 #DIV/0!
fc= 36.82 Psi < Fc'= 518 Psi Ok!
Bi-Axial Bend: (3.9-3) 0.713 < 1.00 Good
(3.9-4) 0.07 < 1.00 Good
Final design of handrail similar to sketch
Wood Member Check - Post
Width Height
1.50 x 3.5
Δy= 0 in Shear: 1.5
Mx= 0.138 K-Ft Duration: 1.25
Vx= 0.11 Kips Repetitive: 1
My= 0.266 K-ft Wet Use: 1
Vy= 0.213 Kips Flate Use: 1
Fx= 0 Kips Size Factor: 1.5
C: 0.85 (3.7.1)
K: 1.20
Col. Stability: 0.12
Beam Stability: 0.93
Ult Factor: 1 (1.7 to Obtain Ult Stress)
Span 5 ft Cantilever: 1 (2 for cantilever)
Unbraced Lu: 6 ft
(Table 3.3.3) Le(Beam): 7.2 ft Fc= 1400 Psi
A= 5.25 in
Fb= 850 Psi
Sx= 3.06 in
Fv= 180 Psi
Sy= 1.31 in
Emin= 1,300,000 Psi
Analysis: Limits: Check:
fbx= 539 Psi < Fbx'= 1476 Psi Ok!
fby= 202.4 Psi < Fby'= 1476 Psi Ok!
fvx= 31 Psi < Fvx'= 225 Psi Ok!
fvy= 40 Psi < Fvy'= 1476 Psi Ok!
L/Δ= ##### > L/Δ= 240 #DIV/0!
fc= 0 Psi < Fc'= 316 Psi Ok!
Bi-Axial Bend: (3.9-3) 0.503 < 1.00 Good
(3.9-4) 0.00 < 1.00 Good
6/1/2026
Company: Date: 6/1/2026 Engineer: Page: 1
Project:
Address:
Phone:
E-mail:
Anchor Designer™ for Concrete Software Version 3.4.2604.1
1.Project information
Project description:
Location:
Design name: Design
Comment:
2. Input Data & Anchor Parameters
General Design method:ACI 318-19 Units: Imperial units
Anchor Information:
Anchor type: Concrete screw Material: Carbon Steel Diameter (inch): 0.500 Nominal Embedment depth (inch): 3.250 Effective Embedment depth, hef (inch): 2.350 Code report: ICC-ES ESR-2713 Anchor category: 1 Anchor ductility: No hmin (inch): 5.00 cac (inch): 3.56 Cmin (inch): 1.75 Smin (inch): 2.00
Base Material Concrete: Normal-weight Concrete thickness, h (inch): 5.00 State: Cracked Compressive strength, f’c (psi): 2500 Ψc,V: 1.0 Reinforcement condition: B tension, B shear Supplemental edge reinforcement: Not applicable Reinforcement provided at corners: No Ignore concrete breakout in tension: No Ignore concrete breakout in shear: No Ignore 6do requirement: Not applicable Build-up grout pad: No
Recommended Anchor Anchor Name: Titen HD® - 1/2"Ø THD, hnom:3.25" (83mm) Code Report: ICC-ES ESR-2713
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
Engineer: Page: 2
Project:
Address:
Phone:
E-mail:
Anchor Designer™ for Concrete Software Version 3.4.2604.1
Load and Geometry Load factor source: ACI 318 Section 5.3 Load combination: not set Seismic design: No Anchors subjected to sustained tension: Not applicable Apply entire shear load at front row: Yes Anchors only resisting wind and/or seismic loads: No
Strength level loads:
Nua [lb]: 748 Vuax [lb]: 0 Vuay [lb]: 388
<Figure 1>
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
Engineer: Page: 3
Project:
Address:
Phone:
E-mail:
Anchor Designer™ for Concrete Software Version 3.4.2604.1
<Figure 2>
3. Resulting Anchor Forces
Anchor Tension load, Nua (lb)
Shear load x, Vuax (lb)
Shear load y, Vuay (lb)
Shear load combined, √(Vuax)²+(Vuay)² (lb)
1 748.0 0.0 388.0 388.0
Sum 748.0 0.0 388.0 388.0
Maximum concrete compression strain (‰): 0.00 Maximum concrete compression stress (psi): 0 Resultant tension force (lb): 748 Resultant compression force (lb): 0 Eccentricity of resultant tension forces in x-axis, e'Nx (inch): 0.00 Eccentricity of resultant tension forces in y-axis, e'Ny (inch): 0.00 Eccentricity of resultant shear forces in x-axis, e'Vx (inch): 0.00 Eccentricity of resultant shear forces in y-axis, e'Vy (inch): 0.00
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
Engineer: Page: 4
Project:
Address:
Phone:
E-mail:
Anchor Designer™ for Concrete Software Version 3.4.2604.1
4. Steel Strength of Anchor in Tension (Sec. 17.6.1)
Nsa (lb) Nsa (lb)
20130 0.65 13085
5. Concrete Breakout Strength of Anchor in Tension (Sec. 17.6.2)
Nb = kc a f’chef1.5 (Eq. 17.6.2.2.1) kc a f’c (psi) hef (in) Nb (lb)
17.0 1.00 2500 2.350 3062
Ncb = (ANc / ANco) ed,N c,N cp,NNb (Sec. 17.5.1.2 & Eq. 17.6.2.1a)
ANc (in2) ANco (in2) ca,min (in) ed,N c,N cp,N Nb (lb) Ncb (lb)
49.70 49.70 - 1.000 1.00 1.000 3062 0.65 1990
6. Steel Strength of Anchor in Shear (Sec. 17.7.1)
Vsa (lb) grout grout Vsa (lb)
7455 1.0 0.60 4473
7. Concrete Pryout Strength of Anchor in Shear (Sec. 17.7.3)
Vcp = kcpNcb = kcp(ANc / ANco) ed,N c,N cp,NNb (Sec. 17.5.1.2 & Eq. 17.7.3.1a) kcp ANc (in2) ANco (in2) ed,N c,N cp,N Nb (lb) Vcp (lb)
1.0 49.70 49.70 1.000 1.000 1.000 3062 0.70 2143
8. Results
Interaction of Tensile and Shear Forces (Sec. R17.8)
Tension Factored Load, Nua (lb) Design Strength, øNn (lb) Ratio Status Steel 748 13085 0.06 Pass
Concrete breakout 748 1990 0.38 Pass (Governs)
Shear Factored Load, Vua (lb) Design Strength, øVn (lb) Ratio Status Steel 388 4473 0.09 Pass
Pryout 388 2143 0.18 Pass (Governs)
Interaction check (Nua/ɸNua)5/3 (Vua/ɸVua)5/3 Utilization Ratio Permissible Status Sec. R17.8 0.20 0.06 25.4% 1.0 Pass
1/2"Ø THD, hnom:3.25" (83mm) meets the selected design criteria.
9. Warnings
- Designer must exercise own judgment to determine if this design is suitable.
- Refer to manufacturer’s product literature for hole cleaning and installation instructions.
Input data and results must be checked for agreement with the existing circumstances, the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W. Las Positas Boulevard Pleasanton, CA 94588 Phone: 925.560.9000 Fax: 925.847.3871 www.strongtie.com
Reference Documents
Simpson Strong-Tie® Wood Construction Connectors
S tr ap s an d
T ie s
C -C
-2
S
IM
P S
O N
S
TR
O N
G -T
IE
C
O M
PA
N
Y
IN
C
Seismic and Hurricane Ties
H/TSP
Simpson Strong-Tie hurricane ties provide a positive connection between truss/rafter and the wall of the structure to resist wind and seismic forces.
Material: See table
Finish: Galvanized. H 1.81Z, H7Z and H11Z — ZMAX® coating.
Some models available in stainless steel or ZMAX; see Corrosion Information, pp. 12–15 or visit strongtie.com.
Installation:
• Use all specified fasteners; see General Notes.
• H urricane ties can be installed with flanges facing inward or outward.
LINE
PLATE
LINE
PLATE
H 2.5A (H 2.5ASS similar)
H 3 (H3SS similar)
H6
• H 2.5T, H 3 and H6 ties are shipped in equal quantities of right and left versions (right versions shown).
• Hurricane ties do not replace solid blocking.
• When installing ties on plated trusses (on the side opposite the truss plate) do not fasten through the truss plate from behind.
This can force the truss plate off of the truss and compromise truss performance.
• H10A optional nailing to connect shear blocking, use 0.131" x 2 1/2" nails. Slots allow maximum field bending up to a pitch of 6:12, use H10A sloped loads for field-bent installation.
Codes: See p. 11 for Code Reference Key Chart
H8 (H8SS similar)H7Z
H 2.5T
15⁄8" 5"
115⁄8"
3"
31⁄2"
H10S
5"
61⁄4"
31⁄2"
19⁄16" 13⁄16"
H10A (H10ASS similar)
H2A (H2ASS similar)
107⁄16"
33⁄8"
31⁄2"
13⁄4"
11⁄2"
15⁄8"
77⁄8"
47⁄16"
1"
TSP
5"
61⁄4"
31⁄2"
11⁄16"
2"
H10AR
69⁄16"
61⁄4"
31⁄2"
31⁄8" 13⁄16"
H10A-2 H11Z H14
H14 Profile
19⁄16"
H 1 (H 1.81Z similar)
H Hurricane Ties
TSP Stud Plate Tie
Simpson Strong-Tie® Wood Construction Connectors
S tr ap s an d
T ie s
C -C
-2
S
IM
P S
O N
S
TR
O N
G -T
IE
C
O M
PA
N
Y
IN
C
Seismic and Hurricane Ties (cont.)
H/TSP
Many of these products are approved for installation with Strong-Drive® SD Connector screws.
See pp. 348–352 for more information.
These products are available with additional corrosion protection. For more information, see p. 14.
For stainless-steel fasteners, see p. 21.
Model No. Ga.
Fasteners (in.) DF/SP Allowable Loads Uplift with 0.131" x 1 1/2"
Nails (160)
SPF/HF Allowable Loads Uplift with 0.131" x 1 1/2"
Nails (160)
Code Ref.To
Rafters/Truss To
Plates To
Studs Uplift (160)
Lateral (160) Uplift (160)
Lateral (160)
F1 F2 F1 F2
H1 18 (6) 0.131 x 1 1/2 (4) 0.131 x 2 1/2 — 480 510 190 455 425 440 165 370 IBC, FL, LA
H1.81Z 18 (6) 0.131 x 1 1/2 (4) 0.131 x 2 1/2 — 540 440 170 460 465 380 130 395 —
H2A 18 (5) 0.131 x 1 1/2 (2) 0.131 x 1 1/2 (5) 0.131 x 1 1/2 525 130 55 — 495 130 55 — IBC, FL, LA
H2ASS 18 (5) 0.131 x 1 1/2 (2) 0.131 x 1 1/2 (5) 0.131 x 1 1/2 400 130 55 400 345 130 55 345 —
H2.5A 18 (5) 0.131 x 2 1/2 (5) 0.131 x 2 1/2 — 700 110 110 625 615 110 110 540 IBC, FL, LA
H2.5ASS 18 (5) 0.131 x 2 1/2 (5) 0.131 x 2 1/2 — 440 75 70 365 380 75 70 310 —
H2.5T 18 (5) 0.131 x 2 1/2 (5) 0.131 x 2 1/2 — 590 135 145 480 565 135 145 475
IBC, FL, LA
H3 18 (4) 0.131 x 2 1/2 (4) 0.131 x 2 1/2 — 400 210 170 400 365 180 145 290
H3SS 18 (4) 0.131 x 2 1/2 (4) 0.131 x 2 1/2 — 280 145 120 275 225 100 85 210 —
H6 16 — (8) 0.131 x 2 1/2 (8) 0.131 x 2 1/2 1,230 — — — 1,065 — — —
IBC, FL, LAH7Z 16 (4) 0.131 x 2 1/2 (2) 0.131 x 1 1/2 (8) 0.131 x 2 1/2 830 410 — — 715 355 — —
H8 18 (5) 0.148 x 1 1/2 (5) 0.148 x 1 1/2 — 780 95 90 630 710 95 90 510
H8SS 18 (5) 0.148 x 1 1/2 (5) 0.148 x 1 1/2 — 610 90 120 440 370 90 55 335 —
H10A Field Bent 18 (9) 0.148 x 1 1/2 (9) 0.148 x 1 1/2 — 780 590 285 — 760 505 285 —
IBC, FL, LA
H10A 18 (9) 0.148 x 1 1/2 (9) 0.148 x 1 1/2 — 1,040 565 285 — 1,015 485 285 —
H10ASS 18 (9) 0.148 x 1 1/2 (9) 0.148 x 1 1/2 — 970 565 170 — 835 485 170 —
H10AR 18 (9) 0.148 x 1 1/2 (9) 0.148 x 1 1/2 — 1,050 490 285 — 905 420 285 —
H10S 18 (8) 0.131 x 1 1/2 (8) 0.131 x 1 1/2 (8) 0.131 x 2 1/2 910 660 215 550 785 570 185 475
IBC, FL, LA
H10A-2 18 (9) 0.148 x 1 1/2 (9) 0.148 x 1 1/2 — 1,080 680 260 — 930 585 225 —
H11Z 18 (6) 0.162 x 2 1/2 (6) 0.162 x 2 1/2 — 830 525 760 — 715 450 655 — —
H14 18
(12) 0.131 x 1 1/2 (13) 0.131 x 2 1/2 — 1,275 725 285 — 1,050 480 245 —
IBC, FL, LA
(12) 0.131 x 1 1/2 (15) 0.131 x 2 1/2 — 1,340 670 230 — 1,050 480 245 —
TSP 16
(9) 0.148 x 1 1/2 (6) 0.148 x 1 1/2 — 755 310 190 — 650 265 160 —
(9) 0.148 x 1 1/2 (6) 0.148 x 3 — 1,015 310 190 — 875 265 160 —
| 1. | See pp. 266–267 for Straps and Ties General Notes. |
| 2. | Allowable loads are for one anchor. A minimum rafter thickness of 2 1/2" must be used when framing anchors are used on each side |
of the joist and on the same side of the plate (exception: connectors installed such that nails on opposite side don’t interfere).
3. Allowable DF/SP uplift load for stud-to-bottom plate installation (see detail 12) is 390 lb. (H 2.5A); 265 lb. (H 2.5ASS); and 310 lb. (H8).
For SPF/HF values, multiply these values by 0.86.
4. Allowable loads in the F1 direction are not intended to replace diaphragm boundary members and do not account for possible cross-grain bending of the truss or rafter members.
5. When cross-grain bending or cross-grain tension cannot be avoided in the members, mechanical reinforcement to resist such forces shall be considered by the designer.
6. Hurricane ties are shown installed on the outside of the wall for clarity and assume a minimum overhang of 3 1/2". Installation on the inside of the wall is acceptable. For uplift Continuous Load Path, connections in the same area (i.e., truss-to-plate connector and plate-to-stud connector) must be on same side of the wall.
7. Southern pine allowable uplift loads for H10A = 1,105 lb. (160), H 2.5A with 0.131" x 1 1/2" nails = 635 lb. (160) and H 2.5A with 0.131" x 2 1/2" nails = 730 lb. (160).
| 8. | Refer to Simpson Strong-Tie® technical bulletin T-C-HTIEBEAR at strongtie.com for allowable bearing enhancement loads. |
| 9. | H10S can have the stud offset a maximum of 1" from the rafter (center to center) for a reduced uplift of 890 lb. (DF/SP) and 765 lb. (SPF). |
| 10. | H10S nails to plates are optional for uplift but required for lateral loads. |
| 11. | Some load values for the stainless-steel connectors shown here are lower than those for the carbon-steel versions. |
Ongoing test programs have shown this also to be the case with other stainless-steel connectors in the product line that are installed with nails. Visit strongtie.com/corrosion for updated information.
12. The allowable loads of stainless-steel connectors match carbon-steel connectors when installed with stainless-steel Strong-Drive® SCNR Ring-Shank Connector nails. For more information, refer to engineering letter L-F-SSNAILS at strongtie.com.
13. Simpson Strong-Tie offers stainless-steel Strong-Drive SCNR Ring-Shank Connector nails. For bulk SCNR nails, see p. 345;
for collated SCNR nails, see p. 346. For general fastener information, see pp. 21–22.
14. Allowable DF/SP/SPF uplift load for the H 2.5A fastened to a 2x4 truss bottom chord and double top plates using five 0.131" x 1 1/2" nails in the top plates and three 0.131" x 1 1/2" nails in the lowest three flange holes into the truss bottom chord is 260 lb. (160).
| 15. | For TSP installed stud to single plate see pp. 280–281. |
| 16. | For simultaneous loads in more than one direction, the connector must be evaluated using either the Unity Equation or the 75% Rule, |
as described in Straps and Ties General Notes on p. 267.
17. Fasteners: Nail dimensions are listed diameter by length. See pp. 21–22 for fastener information.
H Hurricane Ties
TSP Stud Plate Tie
2025.12.09 13:05:37 -08'00'
| Sheets and Views |
| 26 076A R3 DRGS-26-076A-0(1) |
| 26 076A R3 DRGS-26-076A-0(2) |
| 26 076A R3 DRGS-26-076A-0(3) |
| 2026-06-15T12:06:21-0700 | |
| STRAUSER Paul J |