Prelim Bid Results~87.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- ITB - Condon Pedestrian Access Project
- Solicitation number
- S-73000-00007424
- Issued by
- Deschutes County, Corvallis City, Oregon
About this file
This document is a Preliminary Bid Results spreadsheet for the Condon Pedestrian Access Project ITB in the state of Oregon. The project involves constructing sidewalks, driveways, and curb ramps on North Main Street and Frazer Street in the City of Condon for the benefit of ODOT. The scope of work includes all labor, materials, transportation, equipment, and services required to complete the construction. The bid results show the unit prices and total bid amounts from three contractors: Brown Contracting, Inc., Cascade Civil Corp, and HP Civil Inc. The bid items include mobilization, traffic control, erosion control, contaminated soil disposal, construction survey work, concrete flatwork, curb and gutter, and signage.
The pricing details show a range of unit prices across the various bid items. The lowest total bid price is $444,888 from Brown Contracting, Inc., while the highest is $555,445.77 from HP Civil Inc. There are no indications of any set-asides, incumbent contractors, or specific funding requirements in the provided information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 35722 Special Provisions.pdf | ||
| Bid Pricing Form~19.xlsx | XLSX spreadsheet | |
| 35722 Invitation to Bid.docx | DOCX document | |
| ATTACHMENT 4 Budget Proposal.pdf | ||
| 35722 Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| S-73000-00007424 Condon Pedestrian Access Project | ||||||
| PRELIMINARY BID RESULTS | Brown Contracting, Inc. | Cascade Civil Corp | HP Civil Inc. | |||
| Bid Item # | Description | Est | ||||
| QTY | UNIT | UNIT | ||||
| PRICE | TOTAL | |||||
| PRICE | UNIT | |||||
| PRICE | TOTAL | |||||
| PRICE | UNIT | |||||
| PRICE | TOTAL | |||||
| PRICE | UNIT | |||||
| PRICE | TOTAL |
PRICE
| 1 | MOBILIZATION | 1 | LS | $ 44,000.00 | $ 44,000.00 | $ 36,500.00 | $ 36,500.00 | $55,544.57 | $ 55,544.57 | $ - 0 | |
| 2 | TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC | 1 | LS | $ 6,000.00 | $ 6,000.00 | $ 12,000.00 | $ 12,000.00 | $55,000.00 | $ 55,000.00 | $ - 0 | |
| 3 | TEMPORARY SIGNS | 515 | SQFT | $ 18.00 | $ 9,270.00 | $ 7.00 | $ 3,605.00 | $1.00 | $ 515.00 | $ - 0 | |
| 4 | FLAGGERS | 100 | HOUR | $ 1.00 | $ 100.00 | $ 70.00 | $ 7,000.00 | $60.00 | $ 6,000.00 | $ - 0 | |
| 5 | TEMPORARY BARRICADES, TYPE II | 8 | EACH | $ 85.00 | $ 680.00 | $ 110.00 | $ 880.00 | $100.00 | $ 800.00 | $ - 0 | |
| 6 | PEDESTRIAN CHANNELIZING DEVICES | 130 | FOOT | $ 25.00 | $ 3,250.00 | $ 6.00 | $ 780.00 | $23.00 | $ 2,990.00 | $ - 0 | |
| 7 | EROSION CONTROL | 1 | LS | $ 4,000.00 | $ 4,000.00 | $ 2,200.00 | $ 2,200.00 | $7,500.00 | $ 7,500.00 | $ - 0 | |
| 8 | INLET PROTECTION, TYPE 7 | 2 | EACH | $ 300.00 | $ 600.00 | $ 260.00 | $ 520.00 | $250.00 | $ 500.00 | $ - 0 | |
| 9 | POLLUTION CONTROL PLAN | 1 | LS | $ 2,000.00 | $ 2,000.00 | $ 1,200.00 | $ 1,200.00 | $3,100.00 | $ 3,100.00 | $ - 0 | |
| 10 | HEALTH AND SAFETY PLAN | 1 | LS | $ 2,000.00 | $ 2,000.00 | $ 3,500.00 | $ 3,500.00 | $3,100.00 | $ 3,100.00 | $ - 0 | |
| 11 | LEAD COMPLIANCE PLAN | 1 | LS | $ 2,000.00 | $ 2,000.00 | $ 3,500.00 | $ 3,500.00 | $3,100.00 | $ 3,100.00 | $ - 0 | |
| 12 | CONTAMINATED SOIL DISPOSAL | 133 | TON | $ 115.00 | $ 15,295.00 | $ 250.00 | $ 33,250.00 | $90.00 | $ 11,970.00 | $ - 0 | |
| 13 | SEGREGATE AND STOCKPILE CONTAMINATED SOIL | 1 | LS | $ 5,000.00 | $ 5,000.00 | $ 50,000.00 | $ 50,000.00 | $25,000.00 | $ 25,000.00 | $ - 0 | |
| 14 | SOIL SAMPLE COLLECTION AND ANALYTICAL TESTING | 2 | EACH | $ 3,500.00 | $ 7,000.00 | $ 4,000.00 | $ 8,000.00 | $2,000.00 | $ 4,000.00 | $ - 0 | |
| 15 | CONSTRUCTION SURVEY WORK | 1 | LS | $ 12,000.00 | $ 12,000.00 | $ 7,400.00 | $ 7,400.00 | $25,000.00 | $ 25,000.00 | $ - 0 | |
| 16 | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | 1 | LS | $ 43,000.00 | $ 43,000.00 | $ 24,000.00 | $ 24,000.00 | $20,000.00 | $ 20,000.00 | $ - 0 | |
| 17 | GENERAL EXCAVATION | 1 | LS | $ 32,125.00 | $ 32,125.00 | $ 57,000.00 | $ 57,000.00 | $75,000.00 | $ 75,000.00 | $ - 0 | |
| 18 | ADJUSTING BOXES | 8 | EACH | $ 600.00 | $ 4,800.00 | $ 95.00 | $ 760.00 | $800.00 | $ 6,400.00 | $ - 0 | |
| 19 | AGGREGATE BASE | 314 | TON | $ 120.00 | $ 37,680.00 | $ 145.00 | $ 45,530.00 | $80.00 | $ 25,120.00 | $ - 0 | |
| 20 | CONCRETE CURBS, CURB AND GUTTER | 668 | FOOT | $ 120.00 | $ 80,160.00 | $ 61.00 | $ 40,748.00 | $74.00 | $ 49,432.00 | $ - 0 | |
| 21 | CONCRETE CURBS, STANDARD CURB | 18 | FOOT | $ 160.00 | $ 2,880.00 | $ 48.00 | $ 864.00 | $76.00 | $ 1,368.00 | $ - 0 | |
| 22 | CONCRETE DRIVEWAYS | 1443 | SQFT | $ 20.00 | $ 28,860.00 | $ 15.00 | $ 21,645.00 | $23.00 | $ 33,189.00 | $ - 0 | |
| 23 | CONCRETE DRIVEWAYS, REINFORCED | 776 | SQFT | $ 26.00 | $ 20,176.00 | $ 17.00 | $ 13,192.00 | $26.50 | $ 20,564.00 | $ - 0 | |
| 24 | CONCRETE WALKS | 4964 | SQFT | $ 13.00 | $ 64,532.00 | $ 12.00 | $ 59,568.00 | $ 18.80 | $ 93,323.20 | $ - 0 | |
| 25 | EXTRA FOR CURB RAMPS | 6 | EACH | $ 800.00 | $ 4,800.00 | $ 1,100.00 | $ 6,600.00 | $ 2,500.00 | $ 15,000.00 | $ - 0 | |
| 26 | TRUNCATED DOMES ON NEW SURFACES | 60 | SQFT | $ 82.00 | $ 4,920.00 | $ 55.00 | $ 3,300.00 | $ 52.00 | $ 3,120.00 | $ - 0 | |
| 27 | REMOVE EXISTING SIGNS | 1 | LS | $ 1,200.00 | $ 1,200.00 | $ 1,100.00 | $ 1,100.00 | $ 1,500.00 | $ 1,500.00 | $ - 0 | |
| 28 | SIGN SUPPORT FOOTINGS | 1 | LS | $ 2,000.00 | $ 2,000.00 | $ 2,300.00 | $ 2,300.00 | $ 3,000.00 | $ 3,000.00 | $ - 0 | |
| 29 | PERFORATED STEEL SQUARE TUBE SLIP BASE SIGN SUPPORTS | 1 | LS | $ 2,400.00 | $ 2,400.00 | $ 1,100.00 | $ 1,100.00 | $ 3,500.00 | $ 3,500.00 | $ - 0 | |
| 30 | SIGNS, STANDARD SHEETING, PLYWOOD | 27 | SQFT | $ 80.00 | $ 2,160.00 | $ 44.00 | $ 1,188.00 | $ 30.00 | $ 810.00 | $ - 0 | |
| TOTAL | $ 444,888.00 | $ 449,230.00 | $ 555,445.77 | $ - 0 |