Prelim Bid Results~38.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
ITB - Burnt Butte Cinder Pit Rock Production
Solicitation number
S-73000-00002414
Issued by
Jackson County, Cheshire CDP, Oregon

About this file

This is a preliminary bid results spreadsheet for the Mosier Creek Bridge Project (US 30: Mosier Connection Over UPRR), a state and local transportation infrastructure contract opportunity in Oregon. The project encompasses comprehensive bridge reconstruction and roadway improvements, including mobilization, traffic control, erosion management, excavation, drainage systems, culvert installation, pavement work, concrete improvements, signage, and site restoration. The solicitation attracted two bidders: JAL Construction, Inc., with a total bid of $578,366.00, and Granite Construction Company, with a total bid of $1,082,358.00. The project includes 51 distinct line items ranging from temporary work zone traffic control (estimated at $19,000-$60,000) to storage pond construction ($4,500-$35,000), with major cost items including general excavation, asphalt pavement installation, concrete walks, and culvert pipe installation. The estimated quantities reflect substantial construction scope, including 545 cubic yards of excavation, 770 tons of aggregate base, 275 tons of asphalt mixture, 2,840 square feet of concrete walks, and 224 feet of 18-inch culvert pipe.

The pricing structure utilizes fixed unit prices with total project pricing ranging from approximately $578,000 to $1.08 million depending on contractor selection. JAL Construction's bid represents the lower proposal, with significant pricing advantages on major cost items including general excavation ($57 per cubic yard versus $195), asphalt mixture ($370 per ton versus $275), and concrete walks ($15 per square foot versus $40). Granite Construction's bid reflects higher unit pricing across most line items, particularly for specialized items such as lead compliance planning ($90,000 versus $3,000) and erosion control ($40,000 versus $800). The preliminary bid results indicate that JAL Construction emerged as the apparent low bidder; however, the file does not specify contract award dates, incumbency status, funding sources, or set-aside designations for this specific project.

View the file

Other files

File Type Posted
Narrative Packet.pdf PDF
Plans~10.pdf PDF
Bid Cover Sheet~10.docx DOCX document
Invitation to Bid~40.docx DOCX document
Prelim Bid Results~44.xlsx XLSX spreadsheet
Sample Contract~14.docx DOCX document
Special Provisions~1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

S-73000-00002416 US30: Mosier Conn Over UPRR – Mosier Creek Bridge Project
PRELIMINARY BID RESULTSJAL Construction, Inc.Granite Construction Company
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1Mobilization1LS$ 57,000.00$ 57,000.00$ 75,000.00$ 75,000.00
2Temporary Work Zone Traffic Control, Complete1LS$ 19,000.00$ 19,000.00$ 60,000.00$ 60,000.00
3Temporary Signs655SQFT$ 25.00$ 16,375.00$ 20.00$ 13,100.00
4Flaggers600HOUR$ 70.00$ 42,000.00$ 75.00$ 45,000.00
5Flagger Station Lighting3EACH$ 1,000.00$ 3,000.00$ 2,000.00$ 6,000.00
6Temporary Barricades, Type II12EACH$ 57.00$ 684.00$ 150.00$ 1,800.00
7Temporary Barricades, Type III4EACH$ 115.00$ 460.00$ 150.00$ 600.00
8Temporary Flexible Pavement Markers50EACH$ 2.00$ 100.00$ 1.50$ 75.00
9Temporary Pavement Bars14SQFT$ 30.00$ 420.00$ 12.00$ 168.00
10Stripe Removal190FT$ 5.00$ 950.00$ 4.00$ 760.00
11Bar Removal14SQFT$ 30.00$ 420.00$ 10.00$ 140.00
12Erosion Control1LS$ 800.00$ 800.00$ 40,000.00$ 40,000.00
13Matting, Type B60SQFT$ 0.50$ 30.00$ 80.00$ 4,800.00
14Sediment Fence100FT$ 4.00$ 400.00$ 20.00$ 2,000.00
15Pollution Control Plan1LS$ 1,500.00$ 1,500.00$ 7,500.00$ 7,500.00
16Lead Compliance Plan1LS$ 3,000.00$ 3,000.00$ 90,000.00$ 90,000.00
17Construction Survey Work1LS$ 17,000.00$ 17,000.00$ 60,000.00$ 60,000.00
18Removal of Surfacings350SQFT$ 7.00$ 2,450.00$ 15.00$ 5,250.00
19Removal of Structures and Obstructions1LS$ 1,500.00$ 1,500.00$ 25,000.00$ 25,000.00
20Asphalt Pavement Saw Cutting960FT$ 1.00$ 960.00$ 6.00$ 5,760.00
21Clearing and Grubbing1LS$ 5,000.00$ 5,000.00$ 7,500.00$ 7,500.00
22General Excavation545CUYD$ 57.00$ 31,065.00$ 195.00$ 106,275.00
23Drainage Geotextile, Type 2275SQYD$ 1.00$ 275.00$ 15.00$ 4,125.00
24Granular Drainage Blanket140TON$ 100.00$ 14,000.00$ 80.00$ 11,200.00
2518 Inch Culvert Pipe, 5 Ft Depth224FT$ 155.00$ 34,720.00$ 300.00$ 67,200.00
26Sloped End Section, 18 Inch1EACH$ 1,000.00$ 1,000.00$ 4,500.00$ 4,500.00
27Concrete Inlets, Type D (Modified)2EACH$ 2,200.00$ 4,400.00$ 8,000.00$ 16,000.00
28Filling Abandoned Structures1EACH$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00
29Cold Plane Pavement Removal 0-2 1/2 Inches Deep434SQYD$ 30.00$ 13,020.00$ 40.00$ 17,360.00
30Aggregate Base770TON$ 112.00$ 86,240.00$ 70.00$ 53,900.00
31Level 2, 1/2 Inch ACP Mixture275TON$ 370.00$ 101,750.00$ 275.00$ 75,625.00
32Extra for Asphalt Approaches5EACH$ 390.00$ 1,950.00$ 1,500.00$ 7,500.00
33Concrete Curbs, Curb and Gutter67FT$ 66.00$ 4,422.00$ 175.00$ 11,725.00
34Concrete Curbs, Standard Curb152FT$ 45.00$ 6,840.00$ 175.00$ 26,600.00
35Concrete Driveways279SQFT$ 20.00$ 5,580.00$ 50.00$ 13,950.00
36Concrete Walks2,840SQFT$ 15.00$ 42,600.00$ 40.00$ 113,600.00
37Extra for Curb Ramps5EACH$ 5,700.00$ 28,500.00$ 1,500.00$ 7,500.00
38Truncated Domes on New Surfaces51SQFT$ 36.00$ 1,836.00$ 100.00$ 5,100.00
39Mile Marker Post2EACH$ 220.00$ 440.00$ 300.00$ 600.00
40Field Facility Markers, Type S21EACH$ 100.00$ 100.00$ 300.00$ 300.00
41Longitudinal Pavement Markings - Paint1,730Foot$ 2.00$ 3,460.00$ 5.00$ 8,650.00
42Pavement Bars, Type B145SQFT$ 15.00$ 2,175.00$ 13.00$ 1,885.00
43Pavement Bars, Type B-HS126SQFT$ 15.00$ 1,890.00$ 13.00$ 1,638.00
44Crosswalk Closure Supports1EACH$ 550.00$ 550.00$ 5,000.00$ 5,000.00
45Remove Existing Signs1LS$ 1,250.00$ 1,250.00$ 5,000.00$ 5,000.00
46Remove and Reinstall Existing Signs1LS$ 1,300.00$ 1,300.00$ 10,000.00$ 10,000.00
47Sign Support Footings1CUYD$ 2,200.00$ 2,200.00$ 10,000.00$ 10,000.00
48Perforated Steel Square Tube Slip Base Sign Support774LB$ 6.00$ 4,644.00$ 8.00$ 6,192.00
49Signs, Standard Sheeting, Sheet Aluminum22SQFT$ 30.00$ 660.00$ 40.00$ 880.00
50Signs, Standard Sheeting, Plywood65SQFT$ 30.00$ 1,950.00$ 40.00$ 2,600.00
51Storage Pond1LS$ 4,500.00$ 4,500.00$ 35,000.00$ 35,000.00
TOTAL$ 578,366.00$ 1,082,358.00$ - 0$ - 0