Prelim Bid Results~38.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- ITB - Burnt Butte Cinder Pit Rock Production
- Solicitation number
- S-73000-00002414
- Issued by
- Jackson County, Cheshire CDP, Oregon
About this file
This is a preliminary bid results spreadsheet for the Mosier Creek Bridge Project (US 30: Mosier Connection Over UPRR), a state and local transportation infrastructure contract opportunity in Oregon. The project encompasses comprehensive bridge reconstruction and roadway improvements, including mobilization, traffic control, erosion management, excavation, drainage systems, culvert installation, pavement work, concrete improvements, signage, and site restoration. The solicitation attracted two bidders: JAL Construction, Inc., with a total bid of $578,366.00, and Granite Construction Company, with a total bid of $1,082,358.00. The project includes 51 distinct line items ranging from temporary work zone traffic control (estimated at $19,000-$60,000) to storage pond construction ($4,500-$35,000), with major cost items including general excavation, asphalt pavement installation, concrete walks, and culvert pipe installation. The estimated quantities reflect substantial construction scope, including 545 cubic yards of excavation, 770 tons of aggregate base, 275 tons of asphalt mixture, 2,840 square feet of concrete walks, and 224 feet of 18-inch culvert pipe.
The pricing structure utilizes fixed unit prices with total project pricing ranging from approximately $578,000 to $1.08 million depending on contractor selection. JAL Construction's bid represents the lower proposal, with significant pricing advantages on major cost items including general excavation ($57 per cubic yard versus $195), asphalt mixture ($370 per ton versus $275), and concrete walks ($15 per square foot versus $40). Granite Construction's bid reflects higher unit pricing across most line items, particularly for specialized items such as lead compliance planning ($90,000 versus $3,000) and erosion control ($40,000 versus $800). The preliminary bid results indicate that JAL Construction emerged as the apparent low bidder; however, the file does not specify contract award dates, incumbency status, funding sources, or set-aside designations for this specific project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Narrative Packet.pdf | ||
| Plans~10.pdf | ||
| Bid Cover Sheet~10.docx | DOCX document | |
| Invitation to Bid~40.docx | DOCX document | |
| Prelim Bid Results~44.xlsx | XLSX spreadsheet | |
| Sample Contract~14.docx | DOCX document | |
| Special Provisions~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| S-73000-00002416 US30: Mosier Conn Over UPRR – Mosier Creek Bridge Project | |||||
| PRELIMINARY BID RESULTS | JAL Construction, Inc. | Granite Construction Company | |||
| Bid Item # | Description | Est | |||
| QTY | UNIT | UNIT | |||
| PRICE | TOTAL | ||||
| PRICE | UNIT | ||||
| PRICE | TOTAL | ||||
| PRICE | UNIT | ||||
| PRICE | TOTAL | ||||
| PRICE | UNIT | ||||
| PRICE | TOTAL |
PRICE
| 1 | Mobilization | 1 | LS | $ 57,000.00 | $ 57,000.00 | $ 75,000.00 | $ 75,000.00 | ||
| 2 | Temporary Work Zone Traffic Control, Complete | 1 | LS | $ 19,000.00 | $ 19,000.00 | $ 60,000.00 | $ 60,000.00 | ||
| 3 | Temporary Signs | 655 | SQFT | $ 25.00 | $ 16,375.00 | $ 20.00 | $ 13,100.00 | ||
| 4 | Flaggers | 600 | HOUR | $ 70.00 | $ 42,000.00 | $ 75.00 | $ 45,000.00 | ||
| 5 | Flagger Station Lighting | 3 | EACH | $ 1,000.00 | $ 3,000.00 | $ 2,000.00 | $ 6,000.00 | ||
| 6 | Temporary Barricades, Type II | 12 | EACH | $ 57.00 | $ 684.00 | $ 150.00 | $ 1,800.00 | ||
| 7 | Temporary Barricades, Type III | 4 | EACH | $ 115.00 | $ 460.00 | $ 150.00 | $ 600.00 | ||
| 8 | Temporary Flexible Pavement Markers | 50 | EACH | $ 2.00 | $ 100.00 | $ 1.50 | $ 75.00 | ||
| 9 | Temporary Pavement Bars | 14 | SQFT | $ 30.00 | $ 420.00 | $ 12.00 | $ 168.00 | ||
| 10 | Stripe Removal | 190 | FT | $ 5.00 | $ 950.00 | $ 4.00 | $ 760.00 | ||
| 11 | Bar Removal | 14 | SQFT | $ 30.00 | $ 420.00 | $ 10.00 | $ 140.00 | ||
| 12 | Erosion Control | 1 | LS | $ 800.00 | $ 800.00 | $ 40,000.00 | $ 40,000.00 | ||
| 13 | Matting, Type B | 60 | SQFT | $ 0.50 | $ 30.00 | $ 80.00 | $ 4,800.00 | ||
| 14 | Sediment Fence | 100 | FT | $ 4.00 | $ 400.00 | $ 20.00 | $ 2,000.00 | ||
| 15 | Pollution Control Plan | 1 | LS | $ 1,500.00 | $ 1,500.00 | $ 7,500.00 | $ 7,500.00 | ||
| 16 | Lead Compliance Plan | 1 | LS | $ 3,000.00 | $ 3,000.00 | $ 90,000.00 | $ 90,000.00 | ||
| 17 | Construction Survey Work | 1 | LS | $ 17,000.00 | $ 17,000.00 | $ 60,000.00 | $ 60,000.00 | ||
| 18 | Removal of Surfacings | 350 | SQFT | $ 7.00 | $ 2,450.00 | $ 15.00 | $ 5,250.00 | ||
| 19 | Removal of Structures and Obstructions | 1 | LS | $ 1,500.00 | $ 1,500.00 | $ 25,000.00 | $ 25,000.00 | ||
| 20 | Asphalt Pavement Saw Cutting | 960 | FT | $ 1.00 | $ 960.00 | $ 6.00 | $ 5,760.00 | ||
| 21 | Clearing and Grubbing | 1 | LS | $ 5,000.00 | $ 5,000.00 | $ 7,500.00 | $ 7,500.00 | ||
| 22 | General Excavation | 545 | CUYD | $ 57.00 | $ 31,065.00 | $ 195.00 | $ 106,275.00 | ||
| 23 | Drainage Geotextile, Type 2 | 275 | SQYD | $ 1.00 | $ 275.00 | $ 15.00 | $ 4,125.00 | ||
| 24 | Granular Drainage Blanket | 140 | TON | $ 100.00 | $ 14,000.00 | $ 80.00 | $ 11,200.00 | ||
| 25 | 18 Inch Culvert Pipe, 5 Ft Depth | 224 | FT | $ 155.00 | $ 34,720.00 | $ 300.00 | $ 67,200.00 | ||
| 26 | Sloped End Section, 18 Inch | 1 | EACH | $ 1,000.00 | $ 1,000.00 | $ 4,500.00 | $ 4,500.00 | ||
| 27 | Concrete Inlets, Type D (Modified) | 2 | EACH | $ 2,200.00 | $ 4,400.00 | $ 8,000.00 | $ 16,000.00 | ||
| 28 | Filling Abandoned Structures | 1 | EACH | $ 2,000.00 | $ 2,000.00 | $ 2,000.00 | $ 2,000.00 | ||
| 29 | Cold Plane Pavement Removal 0-2 1/2 Inches Deep | 434 | SQYD | $ 30.00 | $ 13,020.00 | $ 40.00 | $ 17,360.00 | ||
| 30 | Aggregate Base | 770 | TON | $ 112.00 | $ 86,240.00 | $ 70.00 | $ 53,900.00 | ||
| 31 | Level 2, 1/2 Inch ACP Mixture | 275 | TON | $ 370.00 | $ 101,750.00 | $ 275.00 | $ 75,625.00 | ||
| 32 | Extra for Asphalt Approaches | 5 | EACH | $ 390.00 | $ 1,950.00 | $ 1,500.00 | $ 7,500.00 | ||
| 33 | Concrete Curbs, Curb and Gutter | 67 | FT | $ 66.00 | $ 4,422.00 | $ 175.00 | $ 11,725.00 | ||
| 34 | Concrete Curbs, Standard Curb | 152 | FT | $ 45.00 | $ 6,840.00 | $ 175.00 | $ 26,600.00 | ||
| 35 | Concrete Driveways | 279 | SQFT | $ 20.00 | $ 5,580.00 | $ 50.00 | $ 13,950.00 | ||
| 36 | Concrete Walks | 2,840 | SQFT | $ 15.00 | $ 42,600.00 | $ 40.00 | $ 113,600.00 | ||
| 37 | Extra for Curb Ramps | 5 | EACH | $ 5,700.00 | $ 28,500.00 | $ 1,500.00 | $ 7,500.00 | ||
| 38 | Truncated Domes on New Surfaces | 51 | SQFT | $ 36.00 | $ 1,836.00 | $ 100.00 | $ 5,100.00 | ||
| 39 | Mile Marker Post | 2 | EACH | $ 220.00 | $ 440.00 | $ 300.00 | $ 600.00 | ||
| 40 | Field Facility Markers, Type S2 | 1 | EACH | $ 100.00 | $ 100.00 | $ 300.00 | $ 300.00 | ||
| 41 | Longitudinal Pavement Markings - Paint | 1,730 | Foot | $ 2.00 | $ 3,460.00 | $ 5.00 | $ 8,650.00 | ||
| 42 | Pavement Bars, Type B | 145 | SQFT | $ 15.00 | $ 2,175.00 | $ 13.00 | $ 1,885.00 | ||
| 43 | Pavement Bars, Type B-HS | 126 | SQFT | $ 15.00 | $ 1,890.00 | $ 13.00 | $ 1,638.00 | ||
| 44 | Crosswalk Closure Supports | 1 | EACH | $ 550.00 | $ 550.00 | $ 5,000.00 | $ 5,000.00 | ||
| 45 | Remove Existing Signs | 1 | LS | $ 1,250.00 | $ 1,250.00 | $ 5,000.00 | $ 5,000.00 | ||
| 46 | Remove and Reinstall Existing Signs | 1 | LS | $ 1,300.00 | $ 1,300.00 | $ 10,000.00 | $ 10,000.00 | ||
| 47 | Sign Support Footings | 1 | CUYD | $ 2,200.00 | $ 2,200.00 | $ 10,000.00 | $ 10,000.00 | ||
| 48 | Perforated Steel Square Tube Slip Base Sign Support | 774 | LB | $ 6.00 | $ 4,644.00 | $ 8.00 | $ 6,192.00 | ||
| 49 | Signs, Standard Sheeting, Sheet Aluminum | 22 | SQFT | $ 30.00 | $ 660.00 | $ 40.00 | $ 880.00 | ||
| 50 | Signs, Standard Sheeting, Plywood | 65 | SQFT | $ 30.00 | $ 1,950.00 | $ 40.00 | $ 2,600.00 | ||
| 51 | Storage Pond | 1 | LS | $ 4,500.00 | $ 4,500.00 | $ 35,000.00 | $ 35,000.00 | ||
| TOTAL | $ 578,366.00 | $ 1,082,358.00 | $ - 0 | $ - 0 |
File details come from the government source that posted it. Updated .