Pre-Bid Sign in sheet 10_21_26.pdf
PDF 262 KB Posted
- Solicitation number
- S-63400-00018017
- Issued by
- Marion County, Oregon
About this file
This is a Pre-Bid Sign-In Sheet for ITB #14709, a water supply well replacement project at Silver Falls State Park managed by the Oregon Parks and Recreation Department (OPRD). The project involves the design and installation of replacement water supply well systems at two locations (north and south well sites) within Silver Falls State Park near Silver Falls Highway SE. The scope of work includes site preparation, well drilling to specified depths, casing and screen installation, pump selection and installation, water quality testing, system pressure and flow-rate verification, well development, disinfection procedures, connection to existing distribution infrastructure, and abandonment of the existing well. A voluntary pre-bid conference was scheduled for October 13, 2026 at 10:00 a.m. PST at the park, with bids due November 2, 2026. The contract will be awarded to the lowest responsive and responsible bidder meeting all technical requirements, with engineered plans and drawings prepared by Keller Associates, Inc. under Project Manager Luke Tabor, PE, dated August 2026.
All work must comply with American Society for Testing and Materials (ASTM) standards and Oregon Department of Water Resources regulations. Bidders must submit detailed cost proposals covering labor, equipment, materials, and mobilization expenses, along with submittals demonstrating compliance with technical specifications prior to equipment installation. All testing results and abandonment documentation must be submitted upon project completion. The water-supply well system must meet defined performance standards for well construction, casing materials, screen specifications, grout requirements, pump capacity, water quality acceptance criteria, and system pressure requirements to ensure adequate supply for park operations. The project is funded through Oregon's capital improvement budget allocated to Silver Falls State Park operations and maintenance. The OPRD Project Manager is Jason Brateng, and the Park Manager is Jason Wagoner. An Inadvertent Discovery Plan has been established to address protocols for archaeological finds and human remains.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .