ITB 14709 Questions and Answers updated Oct 26.docx
DOCX document 23 KB Posted
- Solicitation number
- S-63400-00018017
- Issued by
- Marion County, Oregon
About this file
This document is a Questions and Answers clarification file issued by the Oregon Parks and Recreation Department (OPRD) for ITB #14709, concerning the Silver Falls State Park Water Supply Well Replacement project. The project involves replacement of water supply wells at two sites—North Well and South Well—within Silver Falls State Park, with construction activities including site preparation, well drilling, casing and screen installation, pump selection and installation, water quality testing, and proper abandonment of existing wells. The solicitation required bids by November 2, 2026, with a voluntary pre-bid conference held on October 13, 2026. The project encompasses two well locations accessible via locked gates, with the North Well accessed off the south side of Highway 214 approximately 0.25 miles west of the North Falls parking lot, and the South Well accessed via Lookout Mountain Road. Both sites will remain accessible during the rainy season and require restoration of temporary modifications, such as fencing, to preconstruction conditions upon project completion.
Key clarifications address operational and technical requirements, including authorization to use up to 3,000 gallons per day of park water during drilling operations, temporary removal of fencing around well sites with required restoration, management of drill cuttings per Technical Specifications Section 01560, discharge of well water to vegetation areas west of each well location approximately 75 feet away per Section 01360, and handling of equipment such as generators. The document confirms that well pump costs should be incorporated into line items A16 for the North Well and A30 for the South Well, with detailed work and materials specifications referenced in Technical Specifications Section 01025. Professional liability, pollution, and Directors and Officers liability insurance are not required. The North Well's existing motor control panel will be replaced while the South Well's panel will be retained, and any road access work outside the construction site boundary requires preapproval by the Project Manager and will be performed at no expense to the state. The project is not subject to the Buy America Act or other federal sourcing restrictions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB 14709
SILVER FALLS STATE PARK
WATER SUPPLY WELL REPLACEMENT (Updated 10/26/26)
CLARIFICATIONS AND RESPONSE(S) TO QUESTIONS
The following provides OPRD’s answers to questions received from potential Bidders. The information provided below is for clarification purposes only and does NOT constitute a change to the solicitation documents or requirements.
QUESTIONS
Q1. Can the fence around the well be taken down temporarily?
A1. Yes, the fence can be taken down temporarily. It will need to be reinstalled to its preconstruction condition as soon as possible after construction.
Q2. Can drill cuttings remain on premises?
A2. Yes, please refer to the Technical Specifications section 01560 – Environmental Controls, part 3.11 – Drill Cuttings, for more information.
Q3. Can the park’s water be used during the drilling process?
A3. As long as park operations are not hindered, up to 3000 gallons/day can be used. There is a hydrant at the South Well but not the North Well. There are hose bibs at both locations.
Q4. What process should be used for abandoning the old wells?
Q4. Please refer to the Technical Specifications section 332900.
Q5. What is the access, ingress and egress to both the North & South well sites?
A5. The North Well’s access is off the south side of highway 214, about .25 miles west of the North Falls parking lot. The South Well is accessed off Lookout Mountain road past the 214 trailhead. Both wells are behind locked gates with only one way in and out. A key to the gates can be checked out during construction.
Q6. Can an in-ground spoils pit be dug to contain the drill cuttings generated during the well construction?
A6. We would prefer the spoils to be dealt with as per the Technical Specifications section 01560 – Environmental Controls, part 3.11 – Drill Cuttings.
Q7. Can well water be discharged to a vegetation area adjacent to each well site?
A7. Yes, please refer to the Technical Specifications section 01360 – Environmental Controls, 3.12 Water Management and Turbidity Reduction. Discharge points will be just west of each of the well locations (approximately 75’).
Q8. Will both well sites be accessible during the rainy season?
A8. Yes.
Q9. During the 24 hours aquifer testing, where will the discharge water go?
A9. For discharged water, please refer to the Technical Specifications section 01360 – Environmental Controls, 3.12 Water Management and Turbidity Reduction. Discharge points will be just west of each of the well locations (approximately 75’).
Q10. In the Technical Specs, there is a section describing well pumps; however, there is not a line item on the bid sheet for the well pumps.
A10. Please incorporate the well pump price for the North Well in line item A16 (Well Facility Improvements – North Well 1). Please incorporate the well pump price for the South Well in line item A 30 (Well Facility Improvements – South Well). For a full list of items that should be incorporated in those bid items, please refer to the Bid Items, Measurement and Payment section of the Technical Specifications.
Q11. Can you elaborate in further detail what work and materials are anticipated to be included in A15, A16, A29, & A30?
A11. For information on what to include in each bid item, please refer to the Technical Specifications Section 01025 – Measurements and Payment. Please make sure all work and materials for the project are included in one of the bid items provided.
Q12. Can you confirm if professional liability, pollution and/or D & O insurance is required of the contractor? There is a mention of this under the Additional Insurance language.
A12. Professional Liability, Pollution, and Directors and Officers Liability are not applicable for this contract.
Q13. Can the generator at the South Well location be temporarily removed if a portable generator is on-site and connected?
A13. No, the generator cannot be temporarily removed.
Q14. I am unable to find Attachment 1, Exhibit B as referenced in 3.12e, under Environmental Controls.
A.14 The drawings do not specifically include a designated discharge area. The text referenced in the question may be a relic of the template.
The discharging area for the North Well is marked "Drain" to the west of the reservoir on Drawing C-101-N. The discharging area for the South Well is west of the fence and the generator pad in Drawing C-101-S.
Q15. Does this project consist with any AIS, Buy America act?
A15. No, this project is not subject to the Buy America Act, or any other federal restrictions on sourcing products or materials.
Q16. On the North well, road access may need a little brush clearing and road work done before long trucks can access the well site. This is outside of construction site boundary. Who is responsible for this work?
A16. The park will be doing brush work around the North Well house for better access during the project. They will be able to brush out any areas along the road that prevents equipment’s access to the project area.
Any suggested road work must be preapproved by the Project Manager and will be done at no expense to the state.
Q17. Are the new pumps and motors being connected to the existing motor control system? If anything is getting replaced or updated, please add some clarity in those items.
A17. Sheet E-101-S and section 406700 in the technical specification shows the existing motor control panel will be retained for the South Well. Sheet E-101-N and section 406700 in the technical specification shows the existing motor control panel will be replaced for the North Well. Please refer to the plans and specs for additional information.