This document is an Addendum (No. 002) dated 07/28/2023 for the Heritage Shores Nature Preserve Walkway and Dock Repair project (Solicitation Number 2023-014AB) by the City of North Myrtle Beach, South Carolina. The addendum covers details from a pre-bid meeting held on Tuesday, July 25, 2023, and provides clarifications for marine construction contractors bidding on the project. Key instructions include using the BidNet Direct website for all communications, specifying costs outside the original bid request, and addressing the structural assessment of existing piles. Bidders are required to determine the condition of existing piles and include separate pricing for potential replacements or repairs.

The document includes specific technical requirements, such as a mandatory prohibition on using concrete slats and a requirement to use stainless steel (SS) for all nails, bolts, screws, and connectors that may contact treated lumber. The city emphasizes minimizing corrosion from ACQ treatment chemicals and requires contractors to use stainless steel materials, with a requirement to communicate in writing if such materials are unavailable. The pre-bid meeting attendance sheet shows representatives from the City of North Myrtle Beach and several construction companies, indicating potential interest in the marine infrastructure repair project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM 002

Date: 07/28/2023

Solicitation Number: 2023-014AB

Project: Heritage Shores Nature Preserve Walkway and Dock Repair

From: Amber Bell

(843) 280-5696 acbell@nmb.us

Clarification and Additional Information

1. As discussed at the pre-bid meeting, bidders will utilize the BidNet Direct website for all communications. Including, but not limited to questions, comments, submissions, or award documentation.

2. The pre-bid meeting attendance sheet will be included herein.

3. Please specify specific costs in the bid package if the cost is outside the realm of the bid request or included in any addendums.

4. Please keep in mind the following per the SCOPE OF WORK section in the referenced bid package:

• “…..it is the Bidder’s Responsibility to determine if the existing piles are structurally sound and capable of supporting the new structure discussed herein.”

• “If the bidder believes the existing piles are in need of replacement, repair, or otherwise, the bidder should include separate pricing within the bid.”

5. You can find questions and answers on the BidNet Direct website within the Addendum section.

mailto:acbell@nmb.us

Questions submitted by Bidders during the Pre-Bid Meeting

Q1: Can contractors use concrete slats?

A1: No.

Q2: Does the City of NMB have a preference of using HOT DIPPED GALVANIZED (HDG) or

STAINLESS STEEL (SS)?

A2: Yes, please use STAINLESS STEEL (SS).

The Structural plans, sections, & notes 2023-014AB Heritage Shores Walkway and

Dock Repair include the following note:

NOTE: ON TREATED LUMBER CONNECTIONS – ALL NAILS, BOLTS,

SCREWS, AND CONNECTORS THAT MAY COME INTO CONTACT WITH

TREATED LUMBER WILL BE HOT DIPPED GALVANIZED (HDG), STAINLESS

STEEL (SS), OR OTHER APPROVED MATERIALS TO MINIMIZE CORROSION

CAUSED BY ACQ TREATMENT CHEMICALS.

The City of NMB requests the contractor to use only stainless-steel nails, bolts, screws, and connectors. If stainless steel materials are unavailable, winning bidder must communicate to owner in writing the inaccessibility, and the City will require further approval to proceed.

Q3: Can you provide some more information pertaining to the cross bracing?

A3: Yes. Please find the details in the attachment titled Cross Bracing SS Drawing - 2023-

014AB Heritage Shores Nature Preserve Walkway and Dock Repair.

EXISTING PILES

BLOCK BETWEEN BRACING &

FASTEN W/ (1) 34"Ø SS BOLTS

TRT 2x8

X-BRACING (TYP)

W/ (1) 3

4"Ø SS

BOLTS @ END

(2) 34"Ø SS

BOLTS @ PILE

CAP BEAMS

TRT 2x8 FOR 4'-0"

WALKWAY WIDTHS

TRT 2x10s FOR > 4'-0"

WALKWAY WIDTHS.

MAXIMUM OF 6'-0"

WALKWAY WEIGHT

11655 HIGHWAY 707

MURRELLS INLET, SC 29576

843.651.7900

(FAX) 843.651.7903

www.earthworksgroup.com

EARTHW RKS

DRAWING NAME: C:\Users\bbellamy\AppData\Local\Temp\AcPublish_13560\221302.000.dwg TAB 8.5x11 Jul 27, 2023 - 4:16pm BBellamy

ALL RIGHTS RESERVED! Disclaimer: The EARTHWORKS Group is hereby known as EW Inc. The User agrees not to use this document, in whole or part, for any purpose or project other than the project, which is the subject of this Agreement. User agrees to waive all claims against EW Inc. resulting in any way from unauthorized changes or reuse of this document by anyone other than EW Inc. In addition, User agrees, to the fullest extent permitted by law, to indemnify and hold EW Inc. harmless from any damage, liability or cost, including reasonable attorney's fees and costs of defense arising from any changes made by anyone other than EW Inc. or from any reuse of the document without the prior written consent of EW, Inc. or the purchaser. This item may not be copied in whole or in part without the express written consent from EW, Inc. or the purchaser. This drawing, and the design shown, is the property of EW. The reproduction or use of this drawing without the architect's/engineer's written consent is prohibited and any infringement is subject to legal action.

REV

BYDESCRIPTIONDATE REV

BYDESCRIPTIONDATE

ADDITIONS, SUBMITTALS, & REVISIONS

HERITAGE SHORES PILE CAP CROSS BRACING

PROJECT #:

DATE:

221302.001

7/27/2023

5811 HERITAGE DR.

NORTH MYRTLE BEACH, SC 29582

PREPARED FOR:

CITY OF NORTH MYRTLE BEACH

SHEET NAME

SK# 07/27/2023 ISSUED FOR PERMIT BKB

NOTE:

RAIL OMITTED FOR CLARITY

Sheets and Views
221302.000-8.5x11
ADP3E15.tmp
ADDENDUM 002
Clarification and Additional Information
Questions submitted by Bidders during the Pre-Bid Meeting

File details come from the government source that posted it. Updated .