Pre-Bid Meeting Attendance Summary
This is a pre-bid meeting attendance document for Collin County, Texas related to IFB 2026-389, a construction project to replace institutional sprinkler heads at the Collin County Jail in McKinney. The project involves replacing all existing sprinklers in inmate cells within Clusters 1, 3, 4, and 5 with new Tyco Raven sprinklers designed in accordance with NFPA 13 requirements. Two mandatory pre-bid meetings were scheduled for October 26, 2026 at 10:30 a.m. and October 29, 2026 at 1:00 p.m., both held at the Collin County Justice Center, 4300 Community Avenue, McKinney, with attendance required for bid participation. Sealed bids were due November 19, 2026 at 2:00 p.m., with public bid opening occurring the same day at the Collin County Purchasing Department, 2300 Bloomdale Road, Suite 3160, McKinney. The Notice to Proceed requires work commencement within ten consecutive calendar days, with liquidated damages of $500 per calendar day assessed for failure to meet the completion deadline. Contract award was anticipated within ninety consecutive calendar days after bid opening.
The opinion of probable construction cost is $150,000. Bid security equal to 5 percent of the total bid amount is required before bid opening, with performance, payment, and one-year maintenance bonds required upon award. Prevailing wage requirements under Texas Government Code Title 10, Chapter 2258 apply to this project. Comprehensive insurance requirements include workers' compensation, commercial general liability with a $2 million general aggregate minimum, automobile liability of $1 million combined limit, and umbrella liability of $2 million per occurrence and aggregate, with all policies naming Collin County as additional insured. Collin County is exempt from state sales tax and federal excise tax, and contractor pricing should exclude these taxes. The contractor must comply with E-Verify employment eligibility verification requirements and file a Texas Ethics Commission Conflict of Interest Questionnaire with the county records administrator no later than the seventh business day after disclosure-triggering facts become known.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Construction,_CCADF_Sprinkler_Heads_Replacement_(Addendum_#2_Revision).pdf | ||
| Drawing_and_Plan.pdf | ||
| Construction,_CCADF_Sprinkler_Heads_Replacement.pdf | ||
| 206.07.15_CCADF_Sprinkler_Head_Replacement_Specifications_Book.pdf | ||
| LEGAL_NOTICE-2026-389.pdf | ||
| Construction_Agreement.docx | DOCX document | |
| Bid_Bond.doc | DOC document | |
| W9.pdf | ||
| Maintenance_Bond.pdf | ||
| Construction_Agreement_Architect_2.12.25.docx | DOCX document | |
| 004325_Product_Substitution_Request_Form.docx | DOCX document | |
| Payment_Bond.pdf | ||
| Performance_Bond.pdf | ||
| 004547-Conflict_of_Interest.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid Meeting Attendance-1 SKM_450i17122902250
File details come from the government source that posted it. Updated .