Pre Bid Conference Q and A ISD Video Scoreboard 07.20.26.docx
DOCX document 14 KB Posted
- Attached to
- SP ISD-Video Scoreboard
- Solicitation number
- 27-444DHS-ISDIS-B-53297
- Issued by
- Illinois
About this file
This document is a Pre-Bid Conference Q&A for the SP ISD-Video Scoreboard project (Bid 27-444DHS-ISDIS-B-53297) conducted by Illinois School for the Deaf. The project involves the procurement and installation of a full-color LED video display, standard scoreboard, and associated equipment within the school's gymnasium. The LED video display will be mounted on the east wall of the gym, while the standard scoreboard will be positioned on the west wall. Shot-clocks are to be installed on the backboards, and the server rack will be located west of the stage. The scoreboard system will be integrated with the existing sound system. Illinois School for the Deaf staff will be responsible for the installation of electric and low-voltage pathways, while the vendor will be responsible for the installation of the video display and scoreboard equipment.
The Pre-Bid Conference Q&A document addresses critical technical and logistical questions raised by prospective bidders regarding project specifications and installation responsibilities. This clarification document indicates that multiple vendors submitted inquiries prior to bid submission, demonstrating active market interest in the opportunity. The document provides essential coordination details between the school district and the selected vendor regarding infrastructure support, equipment placement, and system integration requirements necessary for successful project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW Indoor Video Scoreboard~5.docx | DOCX document | |
| standard-terms-and-conditions 8-18-25~5.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid Conference Q&A SP ISD-Video Scoreboard
27-444DHS-ISDIS-B-53297
Question 1- Where will the LED video display and scoreboard be located in the gym.
Answer- The full color LED video display will be located on the east wall of the gym. The standard scoreboard will be located on the west wall of the gym Question 2- Who will be responsible for the electric and low voltage pathways installation?
Answer- ISD staff will be responsible for installation of electric and low voltage pathways.
Question 3- Where will the shot-clocks need to be located?
Answer- The shot-clocks will be located on the backboards.
Question 4- Will the scoreboard need to be tied into the sound system?
Answer- The scoreboard will need to be tied into the sound system.
Question 5- Where will the server rack be located?
Answer- The server rack will be located west of the stage.
File details come from the government source that posted it. Updated .