PRE-AWARD SURVEY - DRAFT.xlsx
XLSX spreadsheet 156 KB Posted
- Solicitation number
- FA8606-21-R-0010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW - MFDU LRIP - DRAFT.pdf | ||
| SECTION L - MFDU LRIP - DRAFT.pdf | ||
| PURCHASE DESCRIPTION - MFDU LRIP - DRAFT.pdf | ||
| Comments Resolution Matrix.xlsx | XLSX spreadsheet | |
| MODEL CONTRACT - MFDU LRIP - DRAFT.pdf | ||
| SECTION M - MFDU LRIP - DRAFT.pdf | ||
| TEP - MFDU LRIP - DRAFT.xlsx | XLSX spreadsheet | |
| CDRL PACKAGE - MFDU LRIP - DRAFT.pdf | ||
| FIELDING PLAN - MFDU LRIP - DRAFT.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Survey Instuctions
| Solicitation: FA8606-21-R-0010 Air Force Life Cycle Management Center Human Systems Division Section L - Pre-Award Survey |
| Pre-Award Survey Instructions |
| 1. Read each question in column B |
| 2. Provide a yes or no (Y/N) response (in column C) to the question in column B as it applies to your situation. |
| 3. Provide supporting justification for your column C (Y/N) response in column D; |
| 4. For negative (N) responses, provide your mitigation plan (in column D) for achieving the requirement prior to initial kit audit. |
| 5. If you require additional space to complete your justification, you may use the Survey Additional Responses tab as needed. |
In column A, identify which question your supplemental response(s) pertain to by question number. Be as descriptive as needed to support column C responses and ensure evaluators understand your capabilities as they pertain to this effort.
6. The Pre-Award Survey responses should be concise with allowing the evaluator enough information to make an reasonable risk determination.
Pre-award survey
| # | Question | ANS | |
| (Y/N) | Justification, Evidence of Compliance, or Response Substantiation | ||
| 1 | Are all required sources (of materials, components, sub-assemblies, etc.) available? | ||
| 2 | Is the supply chain adequate to support the production contract? | ||
| 3 | Has your company completed an assessment of the supply chain (capabilities, CoCs, schedule, supply base, etc.)? | ||
| 4 | Has your company completed the Make/Buy decisions to support the production effort? | ||
| 5 | Has your company identified external manufacturing partners and/or sources capable of supporting the production effort? | ||
| 6 | Has your company completed an assessment of the potential external manufacturing sources (capabilities, capacity, schedule, supply base, etc.)? | ||
| 5 | Have the critical manufacturing processes for similar products been demonstrated in production? (i.e. felling machine) | ||
| 6 | Have manufacturing process yields and rates required to support the program schedule and delivery requirements been established? | ||
| 7 | Does your company have a robust and disciplined requirements (SOW, FAR, DFARS, ISO 9001, etc.) flow-down process to the supply chain in place? | ||
| 8 | Has your company assessed supply chain compliance with the Maternity Flight Duty Uniform (MFDU) Program Performance Specification requirements? | ||
| 9 | Has a program-specific Quality Plan and Quality Manager been established? | ||
| 12 | Has your company completed initial Test and Inspection Plans for the first production lot (e.g. wire harness continuity test)? | ||
| 10 | Has your company identified manufacturing workforce resource requirements for the initial production lot? | ||
| 11 | Are your company's manufacturing facilities adequate to support the initial production lot? Describe facility layout and discuss proposed MFDU manufacturing line (i.e. Existing? New?) | ||
| 12 | Describe your workplace safety protocols; include additional COVID-19 measures. | ||
| 13 | Have all key manufacturing risks been identified and assessed? Describe approved and ongoing mitigation plans. | ||
| 14 | Have work instructions been developed? | ||
| 15 | Do you have the appropriate sewing or manufacturing equipment available to complete stitches/construction requirements as specified in the purchase description (Section 3, Section 3-Table VI)? | ||
| 16 | What material/enterprise resource (MRP/ERP) planning systems will be available or utilized for the production effort? |
Survey Additional Responses # Justification, Evidence of Compliance, or Mitigation Plan image1.emf image2.emf