CDRL PACKAGE - MFDU LRIP - DRAFT.pdf

PDF 627 KB Posted

Attached to
Maternity Flight Duty Uniform (MFDU) Low Rate Initial Production (LRIP) DRAFT RFP
Solicitation number
FA8606-21-R-0010
Issued by

View the file

Other files

File Type Posted
SOW - MFDU LRIP - DRAFT.pdf PDF
SECTION L - MFDU LRIP - DRAFT.pdf PDF
PURCHASE DESCRIPTION - MFDU LRIP - DRAFT.pdf PDF
Comments Resolution Matrix.xlsx XLSX spreadsheet
MODEL CONTRACT - MFDU LRIP - DRAFT.pdf PDF
SECTION M - MFDU LRIP - DRAFT.pdf PDF
TEP - MFDU LRIP - DRAFT.xlsx XLSX spreadsheet
PRE-AWARD SURVEY - DRAFT.xlsx XLSX spreadsheet
FIELDING PLAN - MFDU LRIP - DRAFT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3/3/2021 6:02:08 PM CST

CDRL Table of Contents

CONTRACT DATA REQUIREMENTS LIST (CDRL)

GENERAL NOTES

Maternity Flight Duty Uniform (MFDU)

12 April 2021

RFP FA8606-21-R-0010

1.0 SCOPE

This Contract Data Requirements List (CDRL) establishes the data to be delivered by the contractor and the submittal, approval and distribution requirements of all the CDRL data items contained herein.

2.0 GENERAL

The Data Item Descriptions (DIDs) specified in the CDRL are available electronically at the DLA Document Services website: http://quicksearch.dla.mil/ .

3.0 DATA DELIVERIES

3.1 Delivery Dates

Unless otherwise specified in Block 16 of the CDRL, all references to “days” will refer to calendar days.

a. If a CDRL delivery date falls on a Saturday, the submittal must be delivered on the Friday prior to the Saturday delivery date.

b. If the CDRL delivery falls on a Sunday, the submittal must be delivered on the Monday following the Sunday delivery date.

c. If the CDRL delivery falls on a holiday, the submittal must be delivered on the day before the holiday.

d. Early CDRL delivery is permitted. The Contractor must notify the Government of late CDRL deliveries.

3.2 Tailored Data Items

Presence of A slash (/) and the letter "T" (e.g., DI-CMAN-810111A/T) added to the end of the DID number in Block 4 of the DD Form 1423 denotes that the DID has been tailored to comply with specific system/program requirements.

Tailoring instructions are as described in Block 16 of each CDRL. If the data preparation instructions contained in Block 16 of the CDRL are different than the instructions contained in the DID, the CDRL shall govern.

3.3 Approval of Data

The symbols in Block 8 of the DD Form 1423-1 denote the following:

1) "A" denotes USAF approval of the data is required.

2) "N" denotes no approval is required.

3) “16” denotes additional instructions are noted in Block 16 of the CDRL.

a. The USG will respond to the Contractor within Fifteen (15) days after receipt for any data that has been determined by the USG as being deficient and/or technically disapproved. Data submittal requirements shall not be considered to have been met until the procuring agency has determined that all contractual requirements have been satisfactorily met regarding the identified data.

b. For those CDRLs with "N/A", or “N” in Block 8, Government approval of the content is not required; however, compliance with data item format and content requirements as specified in the DID, and as tailored in Block 16 of the CDRL, is mandatory. The government will not provide a formal response back to the contractor; however, the http://quicksearch.dla.mil/

Government has the right to disapprove any data submittal(s) not in compliance with DID or contract requirements.

c. Unless otherwise specified, the Office of Primary Responsibility (OPR) designated in Block 6 of the DD Form 1423-1 will respond through USG contracting officer to the contractor with comments/recommendations or as directed by block 8, formal disposition.

3.4 Resubmittal of Data

If resubmittal of a CDRL is required, the contractor shall incorporate recommended changes/revisions and resubmit identified document within fifteen (15) days after receipt of such comments/recommendations unless otherwise noted in the formal response. The document revision indicator shall be identified on the title page of the data item, on each page, and on a summary of document changes section contained within the document. Tracked changes or change bars shall be utilized to obtain Government approval of revised documents; however, final submittal will not contain mark-ups.

3.5 Final Submittal of Data

For the final delivery of each data item in the contract/delivery order, the contractor shall clearly state in the Letter of Transmittal (LOT), as defined in paragraph 5.0, that this delivery is the last submittal, and that all contractual requirements concerning that data item have been fulfilled.

3.6 DD Form 250 Requirements

Block 7 of the CDRL directs the method of submittal - individual DD Form 250s are required only if indicated in Block

7. All other submittals shall be via a Letter of Transmission (LOT)..

3.7 Classified Data

Classified data shall be submitted in accordance with the requirements established by the DD Form 254. The contractor shall contact the PCO for the mailing addresses for classified data.

3.8 Modification of Data Requirements

a. From time to time, during the performance of this contract, the Contracting Officer unilaterally may change the place of delivery and the technical office for any line item of contract Exhibits (DD Form 1423) hereto, at no change in contract price, notwithstanding the provision of the changes clause, of the current contract. If there is a change in the place of delivery, the Contractor and the Contracting Officer may mutually agree to an extension of the data submittal requirement date.

b. From time to time, during the performance of this contract, the PCO may unilaterally increase or decrease the number of addresses and/or increase or decrease the number of hard copy deliverables (regular or reproducible) specified for any data item of the CDRL. The contractor reserves the right to analyze the cost impact and negotiate an equitable adjustment for such fluctuations in requested deliverables.

4.0 ELECTRONIC DATA TRANSMISSION

a. The contractor shall submit all data deliverables in accordance with the specific submittal instructions indicated in Blocks 10-16 of each CDRL and Statement of Work (SOW). The versions of the software used for electronic data transmission shall remain compatible with current program office software. Where applicable, all electronic data shall be delivered using the Microsoft Office product suite and/or Microsoft Project Tools. Any submittals by other means shall require program office approval prior to delivery of data. All documents delivered PDF will be in searchable format.

5.0 LETTERS OF TRANSMITTAL (LOT)

a. All data deliveries shall include a LOT. The LOT may be in the form of a letter or e-mail from the designated contractor representative. As a minimum, the LOT shall contain:

1) Contractor’s POC

2) Contractor’s address

3) Date

4) Contract number and program name

5) Letter Control Number

b. Contractor shall ensure when entering data into MEARS all fields are completed

6) LOT Number

7) LOT Date

8) Contractor Document Number

9) Contractor Document Date

10) Revision Number

11) Version Number

12) Classification

13) Media (if using MEARS this would reflect “ONLINE”) Additional information may be included that aids in the processing of submittals.

7.0 MARKING TECHNICAL DOCUMENTATION

7.1 Distribution Marking System:

a. A Department of Defense (DoD) distribution marking system for technical data is prescribed in DoD Instruction 5230.24, “Distribution Statements on Technical Documents,”. The intent of the system is to identify the audience approved for secondary distribution of the data in order to stem the flow of military-related technical data to our adversaries, without inhibiting technological growth or appropriate exchange of technical data that is vital to progress and innovation. In addition, authority to withhold and controll the export of certain technical data with military or space application is determined in accordance with Title 10, United States Code section 130 and implemented by DODD

5230.25. The contractor shall mark technical data as instructed by the Government program office with the appropriate distribution statement and the export-control warning, as appropriate, on all technical data to denote the extent of its availability for secondary distribution, release, and disclosure without need for additional approvals and authorizations from the controlling DoD office. These markings are in addition to any security classification or other control markings,

b. Distribution statements have been annotated in Block 9 of each CDRL and defined in paragraph 7.2 below. If the contractor feels that a different statement or reason is required, he must notify the contracting officer with the recommended statement. The Government will review the request and determine which statement is the most appropriate and provide the contractor with an acceptance of the change or reason for not accepting the contractor’s request for change.

7.2. Marking Technical Data

a. The contractor shall mark all technical information, regardless of its medium, with the appropriate distribution statement as prescribed by the controlling DoD office. This includes technical reports, blueprints, drawings, technical orders, technical manuals, plans, instructions, computer software, film, technical papers, photographs, etc. If the document contains export-controlled technical data, it shall also be marked with the export control warning statement prescribed in DODI 5230.24. Distribution statements are also applied to technical data that contain proprietary information used.

b. Technical data categorized as cryptographic/communications security, communications/electronic intelligence, and similar categories as may be designated by the Director, National Security Agency, whose distribution is limited through alternate methods, are exempt from these marking provisions.

c. Certain types of technical data preclude placing the entire notice on the document. To accommodate this problem, each distribution statement contains an authorized abbreviation form. Abbreviated distribution statements are to be used only when space precludes placing the entire notice on the document. The use and wording of these statements are described in the following paragraphs.

7.3. Distribution Statement

The following distribution statement, IAW Block 9 of the CDRL, must appear on the front, self-cover and/or title page of each technical document submitted, including the first sheet of each drawing.

Sample:

7.4 Controlling DoD Office

The following address will be used on all documentation for the “controlling DoD office” for this program:

AFLCMC/WNU, 1981 Monahan Way, Bldg 12 Wright Patterson AFB Oh 45433-7205

Questions concerning technical content should be directed to AFLCMC/WNU.

7.5 Export-Controlled Warning Statement

DODD 5230.25 implements Title 10 U.S.C. section 130, “Authority to withhold from public disclosure certain technical data” with military or space application in the possession of, or under the control of, the Department of Defense, if such data may not be exported lawfully outside the United States without an approval, authorization, or license under the Export Administration Act of 1979 or the Arms Export Control Act (both cited in the Export Control Warning). Such withholding and export control applies to Defense items listed in the United States Munitions List (USML), (which is part of the “International Traffic in Arms Regulations (ITAR),”—22 CFR 120-130); and 15 CFR 730-774 (the “Export Administration Regulations (EAR)”).

Export Controlled technical documents, printed, electronic, and digital, that contain export-controlled technical data shall be marked with the Export Control Warning provided in the box below. When it is infeasible to use the entire statement, the abbreviated warning may be used, and a copy of the full warning added to the “Notice to Accompany the Dissemination of Export-Controlled Technical Data,” which is Enclosure E5 of DoDD 5230.25. For assistance in determining what is export controlled, you may consult the local Government agency’s Foreign Disclosure Office.

DISTRIBUTION STATEMENT D – Distribution authorized to Department of Defense and U.S DoD Contractors only(Administration and Operational Use)(17 August 2019) Other requests shall be referred to: AFLCMC/WNU Procuring Agency Data Management Office (AFLCMC/WNU (CM/DM), WRIGHT-PATTERSON AFB OH 45433- 7200).

In addition to a distribution statement, the marking system also requires the use of a warning notice on all documents that contain export-controlled technical data in accordance with DODD 5230.25. The notice may be used in conjunction with the five controlled distribution statements (“B”, “C”, “D”, “E”, and “F”). Statement “A”, which denotes public release, cannot be used in conjunction with the export-control warning notice.

7.6 Destruction

Notice All unclassified technical data marked with distribution statements “B”, “C”, “D”, “E”, or “F” shall be handled and destroyed as “For Official Use Only” (FOUO) documents, in accordance with DoD Manual 5200.01, Volume 4, “DoD Information Security Program Controlled Unclassified Information (CUI)”.

Destruction Notice for unclassified, controlled-distribution technical information (i.e., marked with Distribution Statement B, C, D, E, or F):

DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

Classified data, including classified controlled technical data, shall be handled and destroyed in accordance with the procedures in DoD Manual 5200.01, Volume 3, “DoD Information Security Program: Protection of Classified Information” or follow the procedures in DoD 5220.22-M “National Industrial Security Program Operating Manual (NISPOM), Section 5-705.”

Destruction Notice for classified technical information:

DESTRUCTION NOTICE: Follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.01M, Information Security Program, Vol 3, Protection of Classified Information.

7.7 Intellectual Property/Marking

Any markings that are added to documents for review purposes must be removed prior to formal submittal. If a document still requires a marking (i.e., proprietary) not addressed in the contract, including these instructions, must provide a justification for the marking

8.0 MAILING LISTS

AFLCMC/WNU

CM Mailbox @ AFLCMC.WNU.ConfigDataManagement@us.af.mil

9.0 REFERENCE DOCUMENTS

DoDD 5230.9 Clearance of DoD Information for Public Release DoDD 5230.25 Withholding of Unclassified Technical Data From Public Disclosure

"WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C. App. 2401, et seq.), as amended.

Violations of these export laws are subject to severe criminal penalties.

Disseminate in accordance with the provisions of DoDD 5230.25.

mailto:AFLCMC.WNU.ConfigDataManagement@us.af.mil

DoDI 5230.24 Distribution Statements on Technical Documents DoD 5400.7-R DoD Freedom of Information Act Program DoD 5010.12-M Procedures for the Acquisition and Management of Technical Data DoDM 5200.01 Information Security Program: Overview, Classification, and Declassification DoD 5220.22-M National Industrial Security Program Operating Manual AFI 61-201 Management of Scientific and Technical Information

CONTRACT #:

CONTRACTOR:

SET NAME: MFDU LRIP SYSTEM ITEM: Maternity Flight Duty Uniform

PROGRAM: Human Systems

DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH

A001 AFLCMC/WNU DI-NDTI-81307A Para 10.1

First Article Qualification Test Plan and Procedure

A002 AFLCMC/WNU DI-NDTI-80809B Para 10.1

Test/Inspection Report

A003 AFLCMC/WNU DI-ADMN-81249B Para 11.1

Conference Agenda

A004 AFLCMC/WNU DI-ADMN-81505 Para 11.1

Report, Record of Meeting/Minutes

A005 AFLCMC/WNU DI-PACK-80877B Para 12.2.1

Transportation Data Report

A006 AFLCMC/WNU DI-MGMT-80368A Para 13

Status Report

A007 AFLCMC/WNU DI-SESS-80639E/T Para 13.1

Engineering Change Proposal (ECP)

A008 AFLCMC/WNU DI-SESS-80640E/T Para 13.1

Request for Variance (RFV)

A009 AFLCMC/WNU DI-ADMN-81401C Para 13.1

Contract Change Proposal (CCP)

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP TM OTHER OTHER

D. SYSTEM/ITEM

Maternity Flight Duty Uniform

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

First Article Qualification Test Plan and Procedure

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-81307A

5. CONTRACT REFERENCE

Para 9.1

6. REQUIRING OFFICE

AFLCMC/WNU

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

E

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

30DAC

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

SEE GENERAL NOTES

15. TOTAL 0 0 0

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 8 of 16 Pages

17. PRICE GROUP

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

A002

2. TITLE OF DATA ITEM

Test/Inspection Report

DI-NDTI-80809B

Para 9.1

6. REQUIRING OFFICE

AFLCMC/WNU

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

BLK16

8. APP CODE

N

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Block 12: Reports shall be submitted NLT 10 days after each test.

SEE GENERAL NOTES

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 9 of 16 Pages

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

A003

2. TITLE OF DATA ITEM

Conference Agenda

DI-ADMN-81249B

Para 10.1

6. REQUIRING OFFICE

AFLCMC/WNU

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

8. APP CODE

N

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Block 12: Agenda shall be submitted NLT 10 days prior to event/Meeting.

SEE GEN NOTES

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 10 of 16 P

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

A004

2. TITLE OF DATA ITEM

Report, Record of Meeting/Minutes

DI-ADMN-81505

Para 10.1

6. REQUIRING OFFICE

AFLCMC/WNU

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

E

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Block 12: Minutes shall be submitted NLT 10 days after event/meeting.

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 11 of 16

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

A005

2. TITLE OF DATA ITEM

Transportation Data Report

DI-PACK-80877B

Para 11.2

6. REQUIRING OFFICE

AFLCMC/WNU

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

8. APP CODE

N

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Block 12: Initial submittal shall be provide 5 days prior to each projected delivery. Update as required to maintain currency

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 12 of 16

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

A006

2. TITLE OF DATA ITEM

Engineering Change Proposal (ECP)

DI-SESS-80639E/T

PARA 13.0

6. REQUIRING OFFICE

AFLCMC/WNU

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Block 4: Data Item Description is tailored as follows:

Para 2 Format: Delete 1.b & c

Block 12: ECPs shall be submitted IAW Government Contracting Officers direction.

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 13 of 16

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

A007

2. TITLE OF DATA ITEM

Request for Variance (RFV)

DI-SESS-80640E/T

6. REQUIRING OFFICE

AFLCMC/WNU

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Block 4: Data Item Description is tailored as follows:

Delete Para 2.b & 2.c

Block 12: RFV shall be submitted NLT 5 days after issue is identified.

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 14 of 16

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

A008

2. TITLE OF DATA ITEM

Contract Change Proposal (CCP)

DI-ADMN-81401C

6. REQUIRING OFFICE

AFLCMC/WNU

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Block 12: CCPs shall be submitted IAW Government Contracting Officers direction.

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 15 of 16

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

A009

2. TITLE OF DATA ITEM

Status Report

DI-MGMT-80368A

Para 12.0

6. REQUIRING OFFICE

AFLCMC/WNU

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

NA

12. DATE OF FIRST SUBMISSION

30DAC

8. APP CODE

N

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

EOM

Reg Repro

16. REMARKS

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 16 of 16

2.0 GENERAL
3.0 DATA DELIVERIES
3.1 Delivery Dates
3.2 Tailored Data Items
3.3 Approval of Data
3.4 Resubmittal of Data
3.5 Final Submittal of Data
3.6 DD Form 250 Requirements
3.7 Classified Data
3.8 Modification of Data Requirements
4.0 ELECTRONIC DATA TRANSMISSION
5.0 LETTERS OF TRANSMITTAL (LOT)
Additional information may be included that aids in the processing of submittals.
7.0 MARKING TECHNICAL DOCUMENTATION
7.2. Marking Technical Data
7.3. Distribution Statement
7.4 Controlling DoD Office
7.5 Export-Controlled Warning Statement
7.6 Destruction Notice
7.7 Intellectual Property/Marking
8.0 MAILING LISTS
9.0 REFERENCE DOCUMENTS

File details come from the government source that posted it. Updated .