PR 1300877716 CDRLs Signed.pdf

PDF 417 KB Posted

Attached to
Mobile Test Enclosure (MTE) Federal contract opportunity
Solicitation number
N6660421Q0037
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

View the file

Other files for this federal contract opportunity

Other files attached to Mobile Test Enclosure (MTE), newest first.
File Type Posted
SOW.pdf PDF
710302542-00.pdf PDF
RFQ.pdf PDF
SOW.pdf PDF
RFQ.pdf PDF
CDRL Addendum.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY

TDP________ TM___________ OTHER_____SESS____________

D. SYSTEM/ITEM

FORACS PTE

E. CONTRACT / PR NO.

PR 1300877716

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM:

Conceptual Design Drawings/Models

3. SUBTITLE

See BLK 16

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-SESS-81001E

5. CONTRACT REFERENCE

Drawings, Inspections, and Approvals

6. REQUIRING OFFICE

NUWC Code 703

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ

N

9. DIST STATEMNT

REQUIRED

D

10. FREQUENCY

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

See Blk 16 One/R See Blk 16

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft Final

A N/A See BLK 16 Reg Repro

16. REMARKS See BLK 16 1 1 0

Block 3: Preliminary Drawings and Lists

Block 9: See CDRL Addendum

Block 12 & 13: The initial submission shall be made 21 days after contract award. The Government has 7 days to review, comment, and return Preliminary Drawings to the Contractor. The Contractor has 7 days to incorporate Government comments and return Preliminary Drawings as finalized.

Block 14: Submission by email preferred: Send to john.skutnik@navy.mil John M Skutnik

NUWC AUTEC

801 Clematis St

W P Bch, VA 33304

15. TOTAL

1 1 0

G. PREPARED BY:

John Skutnik

H. DATE

2 Dec 2020

I. APPROVED BY

J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page _1___ of __5 Pages

TDP OPTION SELECTION WORKSHEET

SYSTEM: FORACS Portable Test Enclosure DATE PREPARED: 12 November 2020

A. CONTRACT NO.

TBD

B. EXHIBIT / ATTACHMENT NO. C. CLIN D. CDRL DATA

ITEM NO(s) A001

1. TDP LIFECYCLE LEVEL (CHOOSE ONLY ONE PER WORKSHEET) (Note: The level selected must coincide with the requirements of the elements selected in Block 5.)

A. ☒ CONCEPTUAL LEVEL

☐ DEVELOPMENTAL LEVEL

☐ PRODUCTION LEVEL

B. REMARKS: Draft and Final Preliminary Drawings in accordance with CDRL A001.

2. DELIVERABLE DATA PRODUCTS (X ALL THAT APPLY AND COMPLETE AS APPLICABLE)

TYPE FORMAT

A. ☒ 2D DRAWINGS ☒ NATIVE CAD ☐ ISO 32000 PDF ☐ HARDCOPY

☐ OTHER FORMAT (SPECIFY)__________________________________

B. 3D MODELS:

☐ 3D Digital MODELS ONLY ☐ 3D Digital MODELS W/

ASSOCIATED 2D

DRAWINGS

☐ NATIVE CAD (Specify level of annotation) _________________________ ☐ MODEL ORGANIZATION SCHEMA (Specify Appendix B or other) ________ ☐ NEUTRAL FORMAT (SPECIFY, e.g., ISO 10303 APxxx)____________________ ☐ OTHER FORMAT (SPECIFY, e.g., 3D PDF, JT)___________________________

C. ☐ METADATA

(Specify in Section 9)

☐ ASCII TEXT-PIPE DELIMITTED ☐ ISO 10303 (SPECIFY, e.g., APxxx & DEX)_____ ☐

JEDMICS (DLF) ☐ OTHER FORMAT (SPECIFY) ______________

D. ☒ ASSOCIATED

LISTS (See Sect. 7)

☐ NATIVE FORMAT ☐ ISO 32000 PDF ☐ HARDCOPY

☐ OTHER FORMAT (SPECIFY):

E. SUPPLEMENTAL

☐ TECHNICAL DATA

(Specify in Section 9)

NATIVE______________________________________________________________

NEUTRAL (SPECIFY e.g., STEP AP238, 240, DEX, Other)___________________ OTHER (SPECIFY e.g., PDF)_____________________________________________

3. CAGE CODE & DOCUMENT

NUMBERS

A. ☒ CONTRACTOR CAGE & DOCUMENT NUMBERS

☐ GOVERNMENT CAGE (COMPLETE 3B, 3C, and 3D)

B. USE CAGE CODE: TBD C. USE DOCUMENT NUMBERS: D. TO BE ASSIGNED BY:

4. DRAWING FORMATS (X ONE AND COMPLETE AS APPLICABLE)

☒ CONTRACTOR FORMAT ☐ GOVERNMENT FORMAT

REMARKS: ____________________________________________________________________________________________

5. TDP ELEMENTS AND ASSOCIATED DATA REQUIRED (X ALL THAT APPLY)

☒ CONCEPTUAL DESIGN DRAWINGS / MODELS

☐ DEVELOPMENTAL DESIGN DRAWINGS / MODELS AND ASSOCIATED LISTS

☐ PRODUCT DRAWINGS / MODELS AND ASSOCIATED LISTS

☐ SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS, MODELS AND ASSOCIATED LISTS

☐ SPECIAL TOOLING (ST) DRAWINGS, MODELS AND ASSOCIATED LISTS

☐ SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS, MODELS AND ASSOCIATED LISTS

☐ SPECIFICATIONS AND / OR STANDARDS (SPECIFY): _________________________________________________ ☐ SOFTWARE DOCUMENTATION (SPECIFY): _____________________________________________________ ☐ QUALITY ASSURANCE PROVISIONS (QAP) (SPECIFY) ___________________________________________________ ☐ METADATA (SPECIFY) ______________________________________________________________________________

☐ SUPPLEMENTARY TECHNICAL DATA (SPECIFY)________________________________________________________

6. TDP DATA MANAGEMENT PRODUCTS

☐ SOURCE CONTROL DRAWING (SOCD) APPROVAL REQUEST

☐ DRAWING NUMBER ASSIGNMENT REPORT

☐ PROPOSED CRITICAL MANUFACTURING PROCESS DESCRIPTION

7. ASSOCIATED LISTS (X AND COMPLETE AS APPLICABLE)

A. PARTS LISTS (X ONE)

☐ (1) INTEGRAL

☒ (2) SEPARATE

☐ (3) CONTRACTOR SELECT

B. DATA LISTS

REQUIRED (Specify Levels of Assy)_____________________________________________

C. INDEX LISTS

D. WIRING LISTS

REQUIRED (Specify Levels of Assy)__Separate___________________________________________

E. APPLICATION LISTS

☐ (2) SEPARATE

F. OTHER

REQUIRED (Specify)_________________________________________________________

8. APPLICABILITY OF STANDARDS. THE FOLLOWING STANDARDS APPLY: (X AS APPLICABLE)

☒ ASME Y14.100

ENGINEERING DRAWING

PRACTICES

WITH APPENDICES:

☐ B ☐ C ☐ D ☐ E

☐ ASME Y14.24 TYPES AND APPLICATIONS OF

ENGINEERING DRAWINGS

☐ ASME Y14.34 ASSOCIATED LIST

☐ ASME Y14.35M REVISION OF ENGINEERING

DRAWINGS AND ASSOCIATED LIST

☐ ASME Y14.41 DIGITAL PRODUCT DEFINITION

DATA PRACTICES

☐ ASME Y14.5 DIMENSIONING AND

TOLERANCING

☐ OTHER STANDARDS

APPLY AS DESCRIBED:

COMPANY STANDARDS

PERMITTED

☐ YES ☐ NO

9. OTHER TAILORING (ATTACH ADDITIONAL SHEETS AS NECESSARY)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the

D. SYSTEM/ITEM

FORACS PTE

E. CONTRACT / PR NO.

A002

2. TITLE OF DATA ITEM:

Development Design Drawings/Models and Associated Lists

3. SUBTITLE

See BLK 16

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-SESS-81002F

5. CONTRACT REFERENCE

Drawings, Inspections, and Approvals

6. REQUIRING OFFICE

NUWC Code 703

18. ESTIMATED

REQUIRED

See BLK 16 One/R See Blk 16

SUBMISSION

a. ADDRESSEE Draft Final

A N/A See Blk 16 Reg Repro

16. REMARKS See BLK 16 1 1 0

Block 3: Development Design Drawings and Lists

Block 12 & 13: The initial submission shall be made 49 review, comment, and return Development Design Drawings to the Contractor. The Contractor has 7 days to incorporate Government comments and return Development Design Drawings as finalized.

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page _2___ of __5 Pages

A. CONTRACT NO.

TBD

ITEM NO(s) A002

1. TDP LIFECYCLE LEVEL (CHOOSE ONLY ONE PER WORKSHEET) (Note: The level selected must coincide with the requirements of the

A. ☐ CONCEPTUAL LEVEL

☒ DEVELOPMENTAL LEVEL

☐ PRODUCTION LEVEL

B. REMARKS: Draft and Final Developmental Drawing in accordance with CDRL A002.

2. DELIVERABLE DATA PRODUCTS (X ALL THAT APPLY AND COMPLETE AS APPLICABLE)

TYPE FORMAT

A. ☒ 2D DRAWINGS ☒ NATIVE CAD ☐ ISO 32000 PDF ☐ HARDCOPY

☐ OTHER FORMAT (SPECIFY)__________________________________

B. 3D MODELS:

☐ 3D Digital MODELS ONLY

☐ 3D Digital MODELS W/

☐ NEUTRAL FORMAT (SPECIFY, e.g., ISO 10303 APxxx)____________________ ☐ OTHER FORMAT (SPECIFY, e.g., 3D PDF, JT)___________________________

C. ☐ METADATA

(Specify in Section 9)

☐ ASCII TEXT-PIPE DELIMITTED ☐ ISO 10303 (SPECIFY, e.g., APxxx & DEX)_____ ☐

JEDMICS (DLF) ☐ OTHER FORMAT (SPECIFY) ______________

D. ☒ ASSOCIATED

LISTS (See Sect. 7)

☐ NATIVE FORMAT ☐ ISO 32000 PDF ☐ HARDCOPY

☐ OTHER FORMAT (SPECIFY):

E. SUPPLEMENTAL

☐ TECHNICAL DATA

(Specify in Section 9)

NATIVE______________________________________________________________

NEUTRAL (SPECIFY e.g., STEP AP238, 240, DEX, Other)___________________ OTHER (SPECIFY e.g., PDF)_____________________________________________

3. CAGE CODE & DOCUMENT

NUMBERS

A. ☒ CONTRACTOR CAGE & DOCUMENT NUMBERS

☐ GOVERNMENT CAGE (COMPLETE 3B, 3C, and 3D)

B. USE CAGE CODE: TBD C. USE DOCUMENT NUMBERS: D. TO BE ASSIGNED BY:

4. DRAWING FORMATS (X ONE AND COMPLETE AS APPLICABLE)

☒ CONTRACTOR FORMAT ☐ GOVERNMENT FORMAT

REMARKS: ____________________________________________________________________________________________

5. TDP ELEMENTS AND ASSOCIATED DATA REQUIRED (X ALL THAT APPLY)

☐ CONCEPTUAL DESIGN DRAWINGS / MODELS

☒ DEVELOPMENTAL DESIGN DRAWINGS / MODELS AND ASSOCIATED LISTS

☐ PRODUCT DRAWINGS / MODELS AND ASSOCIATED LISTS

☐ SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS, MODELS AND ASSOCIATED LISTS

☐ SPECIAL TOOLING (ST) DRAWINGS, MODELS AND ASSOCIATED LISTS

☐ SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS, MODELS AND ASSOCIATED LISTS

☐ SPECIFICATIONS AND / OR STANDARDS (SPECIFY): _________________________________________________ ☐ SOFTWARE DOCUMENTATION (SPECIFY): _____________________________________________________

☐ QUALITY ASSURANCE PROVISIONS (QAP) (SPECIFY) ___________________________________________________ ☐ METADATA (SPECIFY) ______________________________________________________________________________

☐ DRAWING NUMBER ASSIGNMENT REPORT

☐ PROPOSED CRITICAL MANUFACTURING PROCESS DESCRIPTION

PRACTICES

☐ ASME Y14.34 ASSOCIATED LIST

☐ ASME Y14.35M REVISION OF ENGINEERING

DRAWINGS AND ASSOCIATED LIST

☐ ASME Y14.41 DIGITAL PRODUCT DEFINITION

DATA PRACTICES

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the

D. SYSTEM/ITEM

FORACS PTE

E. CONTRACT / PR NO.

A003

2. TITLE OF DATA ITEM:

Production Drawings/Models and Associated Lists

3. SUBTITLE

See BLK 16

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-SESS-81000E

5. CONTRACT REFERENCE

Drawings, Inspections, and Approvals

6. REQUIRING OFFICE

NUWC Code 703

18. ESTIMATED

REQUIRED

See BLK 16 One/R See Blk 16

SUBMISSION

a. ADDRESSEE Draft Final

A N/A See Blk 16 Reg Repro

16. REMARKS See BLK 16 1 1 0

Block 3: Production Drawings and Lists

Block 12 & 13: The initial submission shall be made 105 review, comment, and return Production Drawings to the Contractor. The Contractor has 7 days to incorporate Government comments and return Production Drawings as finalized.

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page _3___ of __5 Pages

A. CONTRACT NO.

TBD

ITEM NO(s) A003

1. TDP LIFECYCLE LEVEL (CHOOSE ONLY ONE PER WORKSHEET) (Note: The level selected must coincide with the requirements of the

A. ☐ CONCEPTUAL LEVEL

☐ DEVELOPMENTAL LEVEL

☒ PRODUCTION LEVEL

B. REMARKS: Draft and Final Production Drawings in accordance with CDRL A003.

2. DELIVERABLE DATA PRODUCTS (X ALL THAT APPLY AND COMPLETE AS APPLICABLE)

TYPE FORMAT

A. ☒ 2D DRAWINGS ☒ NATIVE CAD ☐ ISO 32000 PDF ☐ HARDCOPY

☐ OTHER FORMAT (SPECIFY)__________________________________

B. 3D MODELS:

☐ 3D Digital MODELS ONLY ☐ 3D Digital MODELS W/

☐ NEUTRAL FORMAT (SPECIFY, e.g., ISO 10303 APxxx)____________________ ☐ OTHER FORMAT (SPECIFY, e.g., 3D PDF, JT)___________________________

C. ☐ METADATA

(Specify in Section 9)

☐ ASCII TEXT-PIPE DELIMITTED ☐ ISO 10303 (SPECIFY, e.g., APxxx & DEX)_____ ☐

JEDMICS (DLF) ☐ OTHER FORMAT (SPECIFY) ______________

D. ☒ ASSOCIATED

LISTS (See Sect. 7)

☐ NATIVE FORMAT ☐ ISO 32000 PDF ☐ HARDCOPY

☐ OTHER FORMAT (SPECIFY):

E. SUPPLEMENTAL

☐ TECHNICAL DATA

(Specify in Section 9)

NATIVE______________________________________________________________

NEUTRAL (SPECIFY e.g., STEP AP238, 240, DEX, Other)___________________ OTHER (SPECIFY e.g., PDF)_____________________________________________

3. CAGE CODE & DOCUMENT

NUMBERS

A. ☒ CONTRACTOR CAGE & DOCUMENT NUMBERS

☐ GOVERNMENT CAGE (COMPLETE 3B, 3C, and 3D)

B. USE CAGE CODE: TBD C. USE DOCUMENT NUMBERS: D. TO BE ASSIGNED BY:

4. DRAWING FORMATS (X ONE AND COMPLETE AS APPLICABLE)

☒ CONTRACTOR FORMAT ☐ GOVERNMENT FORMAT

REMARKS: ____________________________________________________________________________________________

5. TDP ELEMENTS AND ASSOCIATED DATA REQUIRED (X ALL THAT APPLY)

☐ CONCEPTUAL DESIGN DRAWINGS / MODELS

☐ DEVELOPMENTAL DESIGN DRAWINGS / MODELS AND ASSOCIATED LISTS

☒ PRODUCT DRAWINGS / MODELS AND ASSOCIATED LISTS

☐ SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS, MODELS AND ASSOCIATED LISTS

☐ SPECIAL TOOLING (ST) DRAWINGS, MODELS AND ASSOCIATED LISTS

☐ SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS, MODELS AND ASSOCIATED LISTS

☐ SPECIFICATIONS AND / OR STANDARDS (SPECIFY): _________________________________________________ ☐ SOFTWARE DOCUMENTATION (SPECIFY): _____________________________________________________ ☐ QUALITY ASSURANCE PROVISIONS (QAP) (SPECIFY) ___________________________________________________

☐ METADATA (SPECIFY) ______________________________________________________________________________

☐ DRAWING NUMBER ASSIGNMENT REPORT

☐ PROPOSED CRITICAL MANUFACTURING PROCESS DESCRIPTION

PRACTICES

☐ ASME Y14.34 ASSOCIATED LIST

☐ ASME Y14.35M REVISION OF ENGINEERING

DRAWINGS AND ASSOCIATED LIST

☐ ASME Y14.41 DIGITAL PRODUCT DEFINITION

DATA PRACTICES

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the

TDP________ TM___________ OTHER_____TMSS____________

D. SYSTEM/ITEM

FORACS PTE

E. CONTRACT / PR NO.

A004

2. TITLE OF DATA ITEM:

Commercial Off-the-Shelf (COTS) Manuals and Associated Supplemental Data

3. SUBTITLE

See BLK 16

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-TMSS-80527C

5. CONTRACT REFERENCE

Drawings, Inspections, and Approvals

6. REQUIRING OFFICE

NUWC Code 709

18. ESTIMATED

REQUIRED

See Blk 16 OTIME

EOC

SUBMISSION

a. ADDRESSEE Draft Final

N/A N/A N/A Reg Repro

16. REMARKS See BLK 16 0 1 0

Block 3: Commercial Off-the-Shelf (COTS) Manuals and Documentation

0 1 0

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page _4___ of __5 Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the

TDP________ TM___________ OTHER______MISC___________

D. SYSTEM/ITEM

FORACS PTE

E. CONTRACT / PR NO.

A005

2. TITLE OF DATA ITEM:

Technical Report–Study/Services

3. SUBTITLE

See BLK 16

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

Standards of Construction

6. REQUIRING OFFICE

NUWC Code 709

18. ESTIMATED

REQUIRED

See Blk 16 OTIME

60DAOC

SUBMISSION

a. ADDRESSEE Draft Final

N/A N/A N/A Reg Repro

16. REMARKS See BLK 16 0 1 0

Block 3: Welding Inspectors and Welders Certificaion Documentation

0 1 0

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __5__ of _5_ Pages

CDRL DD Form PR 1300877716 A001
TDP Form PR 1300877716 A001 Preliminary Drawings
CDRL DD Form PR 1300877716 A002
TDP Form PR 1300877716 A002 Developmental Drawings
CDRL DD Form PR 1300877716 A003
TDP Form PR 1300877716 A003 Production Drawings
CDRL DD Form PR 1300877716 A004
CDRL DD Form PR 1300877716 A005
2020-12-03T06:19:15-0500
HARTWEINSANCHEZ.JOHN.D.1231971749
2020-12-03T06:19:47-0500
HARTWEINSANCHEZ.JOHN.D.1231971749

File details come from the government source that posted it. Updated .