PR 1300877716 CDRLs Signed.pdf
PDF 417 KB Posted
- Attached to
- Mobile Test Enclosure (MTE) Federal contract opportunity
- Solicitation number
- N6660421Q0037
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW.pdf | ||
| 710302542-00.pdf | ||
| RFQ.pdf | ||
| SOW.pdf | ||
| RFQ.pdf | ||
| CDRL Addendum.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
TDP________ TM___________ OTHER_____SESS____________
D. SYSTEM/ITEM
FORACS PTE
E. CONTRACT / PR NO.
PR 1300877716
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM:
Conceptual Design Drawings/Models
3. SUBTITLE
See BLK 16
17. PRICE GROUP
4. AUTHORITY (Date Acquisition Document No.)
DI-SESS-81001E
5. CONTRACT REFERENCE
Drawings, Inspections, and Approvals
6. REQUIRING OFFICE
NUWC Code 703
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
N
9. DIST STATEMNT
REQUIRED
D
10. FREQUENCY
12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
See Blk 16 One/R See Blk 16
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQNT
SUBMISSION
a. ADDRESSEE Draft Final
A N/A See BLK 16 Reg Repro
16. REMARKS See BLK 16 1 1 0
Block 3: Preliminary Drawings and Lists
Block 9: See CDRL Addendum
Block 12 & 13: The initial submission shall be made 21 days after contract award. The Government has 7 days to review, comment, and return Preliminary Drawings to the Contractor. The Contractor has 7 days to incorporate Government comments and return Preliminary Drawings as finalized.
Block 14: Submission by email preferred: Send to john.skutnik@navy.mil John M Skutnik
NUWC AUTEC
801 Clematis St
W P Bch, VA 33304
15. TOTAL
1 1 0
G. PREPARED BY:
John Skutnik
H. DATE
2 Dec 2020
I. APPROVED BY
J. DATE
DD Form 1423-1, Feb 2001 Previous Edition May be Used Page _1___ of __5 Pages
TDP OPTION SELECTION WORKSHEET
SYSTEM: FORACS Portable Test Enclosure DATE PREPARED: 12 November 2020
A. CONTRACT NO.
TBD
B. EXHIBIT / ATTACHMENT NO. C. CLIN D. CDRL DATA
ITEM NO(s) A001
1. TDP LIFECYCLE LEVEL (CHOOSE ONLY ONE PER WORKSHEET) (Note: The level selected must coincide with the requirements of the elements selected in Block 5.)
A. ☒ CONCEPTUAL LEVEL
☐ DEVELOPMENTAL LEVEL
☐ PRODUCTION LEVEL
B. REMARKS: Draft and Final Preliminary Drawings in accordance with CDRL A001.
2. DELIVERABLE DATA PRODUCTS (X ALL THAT APPLY AND COMPLETE AS APPLICABLE)
TYPE FORMAT
A. ☒ 2D DRAWINGS ☒ NATIVE CAD ☐ ISO 32000 PDF ☐ HARDCOPY
☐ OTHER FORMAT (SPECIFY)__________________________________
B. 3D MODELS:
☐ 3D Digital MODELS ONLY ☐ 3D Digital MODELS W/
ASSOCIATED 2D
DRAWINGS
☐ NATIVE CAD (Specify level of annotation) _________________________ ☐ MODEL ORGANIZATION SCHEMA (Specify Appendix B or other) ________ ☐ NEUTRAL FORMAT (SPECIFY, e.g., ISO 10303 APxxx)____________________ ☐ OTHER FORMAT (SPECIFY, e.g., 3D PDF, JT)___________________________
C. ☐ METADATA
(Specify in Section 9)
☐ ASCII TEXT-PIPE DELIMITTED ☐ ISO 10303 (SPECIFY, e.g., APxxx & DEX)_____ ☐
JEDMICS (DLF) ☐ OTHER FORMAT (SPECIFY) ______________
D. ☒ ASSOCIATED
LISTS (See Sect. 7)
☐ NATIVE FORMAT ☐ ISO 32000 PDF ☐ HARDCOPY
☐ OTHER FORMAT (SPECIFY):
E. SUPPLEMENTAL
☐ TECHNICAL DATA
(Specify in Section 9)
NATIVE______________________________________________________________
NEUTRAL (SPECIFY e.g., STEP AP238, 240, DEX, Other)___________________ OTHER (SPECIFY e.g., PDF)_____________________________________________
3. CAGE CODE & DOCUMENT
NUMBERS
A. ☒ CONTRACTOR CAGE & DOCUMENT NUMBERS
☐ GOVERNMENT CAGE (COMPLETE 3B, 3C, and 3D)
B. USE CAGE CODE: TBD C. USE DOCUMENT NUMBERS: D. TO BE ASSIGNED BY:
4. DRAWING FORMATS (X ONE AND COMPLETE AS APPLICABLE)
☒ CONTRACTOR FORMAT ☐ GOVERNMENT FORMAT
REMARKS: ____________________________________________________________________________________________
5. TDP ELEMENTS AND ASSOCIATED DATA REQUIRED (X ALL THAT APPLY)
☒ CONCEPTUAL DESIGN DRAWINGS / MODELS
☐ DEVELOPMENTAL DESIGN DRAWINGS / MODELS AND ASSOCIATED LISTS
☐ PRODUCT DRAWINGS / MODELS AND ASSOCIATED LISTS
☐ SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS, MODELS AND ASSOCIATED LISTS
☐ SPECIAL TOOLING (ST) DRAWINGS, MODELS AND ASSOCIATED LISTS
☐ SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS, MODELS AND ASSOCIATED LISTS
☐ SPECIFICATIONS AND / OR STANDARDS (SPECIFY): _________________________________________________ ☐ SOFTWARE DOCUMENTATION (SPECIFY): _____________________________________________________ ☐ QUALITY ASSURANCE PROVISIONS (QAP) (SPECIFY) ___________________________________________________ ☐ METADATA (SPECIFY) ______________________________________________________________________________
☐ SUPPLEMENTARY TECHNICAL DATA (SPECIFY)________________________________________________________
6. TDP DATA MANAGEMENT PRODUCTS
☐ SOURCE CONTROL DRAWING (SOCD) APPROVAL REQUEST
☐ DRAWING NUMBER ASSIGNMENT REPORT
☐ PROPOSED CRITICAL MANUFACTURING PROCESS DESCRIPTION
7. ASSOCIATED LISTS (X AND COMPLETE AS APPLICABLE)
A. PARTS LISTS (X ONE)
☐ (1) INTEGRAL
☒ (2) SEPARATE
☐ (3) CONTRACTOR SELECT
B. DATA LISTS
REQUIRED (Specify Levels of Assy)_____________________________________________
C. INDEX LISTS
D. WIRING LISTS
REQUIRED (Specify Levels of Assy)__Separate___________________________________________
E. APPLICATION LISTS
☐ (2) SEPARATE
F. OTHER
REQUIRED (Specify)_________________________________________________________
8. APPLICABILITY OF STANDARDS. THE FOLLOWING STANDARDS APPLY: (X AS APPLICABLE)
☒ ASME Y14.100
ENGINEERING DRAWING
PRACTICES
WITH APPENDICES:
☐ B ☐ C ☐ D ☐ E
☐ ASME Y14.24 TYPES AND APPLICATIONS OF
ENGINEERING DRAWINGS
☐ ASME Y14.34 ASSOCIATED LIST
☐ ASME Y14.35M REVISION OF ENGINEERING
DRAWINGS AND ASSOCIATED LIST
☐ ASME Y14.41 DIGITAL PRODUCT DEFINITION
DATA PRACTICES
☐ ASME Y14.5 DIMENSIONING AND
TOLERANCING
☐ OTHER STANDARDS
APPLY AS DESCRIBED:
COMPANY STANDARDS
PERMITTED
☐ YES ☐ NO
9. OTHER TAILORING (ATTACH ADDITIONAL SHEETS AS NECESSARY)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the
D. SYSTEM/ITEM
FORACS PTE
E. CONTRACT / PR NO.
A002
2. TITLE OF DATA ITEM:
Development Design Drawings/Models and Associated Lists
3. SUBTITLE
See BLK 16
17. PRICE GROUP
4. AUTHORITY (Date Acquisition Document No.)
DI-SESS-81002F
5. CONTRACT REFERENCE
Drawings, Inspections, and Approvals
6. REQUIRING OFFICE
NUWC Code 703
18. ESTIMATED
REQUIRED
See BLK 16 One/R See Blk 16
SUBMISSION
a. ADDRESSEE Draft Final
A N/A See Blk 16 Reg Repro
16. REMARKS See BLK 16 1 1 0
Block 3: Development Design Drawings and Lists
Block 12 & 13: The initial submission shall be made 49 review, comment, and return Development Design Drawings to the Contractor. The Contractor has 7 days to incorporate Government comments and return Development Design Drawings as finalized.
DD Form 1423-1, Feb 2001 Previous Edition May be Used Page _2___ of __5 Pages
A. CONTRACT NO.
TBD
ITEM NO(s) A002
1. TDP LIFECYCLE LEVEL (CHOOSE ONLY ONE PER WORKSHEET) (Note: The level selected must coincide with the requirements of the
A. ☐ CONCEPTUAL LEVEL
☒ DEVELOPMENTAL LEVEL
☐ PRODUCTION LEVEL
B. REMARKS: Draft and Final Developmental Drawing in accordance with CDRL A002.
2. DELIVERABLE DATA PRODUCTS (X ALL THAT APPLY AND COMPLETE AS APPLICABLE)
TYPE FORMAT
A. ☒ 2D DRAWINGS ☒ NATIVE CAD ☐ ISO 32000 PDF ☐ HARDCOPY
☐ OTHER FORMAT (SPECIFY)__________________________________
B. 3D MODELS:
☐ 3D Digital MODELS ONLY
☐ 3D Digital MODELS W/
☐ NEUTRAL FORMAT (SPECIFY, e.g., ISO 10303 APxxx)____________________ ☐ OTHER FORMAT (SPECIFY, e.g., 3D PDF, JT)___________________________
C. ☐ METADATA
(Specify in Section 9)
☐ ASCII TEXT-PIPE DELIMITTED ☐ ISO 10303 (SPECIFY, e.g., APxxx & DEX)_____ ☐
JEDMICS (DLF) ☐ OTHER FORMAT (SPECIFY) ______________
D. ☒ ASSOCIATED
LISTS (See Sect. 7)
☐ NATIVE FORMAT ☐ ISO 32000 PDF ☐ HARDCOPY
☐ OTHER FORMAT (SPECIFY):
E. SUPPLEMENTAL
☐ TECHNICAL DATA
(Specify in Section 9)
NATIVE______________________________________________________________
NEUTRAL (SPECIFY e.g., STEP AP238, 240, DEX, Other)___________________ OTHER (SPECIFY e.g., PDF)_____________________________________________
3. CAGE CODE & DOCUMENT
NUMBERS
A. ☒ CONTRACTOR CAGE & DOCUMENT NUMBERS
☐ GOVERNMENT CAGE (COMPLETE 3B, 3C, and 3D)
B. USE CAGE CODE: TBD C. USE DOCUMENT NUMBERS: D. TO BE ASSIGNED BY:
4. DRAWING FORMATS (X ONE AND COMPLETE AS APPLICABLE)
☒ CONTRACTOR FORMAT ☐ GOVERNMENT FORMAT
REMARKS: ____________________________________________________________________________________________
5. TDP ELEMENTS AND ASSOCIATED DATA REQUIRED (X ALL THAT APPLY)
☐ CONCEPTUAL DESIGN DRAWINGS / MODELS
☒ DEVELOPMENTAL DESIGN DRAWINGS / MODELS AND ASSOCIATED LISTS
☐ PRODUCT DRAWINGS / MODELS AND ASSOCIATED LISTS
☐ SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS, MODELS AND ASSOCIATED LISTS
☐ SPECIAL TOOLING (ST) DRAWINGS, MODELS AND ASSOCIATED LISTS
☐ SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS, MODELS AND ASSOCIATED LISTS
☐ SPECIFICATIONS AND / OR STANDARDS (SPECIFY): _________________________________________________ ☐ SOFTWARE DOCUMENTATION (SPECIFY): _____________________________________________________
☐ QUALITY ASSURANCE PROVISIONS (QAP) (SPECIFY) ___________________________________________________ ☐ METADATA (SPECIFY) ______________________________________________________________________________
☐ DRAWING NUMBER ASSIGNMENT REPORT
☐ PROPOSED CRITICAL MANUFACTURING PROCESS DESCRIPTION
PRACTICES
☐ ASME Y14.34 ASSOCIATED LIST
☐ ASME Y14.35M REVISION OF ENGINEERING
DRAWINGS AND ASSOCIATED LIST
☐ ASME Y14.41 DIGITAL PRODUCT DEFINITION
DATA PRACTICES
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the
D. SYSTEM/ITEM
FORACS PTE
E. CONTRACT / PR NO.
A003
2. TITLE OF DATA ITEM:
Production Drawings/Models and Associated Lists
3. SUBTITLE
See BLK 16
17. PRICE GROUP
4. AUTHORITY (Date Acquisition Document No.)
DI-SESS-81000E
5. CONTRACT REFERENCE
Drawings, Inspections, and Approvals
6. REQUIRING OFFICE
NUWC Code 703
18. ESTIMATED
REQUIRED
See BLK 16 One/R See Blk 16
SUBMISSION
a. ADDRESSEE Draft Final
A N/A See Blk 16 Reg Repro
16. REMARKS See BLK 16 1 1 0
Block 3: Production Drawings and Lists
Block 12 & 13: The initial submission shall be made 105 review, comment, and return Production Drawings to the Contractor. The Contractor has 7 days to incorporate Government comments and return Production Drawings as finalized.
DD Form 1423-1, Feb 2001 Previous Edition May be Used Page _3___ of __5 Pages
A. CONTRACT NO.
TBD
ITEM NO(s) A003
1. TDP LIFECYCLE LEVEL (CHOOSE ONLY ONE PER WORKSHEET) (Note: The level selected must coincide with the requirements of the
A. ☐ CONCEPTUAL LEVEL
☐ DEVELOPMENTAL LEVEL
☒ PRODUCTION LEVEL
B. REMARKS: Draft and Final Production Drawings in accordance with CDRL A003.
2. DELIVERABLE DATA PRODUCTS (X ALL THAT APPLY AND COMPLETE AS APPLICABLE)
TYPE FORMAT
A. ☒ 2D DRAWINGS ☒ NATIVE CAD ☐ ISO 32000 PDF ☐ HARDCOPY
☐ OTHER FORMAT (SPECIFY)__________________________________
B. 3D MODELS:
☐ 3D Digital MODELS ONLY ☐ 3D Digital MODELS W/
☐ NEUTRAL FORMAT (SPECIFY, e.g., ISO 10303 APxxx)____________________ ☐ OTHER FORMAT (SPECIFY, e.g., 3D PDF, JT)___________________________
C. ☐ METADATA
(Specify in Section 9)
☐ ASCII TEXT-PIPE DELIMITTED ☐ ISO 10303 (SPECIFY, e.g., APxxx & DEX)_____ ☐
JEDMICS (DLF) ☐ OTHER FORMAT (SPECIFY) ______________
D. ☒ ASSOCIATED
LISTS (See Sect. 7)
☐ NATIVE FORMAT ☐ ISO 32000 PDF ☐ HARDCOPY
☐ OTHER FORMAT (SPECIFY):
E. SUPPLEMENTAL
☐ TECHNICAL DATA
(Specify in Section 9)
NATIVE______________________________________________________________
NEUTRAL (SPECIFY e.g., STEP AP238, 240, DEX, Other)___________________ OTHER (SPECIFY e.g., PDF)_____________________________________________
3. CAGE CODE & DOCUMENT
NUMBERS
A. ☒ CONTRACTOR CAGE & DOCUMENT NUMBERS
☐ GOVERNMENT CAGE (COMPLETE 3B, 3C, and 3D)
B. USE CAGE CODE: TBD C. USE DOCUMENT NUMBERS: D. TO BE ASSIGNED BY:
4. DRAWING FORMATS (X ONE AND COMPLETE AS APPLICABLE)
☒ CONTRACTOR FORMAT ☐ GOVERNMENT FORMAT
REMARKS: ____________________________________________________________________________________________
5. TDP ELEMENTS AND ASSOCIATED DATA REQUIRED (X ALL THAT APPLY)
☐ CONCEPTUAL DESIGN DRAWINGS / MODELS
☐ DEVELOPMENTAL DESIGN DRAWINGS / MODELS AND ASSOCIATED LISTS
☒ PRODUCT DRAWINGS / MODELS AND ASSOCIATED LISTS
☐ SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS, MODELS AND ASSOCIATED LISTS
☐ SPECIAL TOOLING (ST) DRAWINGS, MODELS AND ASSOCIATED LISTS
☐ SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS, MODELS AND ASSOCIATED LISTS
☐ SPECIFICATIONS AND / OR STANDARDS (SPECIFY): _________________________________________________ ☐ SOFTWARE DOCUMENTATION (SPECIFY): _____________________________________________________ ☐ QUALITY ASSURANCE PROVISIONS (QAP) (SPECIFY) ___________________________________________________
☐ METADATA (SPECIFY) ______________________________________________________________________________
☐ DRAWING NUMBER ASSIGNMENT REPORT
☐ PROPOSED CRITICAL MANUFACTURING PROCESS DESCRIPTION
PRACTICES
☐ ASME Y14.34 ASSOCIATED LIST
☐ ASME Y14.35M REVISION OF ENGINEERING
DRAWINGS AND ASSOCIATED LIST
☐ ASME Y14.41 DIGITAL PRODUCT DEFINITION
DATA PRACTICES
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the
TDP________ TM___________ OTHER_____TMSS____________
D. SYSTEM/ITEM
FORACS PTE
E. CONTRACT / PR NO.
A004
2. TITLE OF DATA ITEM:
Commercial Off-the-Shelf (COTS) Manuals and Associated Supplemental Data
3. SUBTITLE
See BLK 16
17. PRICE GROUP
4. AUTHORITY (Date Acquisition Document No.)
DI-TMSS-80527C
5. CONTRACT REFERENCE
Drawings, Inspections, and Approvals
6. REQUIRING OFFICE
NUWC Code 709
18. ESTIMATED
REQUIRED
See Blk 16 OTIME
EOC
SUBMISSION
a. ADDRESSEE Draft Final
N/A N/A N/A Reg Repro
16. REMARKS See BLK 16 0 1 0
Block 3: Commercial Off-the-Shelf (COTS) Manuals and Documentation
0 1 0
DD Form 1423-1, Feb 2001 Previous Edition May be Used Page _4___ of __5 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the
TDP________ TM___________ OTHER______MISC___________
D. SYSTEM/ITEM
FORACS PTE
E. CONTRACT / PR NO.
A005
2. TITLE OF DATA ITEM:
Technical Report–Study/Services
3. SUBTITLE
See BLK 16
17. PRICE GROUP
4. AUTHORITY (Date Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
Standards of Construction
6. REQUIRING OFFICE
NUWC Code 709
18. ESTIMATED
REQUIRED
See Blk 16 OTIME
60DAOC
SUBMISSION
a. ADDRESSEE Draft Final
N/A N/A N/A Reg Repro
16. REMARKS See BLK 16 0 1 0
Block 3: Welding Inspectors and Welders Certificaion Documentation
0 1 0
DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __5__ of _5_ Pages
| CDRL DD Form PR 1300877716 A001 |
| TDP Form PR 1300877716 A001 Preliminary Drawings |
| CDRL DD Form PR 1300877716 A002 |
| TDP Form PR 1300877716 A002 Developmental Drawings |
| CDRL DD Form PR 1300877716 A003 |
| TDP Form PR 1300877716 A003 Production Drawings |
| CDRL DD Form PR 1300877716 A004 |
| CDRL DD Form PR 1300877716 A005 |
| 2020-12-03T06:19:15-0500 | |
| HARTWEINSANCHEZ.JOHN.D.1231971749 |
| 2020-12-03T06:19:47-0500 | |
| HARTWEINSANCHEZ.JOHN.D.1231971749 |
File details come from the government source that posted it. Updated .