Questions and Answers - Amendment 3.pdf

PDF 116 KB Posted

Attached to
Overhead Power Lines
Solicitation number
Power1Sol
Issued by

View the file

Other files

File Type Posted
Power Line_Abstract of Offers.xlsx XLSX spreadsheet
W50S8S21B0001 0004.pdf PDF
Questions and Answers - Amendment 04.pdf PDF
W50S8S21B0001 0003.pdf PDF
Questions and Answers- Amendment 2.pdf PDF
Electrical Single Line.pdf PDF
W50S8S21B0001 0002 Amendment.pdf PDF
Pre-Bid Second Site Visit Agenda Final.pdf PDF
Existing Utility And Demo Plan - West revised 24march21.pdf PDF
OH20210001 2-12-2021.txt TXT text file
OH20210088 2-26-2021.txt TXT text file
W50S8S21B00010001 Amendment.pdf PDF
OH20210088 2-26-2021.pdf PDF
OH20210001 2-12-2021.pdf PDF
Pre-Bid Site Visit Agenda Final.pdf PDF
RFI Form Final.docx DOCX document
Pre-Bid Site Visit Agenda Final.pdf PDF
W50S8S21B00010001 Amendment.pdf PDF
Communications site plan - South.pdf PDF
Electrical Site plan - West.pdf PDF
Communications site plan - North.pdf PDF
UFC 355001.pdf PDF
Stationary Bollard Detail.pdf PDF
Electrical Site Plan - East.pdf PDF
sectionalizing cabinet at pavement.pdf PDF
sectionalizing cabinet.pdf PDF
Existing Ulitily Demo Plan - East.pdf PDF
SOW WYTD972007 RPR OH elec lines.docx DOCX document
Existing Utility Demo Plan - West.pdf PDF
UFC 3-550-01 Exterior Electrical Power Distribution with Change 3.pdf PDF
W50S8S21B0001 Overhead Power Line.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT/ADDENDUM 03

REPAIR OVERHEAD ELECTRIC POWER LINES

AT 180TH FIGHTER WING

Q1: Is the intent for the primary cable to be copper? The UFC calls for aluminum with copper as an alternate that can be approved by the base CE.

A1: Yes. The existing cable on base is copper.

Q2: Please verify all comm handholes are to be 4X4X4 manholes.

A2: Yes, per the statement of work.

Q3: Please verify there will be bump posts on the 3 sectionalizers on the west side of buildings 149, 120 and 119.

A3: The two sectionalizers to the west of buildings 119 and 120 do not require bollards unless they are located within 5’ of the pavement. The sectionalizer to the west of building 149 will require bollards if located within 5’ of the pavement or is in the paved area.

Q4: Is the partial discharge test in paragraph 5.4.4 required? If it is determined the partial discharge test is required, can this be completed online in lieu of offline?

A4: The partial discharge test is NOT required. Delete testing of existing cables. Only new cables shall be hipot tested.

Q5: Would a VLF with a Tan-Delta test be acceptable?

A5: Yes.