1075445152E Rectangle
1075445152E Rectangle
1075445152E Rectangle
1075445152E Rectangle
1075445152E Rectangle
1075445152E Rectangle
1075445152E Line
1075445152E Line
1075445152E Line
1075445152E Line
1075445152E Line
1075445152E Line
1075445152E Line
1075445152E Callout New 3 way sectionalizing cabinet. Provide two 5" conduits from sectionalizer into existing manhole. Reuse existing MV conductors to connect to new sectionalizer.
1075445152E Callout New primary ductbank connect to existing.
1075445152E Callout New 300 kva transformer. Connect new transformer to existing electrical service feeding buildings 118 and 135.
1075445152E Line
1075445152E Line
1075445152E Callout New 4 way sectionalizing cabinet and electrical manhole. Provide 3 bollards 30" from sectionalizer on the east side.
1075445152E Callout New primary ductbank from sectionalizing cabinet to existing transformer.
1075445152E Callout New primary electrical ductbank.
1075445152E Callout New 4 way sectionalizing cabinet and electrical manhole.
1075445152E Callout New 4 way sectionalizing cabinet and electrical manhole.
1075445152E Callout New 3 way sectionalizing cabinet and electrical manhole.
1075445152E Callout New primary ductbank, connect to existing.
1075445152E Callout New electrical underground primary ductbank.
1075445152E Callout New electrical underground primary ductbank.
1075445152E Typewritten Text General Notes:
1. Field verify existing dimensions and conditions.
2. Asphalt pavements are assumed to be 4" thick asphalt on 12" of ODOT #304s. Patch to match existing pavements.
3. Water lines are assumed to be a minimum of 5' below grade and sanitary lines are assumed to a minimum of 36" below grade.
4. Hand dig around existing utilities a minimum of 24" on each side.
5. Contact the contracting officers representative a minimum of 5 days prior to performing any underground excavation to have existing utilities located. Mark the location of the proposed excavations a minimum of 3 days prior to performing any work and submit a site plan of the area to be excavated with an AF Form 103, Work Clearance Request.
6. Hydroseed all disturbed areas that do not require pavements to be replaced.
Work Notes:
1. Provide a maintenance loop of a minimum of 8' of spare conductor for each phase in each manhole unless noted otherwise.
2. Provide pull strings in all spare conduits.
3. Bond bollards to sectionalizer ground ring.
4. Sectionalizer pads shall be 3" above surrounding grade and extend 6" beyond the sectionalizer.
1075445152E Typewritten Text Electrical Site Plan - West
1075445152E Line
1075445152E Typewritten Text Scale 1" = 50'
1075445152E Polygonal Line
1075445152E Callout Pavement cuts (typ.)
1075445152E Typewritten Text Project: WYTD972997
| Repair Overhead Electrical Lines |
| 18 August 20 |
1075445152E Line
1075445152E Polygonal Line
1075445152E Line
1075445152E Line
1075445152E Polygonal Line
1075445152E Rectangle
1075445152E Rectangle
1075445152E Rectangle
1075445152E Line
1075445152E Line
1075445152E Rectangle
1075445152E Polygonal Line
1075445152E Callout New primary electrical ductbank.
1075445152E Line
1075445152E Callout Connect new primary service from sectionalizer to existing primary conductor for buildings 119 & 120.