Electrical Site Plan - East.pdf

PDF 2 MB Posted

Attached to
Overhead Power Lines
Solicitation number
Power1Sol
Issued by

View the file

Other files

File Type Posted
Power Line_Abstract of Offers.xlsx XLSX spreadsheet
W50S8S21B0001 0004.pdf PDF
Questions and Answers - Amendment 04.pdf PDF
W50S8S21B0001 0003.pdf PDF
Questions and Answers - Amendment 3.pdf PDF
Questions and Answers- Amendment 2.pdf PDF
Electrical Single Line.pdf PDF
W50S8S21B0001 0002 Amendment.pdf PDF
Pre-Bid Second Site Visit Agenda Final.pdf PDF
Existing Utility And Demo Plan - West revised 24march21.pdf PDF
OH20210001 2-12-2021.txt TXT text file
OH20210088 2-26-2021.txt TXT text file
W50S8S21B00010001 Amendment.pdf PDF
OH20210088 2-26-2021.pdf PDF
OH20210001 2-12-2021.pdf PDF
Pre-Bid Site Visit Agenda Final.pdf PDF
RFI Form Final.docx DOCX document
Pre-Bid Site Visit Agenda Final.pdf PDF
W50S8S21B00010001 Amendment.pdf PDF
Communications site plan - South.pdf PDF
Electrical Site plan - West.pdf PDF
Communications site plan - North.pdf PDF
UFC 355001.pdf PDF
Stationary Bollard Detail.pdf PDF
sectionalizing cabinet at pavement.pdf PDF
sectionalizing cabinet.pdf PDF
Existing Ulitily Demo Plan - East.pdf PDF
SOW WYTD972007 RPR OH elec lines.docx DOCX document
Existing Utility Demo Plan - West.pdf PDF
UFC 3-550-01 Exterior Electrical Power Distribution with Change 3.pdf PDF
W50S8S21B0001 Overhead Power Line.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1075445152E Rectangle

1075445152E Rectangle

1075445152E Line

1075445152E Line

1075445152E Callout Provide Electrical Manhole and a 3 way sectionalizing cabinet. Provide a minimum of 10' lineal feet of primary conductors (3 each) inside manhole for future connection.

1075445152E Callout Provide 6 way sectionalizing cabinet and new manhole. Reconnect electrical feeds from new south sectionalizer near bldg 124. Reconnect electrical feeds to buildings 313, 137, east end barrier and building 104.

1075445152E Callout Provide a manhole and 4 way sectionalizing cabinet from main base electrical feed from the manhole to the south. Reconnect the north electrical feed and the feed to bldg. 124 from the sectionalizer.

1075445152E Callout 2 each 5" schedule 40 PVC conduits encased in concrete. Provide 3 #2 15kV primary electrical cables between structures.

1075445152E Line

1075445152E Typewritten Text General Notes:

1. Field verify existing dimensions and conditions.

2. Hand dig around existing utilities a minimum of 24" on each side.

3. Contact the Contracting Officer's representative a minimum of 5 days prior to performing any underground excavations to have existing utilities located. Mark the location of the proposed excavations a minimum of 3 days prior to performing any work and submit a site plan of the area to be excavated with an FA Form 103, Work Clearance Request.

4. Hydroseed all disturbed areas that do not require pavements to be replaced.

Work Notes:

1. At the locations of the of the three new sectionalizing cabinets provide sufficient fill to allow for the elevations of the surrounding grade of the filled area around the sectionalizing cabinet pads that shall match the existing elevation of the nearest asphalt pavement edge. The finished grade around the new pads shall extend a minimum of 12" beyond the new concrete pad. The pad shall be 3" above the surrounding grade and shall extend 6" beyond the sectionalizer. Provide stabilized slopes that are grass.

Grass shall be established prior to final acceptance.

2. The sectionalizing cabinets shall be a minimum of 5' from the nearest edge of the road.

3. Provide two concrete filled bollards located 30" from the pavement edge between the corner of the equipment pad and the road.

4. The bollards shall be 6" minimum diameter schedule 40 galvanized pipe. Cover bollard with a yellow plastic cover matching the existing covers on base. See stationary bollard detail.

5. Bond bollards to ground ring around the sectionalizing cabinet with 4/0 ground conductor.

6. Provide a minimum of 10' of spare cable in each manhole per conductor unless specified otherwise.

7. Provide all spare conduits in ductbank with pull strings.

1075445152E Typewritten Text Project: WYTD972007

Repair Overhead Electrical Lines
18 August 20

1075445152E Typewritten Text Electrical Site Plan - East