This abstract of offers summarizes bids received in response to a solicitation for dredging and dock replacement services. The U.S. Coast Guard is seeking a contractor to dredge approximately 4,695 cubic yards of material from the boat basin at Coast Guard Station Owensboro, Kentucky and dispose of 7,043 tons of dredged material. Additional work includes removing debris, demolishing and disposing of an existing floating dock consisting of seven sections, and installing a new prefabricated floating dock. Four offers were received ranging from $986,040 to $2,496,003.62. The government estimate was $1,903,102.50. Hired Labor Western KY Minerals and Dredgit Corp submitted the lowest bids of $986,040 and $1,197,978.88 respectively. The solicitation number is PNUM-5644376 and bids were opened on June 16, 2022.
The related opportunity notice seeks sources to replace moorings and docks at Coast Guard Station Owensboro. Interested contractors must be small businesses and have experience with similar dredging, dock replacement or marine construction work. The estimated value is $500,000 to $1,000,000. The project is set aside for small businesses. Responses were due by April 14, 2022. The Coast Guard is considering further restricting competition to women-owned small businesses, HUBZone, or service-disabled veteran-owned small businesses.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SO LICITATION NUMBER 2. DATE ISSUED
3. DATE OPENED PAGE OF
ABSTRACT OF OFFERS - CONSTRUCTION PNUM-5644376 05/17/2022 06/16/2022 1 I 2 PAGES
4. ISSUING OFFICE NAME ANO TITLE OF CERTIFYING OFFICIAL (Type)
U.S. COAST GUARD I CERTIFY that I have opened, read, and CIVIL ENGINEERING UNIT MIAMI recorded on this abstract all offers SANDY GUITE CONTRACTING SPECIALIST15608 SW 117TH AVE received in response to this solicitation.
SIGNATURE DATE SIGNED
MIAMI, FL 33177-1630
06/16/2022
5. PROJECT TITLE 9. OFFERS
DREDGE CGC OBION MOORINGS & FLOATING DOCK 8, GOVERNMENT ESTIMATE NO.1 NO. 2
REPLACEMENT AT CGC OBION IN OWENSBORO KY (Check A, B or C and complete D, E. and F) A. OFFEROR A. OFFEROR
□ A. HIRED LABOR WESTERN KY MINERALS DREDGIT CORP
B. REASONABLE CONTRACT B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount}
(Without Profit} BID - 20% BID-20%
6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C.AMENDMENTSACKNOWLEDGEO C.AMENDMENTSACKNOWLEDGED
3 [8] (Including Profit) 3 3 7A. 7B. DESCRIPTION OF OFFERED ITEM 7C. EST. D. E. UNIT F. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED
IT
l bM QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT N .
1A Pre & Post Dredge Hydrographic Surveys 1 EA 14,332.00 14,332.00 35,000.00 35,000.00 24,000.00 24,000.00
1B Mobilization & Demobilization 1 EA 230,169.00 230,169.00 110,000.00 110,000.00 350,000.00 350,000.00
1C Removal of Dredge Material 4,695 CY 45.33 212,812.00 30.88 144,981.60 27.00 126,765.00
1D Dredge Material Disposal 7,043 Tons 28.99 204,167.00 52.96 372,997.28 112.50 792,337.50
1E Remove/dispose of floating/submerged debr 1 EA 15,280.00 15,280.00 45,000.00 45,000.00 35,000.00 35,000.00
1F Removal/Demolition of floating dock 1 EA 33,267.00 33,267.00 50,000.00 50,000.00 125,000.00 125,000.00
1G Installation New Floating Dock 1 EA 276,013.00 276,013.00 440,000.00 440,000.00 450,000.00 450,000.00
TOTAL Bid: 986,040.00 1,197,978.88 1,903,102.50
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
1. SOLICITATION NUMBER
I
PAG�OF
I PNUM-5644376 2 PAGES
ABSTRACT OF OFFERS - CONSTRUCTION INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are
CONTINUATION SHEET
received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use addition al OF 1419's for contract items in excess of 13 and attach additional c ontinuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE
DREDGE CGC OBION NO.: 3
MOORINGS & FLOATING A. OFFEROR
DOCK REPLACEMENT AT CECOS GROUP. LLC
CGC OBION IN OWENSBORO
KY
B. BID SECURITY (Type and amount)
BID - 20%
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED
A. B. C. 3
ITEM ESTIMATED UNIT 0. UNIT E. ESTIMATED
NO. QUANTITY PRICE AMOUNT
1A 1 EA 30,263.52 30,263.52
18 1 EA 102,288.69 102,288.69
1C 4695 CY 37.70 177,001.50
10 7043 TONS 146.09 1,028,911.87
1E 1 EA 78,492.90 78.492.90
1F 1 EA 161,468.46 161,468.46
1G 1 EA 553,579.38 553,579.38
TOTAL 2,132,006.32
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
4. OFFERS (Continued)
NO.: 4 NO.:
A. OFFEROR A.OFFEROR
T & T CONSTRUCTION
B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)
BID-20%
C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
0. UNIT E. ESTIMATED O.UNIT E. ESTIMATED
PRICE AMOUNT PRICE AMOUNT
23,046.00 23,046.00
14,234.00 14,234.00
18.44 86,575.80
105.74
102,871.00
113,644.00
1,410,906.00
744,726.82
102,871.00
113,644.00
1,410,906.00
2,496,003.62
NO.:
A.OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
O.UNIT E. ESTIMATED
PRICE AMOUNT
OPTIONAL FORM 1419A (11-88)