This document outlines a federal contract opportunity for dredging and floating dock replacement services. The U.S. Coast Guard is soliciting bids to demolish and dispose of an existing concrete floating dock consisting of seven sections at Coast Guard Station Owensboro in Owensboro, Kentucky. The selected contractor will also dredge and dispose of materials from the boat basin, remove debris, and replace the floating dock sections. Additional requirements include removing and reinstalling a gangway and service lines to allow for the work. The estimated value is between $500,000 and $1,000,000, with a North American Industry Classification System code of 237990. The solicitation will be issued as a small business set-aside, with responses due no later than April 14, 2022. Required bonds and experience in similar projects are detailed.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. COAST GUARD
CIVIL ENGINEERING UNIT
MIAMI
M
IIL A
NG
GN
E
RI
NI EE UNI
T
T
S U
C
VI
CO
SA
R D
M I
AU
G
VICINITY MAP LOCATION MAP
DRAWING INDEX
GENERAL
1 COVER SHEETG-001
3 DEMOLITION PLANS-001
2 DREDGING PLANC-001
4 FLOATING DOCK AND SECTIONSS-002
CIVIL
STRUCTURAL
DESIGN DREDGE DEPTH 348' ORDALLOWABLE OVERDEPTH 2.0'
NORMAL POOL AT 358' ORD
00 12.5' 25' 50'
CONCRETE
DEADMAN
LOG BOOM SYSTEM WITH
DEBRIS SCREEN
EXISTING 48"Ø
MOORING DOLPHIN
EXISTING GANGWAY
(TO BE REMOVED
PRIOR TO DREDGING)
EXISTING 48"Ø MOORING DOLPHIN
(MAINTAIN 5' BUFFER FROM
DOLPHIN)
EXISTING 24"Ø MOORING DOLPHIN
(MAINTAIN 5' BUFFER FROM DOLPHIN)
APPROX EDGE
OF WATER
121'-8"± 3"
APPROXIMATELY 182'±
EXISTING 48"Ø MOORING DOLPHINS
(MAINTAIN 5' BUFFER FROM DOLPHINS)
EXISTING MAIN
PIER
30°
OHIO
R
IVER
NORMAL P
OOL E
L 358 .0'
100 Y
EAR FLOOD E
L 389.5'
RIV
ER M
ILE 753.7
EXISTING 16" Ø STEEL
GUIDE PILE, TYP
EXISTING18'x72'
FLOATING DOCK
31'-0
DREDGE PLAN
APPROXIMATE DREDGE LIMITS
DREDGE TO 348'
(10' BELOW NORMAL POOL)
200'-0
100'-0"
MAINTAIN 5' BUFFER FROM EDGE OF DOLPHINS & PILES
15'-0"
NOTES: LEGEND:
1. DREDGE WITHIN THE DREDGE LIMITS TO 348' (10' BELOW
NORMAL POOL) WITH 2' OVERDREDGE.
2. KEEP 5' BUFFER FROM EDGE OF DOLPHINS AND PILES
WHEN DREDGING.
3. LOGS AND DEBRIS SHALL BE REMOVED WITHIN THE
DREDGE LIMITS. LOGS AND DEBRIS SHALL ALSO BE REMOVED
TO THE WATER'S EDGE AND IN THE AREAS SHOWN.
ADDITIONAL AREAS WITH LOGS AND DEBRIS TO BE
REMOVED.
ADDITIONAL AREAS WITH
LOGS & DEBRIS TO BE
REMOVED
TYPICAL CROSS SECTION
45°
~63'
3 4"
GENERAL NOTES:
1. NOTES BELOW ARE NOT INTENDED TO REPLACE SPECIFICATIONS.
REFER TO SPECIFICATIONS FOR REQUIREMENTS IN ADDITION TO
GENERAL NOTES.
2. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THESE PLANS
AND OF THE SPECIFICATIONS.
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS BEFORE STARTING WORK. NOTIFY CONTRACTING
OFFICER OF DISCREPANCIES.
4. ALL FEDERAL, STATE AND LOCAL SAFETY REGULATIONS ARE TO BE
STRICTLY FOLLOWED: METHODS OF CONSTRUCTION AND ERECTION
OF STRUCTURAL MATERIAL IS THE CONTRACTOR'S RESPONSIBILITY.
5. THE CONTRACTOR SHALL, ON A DAILY BASIS, REMOVE FROM THE SITE
ANY EXCAVATED MATERIAL OR DEBRIS. DISPOSAL OF THE MATERIAL
IS THE RESPONSIBILITY OF THE CONTRACTOR. ALL DEBRIS SHALL BE
DISPOSED OF OFF GOVERNMENT PROPERTY IN A PERMITTED
LANDFILL.
6. USCG SSD OWENSBORO IS AN OPERATION COAST GUARD FACILITY
WITH SEVERAL SEARCH AND RESCUE VESSELS AND BUOY TENDERS.
THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE COR AND
SSD OWENSBORO WITH REGARDS TO VESSEL MOORING LOCATIONS
AND ACCESS.
7. THE CONTRACTOR SHALL PLACE CONSTRUCTION DEBRIS CONTROL
DEVICES, BOOM, TARPAULINS, FLOATS, STAGING, AND OTHER DEVICES
AS NECESSARY AS TO PREVENT CONSTRUCTION DEBRIS FROM
ENTERING THE WATER, AND AIRBORNE MATERIALS FROM LEAVING
THE IMMEDIATE VICINITY OF THE SITE. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR CLEAN-UP OF ANY MATERIALS DEPOSITED OUTSIDE
THE WORK AREA.
8. THIS PROJECT IS LOCATED ON THE OHIO RIVER. THE RIVER IS
ACTIVELY USED BY GOVERNMENT AND COMMERCIAL NAVIGATION.
CONTRACTOR SHALL BE AWARE THAT NO PROTECTION FROM WAKE
OR WIND GENERATED WAVES EXISTS. CONTRACTOR SHALL
ANTICIPATE THESE CONDITIONS DURING PERFORMANCE OF THE
WORK.
9. PROTECT EXISTING ITEMS WHICH ARE TO REMAIN IN PLACE, OR TO BE
REUSED.
10. PRIOR TO BEGINNING DEMOLITION, REMOVE ITEMS NOTED TO REMAIN
IN A MANNER TO PREVENT DAMAGE, AND REINSTALL AS THE WORK
PROGRESSES.
11. ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED AT THE
CONTRACTOR'S EXPENSE.
12. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL ENSURE
THAT ALL SYSTEMS OPERATE AS DESIGNED AND REQUIRED AND
SHALL REVIEW THEIR OPERATION WITH THE GOVERNMENT. AS-BUILT
DRAWINGS SHALL BE COMPILED BY THE CONTRACTOR AND ISSUED AS
SPECIFIED IN THE PROJECT SPECIFICATIONS UPON COMPLETION OF
CONSTRUCTION AND TESTING.
PILES AND MOORING DOLPHINS
TO REMAIN (TYP)
EXISTING MOORING
DOLPHIN TO REMAIN
(TYP)
EXISTING GANGWAY TO BE REMOVED
AND REINSTALLED TO ALLOW FOR
FLOATING DOCK WORK.
~75'
REMOVE AND REINSTALL ALL SERVICES RUN BY
HOSE/WIRE TO ALLOW FOR DEMOLITION AND
CONSTRUCTION
REMOVE AND REPLACE ALL THRU-RODS,
WALERS, COVERBOARDS AND HARDWARE.
REMOVE AND REINSTALL
CLEATS AFTER NEW WALERS,
BUMPERS AND COVERBOARDS
ARE INSTALLED (TYP OF 8)
EXISTING FLOATING DOCK TO BE
REMOVED AND REPLACED
FLOATING DOCK DEMOLITION PLAN
FLOATING DOCK MODULE SECTION
~63'
TYPICAL FLOAT CONSTRUCTION
~18'-0"(MATCH TO EXISTING)
~19' 1 3 4" (MATCH TO EXISTING)
45°
NEW FLOATING DOCK PLAN
CLEAT NOTE
CLEAT DETAIL
| 2021-12-15T15:19:56-0500 | |
| PORRAS.EVA.I.1401393168 |
| 2021-12-15T15:58:55-0500 | |
| SAN.ENRIQUE.1240452053 |
| 2021-12-16T19:42:46-0500 | |
| LESINSKI.MICHAEL.J.1072270424 |
File details come from the government source that posted it. Updated .