PNCI Question.docx
DOCX document 24 KB Posted
- Attached to
- FY16, PMAA, RMCR, shade Shelters
- Solicitation number
- IFB1 PMAA 2016000114 3
- Issued by
- Larimer County, Colorado
About this file
This is a clarification document from PNCi Construction, Inc., the project manager for a park improvement project involving the demolition and replacement of shade shelters and site infrastructure. The project requires the demolition of nine existing canopy/table combinations at sites 2, 5, 7, 10, 11, 12, 14, 15, and 21, with the Park responsible for replacing the tables. All 31 site pads will be regraded to accommodate installation of new shade shelters, fire rings, and concrete pads. Three existing ADA-compliant shelters will remain in place and not be demolished. Bid item #3 includes concrete footers for the use pads, while bid item #5 covers 4,635 square feet of 4-inch concrete slab placement as a separate pay item. All use pads are concrete, not gravel, regardless of any conflicting notes in project documents.
No additional information regarding pricing terms, set-asides, funding sources, contract terms, or renewal options is provided in this clarification document. The document serves solely to address specific questions raised by bidders and to provide definitive direction on project scope and material specifications from the project manager.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Steve, A few questions:
1. Nine(9 each) canopy/table combinations get demolished.
0. Tables as well? Yes
0. Who replaces tables? The Park
1. Is bid item #5 independent of bid item #3. In other words, the 4635sf of 4” concrete is in addition to the concrete use pads? Pay item #3 includes concrete footers.
Pay item #5 includes the 4 “concrete slab placement.
1. Sheet 3, Note 6 says “where use pad is to be gravel pour full depth piers”… Was under the impression all 31 new shelters had concrete use pads. Please clarify. Disregard note as it refers to a different condition, use pad is concrete not gravel.
1. Point of clarification – all 31 existing shelters get demolished? The three handicap shelters are new and will remain.
| No, Existing shade shelters/tables, and site pads at sites 2, 5, 7, 10, 11, 12, 14, | 15 and 21 (9 | sites total) are to be demolished and removed from the site. |
| All 31 site pads are to regarded to accommodate the installation of new shade | shelters, fire rings, and concrete pads. | |
| The three (3) existing ADA sites have shelters and will remain in place. | ||
| There are only 9 sites total with shelters to be demolished |
Scott J. Lanham Project Manager PNCi Construction, Inc.
Grand Junction, CO 81505 970-242-3548 p 970-242-0844 f