About this file

This document is the Addendum #1 for an Invitation to Bid (ITB) issued by the Pleasant Hill School District for the Forestry Building Remodel project. The addendum includes updated information such as the pre-bid attendance sheets, responsibility for permits and special inspections, revised drawing sheets, an updated bid form, and deletions to certain specification sections. The bid deadline is Thursday, February 22, 2024 at 2:00pm local time. The project manual includes general requirements, technical specifications, and drawings for the building remodel work.

The bid form provides details on the base bid package, alternate bids, unit prices, and bid security requirements. Bidders must be qualified, demonstrate responsibility, and comply with prevailing wage, fingerprinting, and drug testing requirements. The contract will be awarded to the lowest responsive and responsible bidder.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1551 Oak Street Suite A, Eugene, Oregon 97401 P:(541) 687-7800 F:(541) 687-1200 email: rodd@rharchitectural.com

Date: February 12, 2024

To: All Prime Bidders

RE: Pleasant Hill School District Forestry Building Remodel

ADDENDUM #1:

YOU ARE HEREBY DIRECTED TO PERFORM THE FOLLOWING WORK AND INCLUDE THE

FOLLOWING WORK IN YOUR BID.

Item #1: The Pre-Bid attendance sheets (3) is included herein.

Item #2: The District shall be responsible for paying for all permits, including special inspections.

The Contractor is responsible for coordinating the schedule for special inspections.

Item #3: Drawing sheet A2.1 (demolition) has been included herein.

Item #4: Refer to the attached Bid Form – Revised Addendum #1.

Item 5: Delete all reference to the following specification division sections:

Section 23 34 13 Section 23 55 33 Section 25 35 13 Section 26 05 44

Item 6: Sheet A0.1: the previous sheet number P002 has been revised to P003.

Item 7: Project Manual – Table of Contents: the previous sheet number P002 has been revised to

P003.

Item 8: The interior window trim shall be drywall wrapped with square corner bead.

END OF ADDENDUM #1

Rodd Oregon Stamp

PLEASANT HILL SCHOOL DISTRICT SECTION 00 01 10

Forestry Building Remodel PROJECT MANUAL TABLE OF CONTENTS

(REVISED ADDENDUM #1)

PROJECT MANUAL TABLE OF CONTENTS 00 01 10 - 1

DOCUMENT 00 01 10

PROJECT MANUAL TABLE OF CONTENTS

Forestry Building Remodel

February 2, 2024

The following is a list of all Divisions, Sections, and Drawings which are included in the Project Manual

INTRODUCTORY PAGES PAGES

Cover Page 1 Document 00 01 01 Title Page 1 Document 00 01 10 Table of Contents 3

DIVISION 00 BIDDING AND CONTRACT REQUIREMENTS

Document 00 11 13 Invitation To Bid 1 Document 00 21 13 Instructions to Bidders, AIA Document A701 6 Document 00 22 13 Supplementary Instructions to Bidders 6 Document 00 41 13 Bid Form 5 Document 00 45 22 First Tier Subcontractor Disclosure Form 1 Document 00 52 13 Form of Agreement 1 Document 00 72 13 General Conditions, AIA Document A201 39 Document 00 73 43 Prevailing Wage Rates for Public Contracts in Oregon 1

Effective January 1, 2024

DIVISION 01 GENERAL REQUIREMENTS

Section 01 11 00 Summary of Work 7 Section 01 25 00 Contract Modification Procedures (CR/PO Form) 4 Section 01 29 00 Payment Procedures 3 Section 01 31 00 Project Management and Coordination 8 Section 01 32 00 Construction Progress Documentation 3 Section 01 33 00 Submittal Procedures 7 Section 01 40 00 Quality Requirements 4 Section 01 50 00 Temporary Facilities and Controls 7 Section 01 60 00 Product Requirements (Substitution Request Form) 5 Section 01 73 00 Execution Requirements 6 Section 01 73 29 Cutting and Patching 4 Section 01 77 00 Closeout Procedures 5 Section 01 78 23 Operation and Maintenance Data 8 Section 01 78 39 Project Record Documents 3

DIVISION(S) TECHNICAL SPECIFICATIONS

06 10 00 Rough Carpentry 7 06 24 00 Plastic Laminates 2 06 41 00 Custom Casework 4 07 20 00 Insulation 2 08 10 00 Doors and Frames 5 08 53 13 Vinyl Windows 5 08 71 00 Finish Hardware 4

PROJECT MANUAL TABLE OF CONTENTS 00 01 10 - 2

09 26 13 Gypsum Wallboard 3 09 90 00 Painting 11 10 28 00 Toilet Accessories 2

22 05 29 Hangers and Supports for Plumbing Piping and Equipment 22 05 93 Testing, Adjusting, and Balancing for HVAC

23 07 19 HVAC Piping Insulation 23 23 00 Refrigerant Piping 23 31 00 HVAC Ducts and Casing 23 33 00 Air Duct Accessories 23 34 13 Axial HVAC Fans 23 34 23 HVAC Power Ventilators 23 37 00 Air Outlets and Inlets 23 55 33 Electric Unit Heaters 23 81 26 Small-Capacity Split-System Air Conditioners

25 35 13 Integrated Automation Actuators and Operators

26 00 00 Common Works Results for Electrical 26 05 19 Low Voltage Electrical Power 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 25 05 33 Raceways and Boxes 26 05 44 Sleeves and Sleeve Seals for Electrical Raceways and Cabling 26 05 53 Identification for Electrical Systems 26 09 23 Lighting Control Devices 26 24 16 Panelboards 26 27 26 Wiring Devices 26 28 16 Enclosed Switches 26 50 00 General Lighting Provisions

DRAWINGS

A0.1 Title Sheet A1.1 Site Plan A2.1 Demolition Plan A3.1 Floor Plan A5.1 Building Sections A6.1 Exterior Elevations A6.2 Exterior Elevations A9.1 Schedules A10.1 Interior Elevations

S1.0 Structural Notes S2.0 Foundation / Roof Plan S5.0 General Structural Details S5.1 General Structural Details S5.2 General Structural Details S6.0 Structural Details

PROJECT MANUAL TABLE OF CONTENTS 00 01 10 - 3

P001 Plumbing Legend, Notes and Schedules P003 Plumbing / Mechanical Code Compliance Notes P101 Plumbing Floor Plan – Waste and Vent P102 Plumbing Floor Plan – Domestic Water P201 Plumbing Details

M001 HVAC Legend, Notes and Schedules M002 Mechanical Code Compliance Notes M101 HVAC Floor Plan M201 HVAC Details

E1.1 Electrical Site Plan E2.1 Electrical Demolition Plan E3.1 Power and Signal Plan E4.1 Lighting Plan E5.1 One Line and Schedules

PLEASANT HILL SCHOOL DISTRICT SECTION 00 41 13

Forestry Building Remodel BID FORM (REVISED ADDENDUM #1)

BID FORM 00 41 13 - 1

DOCUMENT 00 41 13

BID FORM

BID FOR: Forestry Building Remodel

Submitted to: District Office Bid Deadline:Thursday February 22, 2024 Pleasant Hill School District at 2:00pm local time 36386 Hwy. 58 Pleasant Hill, Oregon 97455

Submitted by:

(Company Name)

BASE BID

The undersigned proposes to furnish all material, equipment, and labor required for the complete project, and to perform all work in strict accordance with the Contract Documents for the lump sum prices indicated below with completion occurring on or prior to the dates indicated:

BASE BID PACKAGE:

Bid: __________________________________________________ $ ____________________ (Words) (Figures)

The undersigned agrees, if awarded the Contract, to substantially complete all Base Bid Package A work on or before the dates specified in Section 01 11 00.

The undersigned agrees, if awarded the Contract, to substantially complete all Base Bid Package work on or before the dates specified in Section 01 11 00.

ALTERNATE BIDS

None.

It is understood that the Base Bid may be adjusted for any alternates in determining the amount of the Contract. Any or all of such Alternates may be accepted or reinstated by the Owner at any time within 60 days from the date of the Contract Award by the Owner, at the respective amounts named herein.

BID SECURITY

Accompanying herewith is Bid Security, which is not less than ten percent (10%) of the total amount of the Base Bid plus additive alternates.

UNIT PRICES

The following Unit Prices are submitted by the Undersigned as a proposed basis for additive or deductive adjustments to the Bid Amount in the event quantity changes are required for the items listed. It is understood and agreed that these Unit Prices are separately subject to acceptance by

BID FORM 00 41 13 - 2

the Owner and will thereafter be entered into the Agreement. The Unit Prices are to include all labor, travel and material costs.

Bid: ______________________________________ $ _____________ per ____________

(ITEM) (UNIT)

STIPULATIONS

The undersigned acknowledges the liquidated damages provision included in the Supplementary Conditions.

The undersigned agrees, if awarded the contract, to comply with the provisions of Oregon Revised Statutes 279C.800 through 279C.870 pertaining to the payment of prevailing rates of wage.

The undersigned agrees if awarded the contract to comply with Oregon Revised Statutes 326.603 giving the Owner authority to obtain fingerprints and criminal records check of Contractors, their employees, and subcontractors providing labor for the Project.

The undersigned agrees, if awarded the Contract, to execute and deliver to the Owner within ten

(10) working days after receiving contract forms, a signed Agreement and a satisfactory Performance Bond and Payment Bond each in an amount equal to 100 percent (100%) of the Contract Sum.

For every Agreement of $100,000 or greater in value, all Contractors and Subcontractors shall have a public works bond in the amount of $30,000, filed with the Construction Contractors’ Board (CCB), in compliance with ORS 279C.836, before starting work on the project unless exempt. Contractor agrees to provide a copy of the Contractor’s BOLI Public Works bond with the signed Agreement as Specified in the Supplementary Conditions.

The undersigned agrees that the Bid Security accompanying this proposal is the measure of liquidated damages which the Owner will sustain by the failure of the undersigned to execute and deliver the above named agreement and bonds; and that if the undersigned defaults in executing that agreement within ten (10) days after forms are provided or providing the bonds, then the Bid Security shall become the property of the Owner; but if this proposal is not accepted within sixty (60) days of the time set for the opening of bids, or if the undersigned executes and delivers said agreement and bonds, the Bid Security shall be returned.

By submitting this Bid, the Bidder certifies that the Bidder:

a) has available the appropriate financial, material, equipment, facility and personnel resources and expertise, or the ability to obtain the resources and expertise, necessary to meet all contractual responsibilities;

b) has a satisfactory record of past performance;

c) has a satisfactory record of integrity, and is not disqualified under ORS 279C.440;

d) is qualified legally to contract with the Owner; and

e) will promptly supply all necessary information in connection with any inquiry the Owner may make concerning the responsibility of the Bidder.

Prior to award of a Contract, the Bidder shall submit appropriate documentation to allow the Owner to determine whether or not the Bidder is “responsible” according to the above criteria.

The contractor agrees with the provisions of Oregon Revised Statutes 279C.505, which requires that the contractor shall demonstrate it has established a drug-testing program for employees and will require each subcontractor providing labor for the Project to do the same.

BID FORM 00 41 13 - 3

The undersigned has received addenda numbers _______ to ________ inclusive and has included their provisions in the above Bid amounts.

The undersigned has visited the site to become familiar with conditions under which the Work is to be performed and has correlated the Bidder's personal observations with the requirements of the proposed Contract Documents.

The undersigned certifies that the Bidder is a ____________ Bidder under ORS. ("Resident" or "Non-resident", to be filled in by Bidder)

Names of Firm:

Street Address:

(City) (State) (Zip)

Telephone Number: _____________________________ FAX Number: ______________________________

Email Address:

Signed By: ___________________________________ Printed Name:___________________________________

(Signature of Authorized Official. If bid is from a partnership, one of the partners must sign bid).

Date Signed:

Official Capacity:

If corporation, attest: ______________________________________ Date: ________________

(Secretary of Corporation)

SEAL (If Corporate) _______ Corporation _______ Partnership _______ Individual

Enclosed: Bid Security

BID FORM 00 41 13 - 4

NON-DISCRIMINATION REQUIREMENT

Contractor certifies that the Contractor has not discriminated against minorities, women or emerging small business enterprises in obtaining any required subcontracts.

The Contractor agrees not to discriminate against any client, employee, or applicant for employment or for services, because of race, color, religion, sex, national origin, physical or mental handicap, sexual orientation or age, unless based upon bona fide occupational qualifications, and that they are otherwise in compliance with all federal, state and local laws prohibiting discrimination, with regard to, but not limited to, the following: Employment upgrading, demotion or transfer; Recruitment or recruitment advertising; Layoffs or termination;

Rates of pay or other forms of compensation; Selection for training; Rendition of services. It is further understood that any vendor who is in violation of this clause shall be barred forthwith from receiving awards of any purchase order from the School District, unless a satisfactory showing is made that discriminatory practices have terminated and that a recurrence of such acts is unlikely.

FIRM NAME: _______________________________________________________________________________

ADDRESS: _______________________________________________________________________________

TELEPHONE: _______________________________________________________________________________

BY: _______________________________________________________________________________ (Company or Firm Officer)

BY: _______________________________________________________________________________ (Type or Print Name)

BID FORM 00 41 13 - 5

NON-COLLUSION AFFIDAVIT

STATE OF __________________)

County of ___________________)

I state that I am _____________________ of _________________________________________ (Title) (Name of Firm) and that I am authorized to make this affidavit on behalf of my firm, and its owners, directors, and officers. I am the person responsible in my firm for the price(s) and the amount of this bid.

I state that:

(1) The price(s) and amount of this bid have been arrived at independently and without consultation, communication or agreement with any other contractor, bidder or potential bidder, except as disclosed on the attached appendix.

(2) That neither the price(s) nor the amount of this bid, and neither the approximate price(s) nor approximate amount of this bid, have been disclosed to any other firm or person who is a bidder or potential bidder, and they will not be disclosed before bid opening.

(3) No attempt has been made or will be made to induce any firm or person to refrain from bidding on this contract, or to submit a bid higher than this bid, or to submit any intentionally high or noncompetitive bid or other form of complementary bid.

(4) The bid of my firm is made in good faith and not pursuant to any agreement or discussion with, or inducement from, any firm or person to submit a complementary or noncompetitive bid.

(5) ___________________________________, its affiliates, subsidiaries, officers, directors and (Name of my Firm) employees are not currently under investigation by any governmental agency and have not in the last four years been convicted of or found liable for any act prohibited by State or Federal law in any jurisdiction, involving conspiracy or collusion with respect to bidding on any public contract, except as described on the attached appendix.

I state that ___________________________ understands and acknowledges that the above representations (Name of my Firm) are material and important, and will be relied on by Pleasant Hill School District in awarding the contract(s) for which this bid is submitted. I understand and my firm understands that any misstatement in this affidavit is and shall be treated as fraudulent concealment from Pleasant Hill School District of the true facts relating to the submission of bids for this contract.

(Authorized Signature)

Sworn to and subscribed before me this _____ day of _____________, 20

(Notary Public for Oregon)

My Commission Expires: ___________________________________

END OF BID FORM

AutoCAD SHX Text A.C. ACOUS. ACOUSTICAL ACOUSTICAL A/C AIR CONDITIONING AIR CONDITIONING A.D. AREA DRAIN AREA DRAIN ADJ. ADJUSTABLE ADJUSTABLE AGGR. AGGREGATE AGGREGATE AL. ALUMINUM ALUMINUM ALT. ALTERNATE ALTERNATE APPROX. APPROXIMATE APPROXIMATE ARCH. ARCHITECT(URAL) ARCHITECT(URAL) ASB. ASBESTOS ASBESTOS ASPH. ASPHALT ASPHALT A.B. ANCHOR BOLT ANCHOR BOLT A.H. AIR HANDLER AIR HANDLER A.S.U. AIR SUPPLY UNIT AIR SUPPLY UNIT ANOD. ANODIZED ANODIZED APPL. APPLIANCE APPLIANCE BD. BOARD BOARD BITUM. BITUMINOUS BITUMINOUS BLDG. BUILDING BUILDING BLK. BLOCK BLOCK BLKG. BLOCKING BLOCKING BM. BEAM BEAM BOT. BOTTOM BOTTOM BRNZ. BRONZE BRONZE B.S.B.M. BY STEEL BLDG. MANUF. BY STEEL BLDG. MANUF. B.U.R. BUILT-UP-ROOFING BUILT-UP-ROOFING CAB. CABINET CABINET C.B. CATCH BASIN CATCH BASIN C.D.F. CONTROL DENSITY FILL CONTROL DENSITY FILL CEM. CEMENT CER. CERAMIC CEMENT CER. CERAMIC C.I. CAST IRON CAST IRON CLG. CEILING CEILING CLKG. CAULKING CAULKING CLO. CLOSET CLOSET CLR. CLEAR CLEAR C.M.U. CONCRETE MASONRY UNIT CONCRETE MASONRY UNIT COMP. COMPOSITION COMPOSITION COL. COLUMN COLUMN CONC. CONCRETE CONCRETE C.J. CONTROL JOINT CONTROL JOINT CORR. CORRIDOR CORRIDOR CPT. CARPET (ED) CARPET (ED) C.P. CONCRETE PIPE CONCRETE PIPE CTSK. COUNTERSUNK COUNTERSUNK CNTR. COUNTER COUNTER CTR. CENTER CENTER CU. CUBIC CUBIC DBL. DOUBLE DOUBLE DEPT. DEPARTMENT DEPARTMENT D.F. DRINKING FOUNTAIN DRINKING FOUNTAIN DET. DETAIL DETAIL DIAG. DIAGONAL DIAGONAL DIA. DIAMETER DIAMETER DIM. DIMENSION DIMENSION DISP. DISPENSER DISPENSER DN. DOWN DOWN D.O. DITTO DITTO DR. DOOR DOOR DWR. DRAWER DRAWER D.S. D/S DOWNSPOUT D/S DOWNSPOUT D.S.P. DRY STANDPIPE DRY STANDPIPE DWG. DRAWING DRAWING E. EAST EAST EA. EACH EACH E.J. EXPANSION JOINT EXPANSION JOINT EL. ELEVATION ELEVATION ELECT. ELECTRICAL ELECTRICAL ELEV. ELEVATOR ELEVATOR EMER. EMERGENCY EMERGENCY ENCL. ENCLOSURE ENCLOSURE E.O.S. EDGE OF SLAB EDGE OF SLAB E.P. ELECTRICAL PANELBOARD ELECTRICAL PANELBOARD EQ. EQUAL EQUAL EQPT. EQUIPMENT EQUIPMENT EQV. EQUIVALENT EQUIVALENT E.W.C. ELECTRICAL WATER COOLER ELECTRICAL WATER COOLER (E.) EXISTING EXISTING EXISTING EXP. EXPANSION EXPANSION EXT. EXTERIOR EXTERIOR F.A. FIRE ALARM FIRE ALARM F.A.U. FORCED AIR UNIT FORCED AIR UNIT F.B. FLAT BAR FLAT BAR F.D. FLOOR DRAIN FLOOR DRAIN F.L. FLOW LINE FLOW LINE F.G. FINISH GRADE FINISH GRADE FND. FOUNDATION FOUNDATION F.E. FIRE EXTINGUISHER FIRE EXTINGUISHER F.H.C. FIRE HOSE CABINET FIN. FINISH FIRE HOSE CABINET FIN. FINISH FLR. FLOOR FLOOR FLSH. FLASH OR FLASHING FLASH OR FLASHING FLUOR. FLUORESCENT FLUORESCENT F.O.A. FACE-OF-BLOCK FACE-OF-BLOCK F.O.C. FACE-OF-CONCRETE FACE-OF-CONCRETE F.O.F. FACE-OF-FINISH FACE-OF-FINISH F.O.S. FACE-OF-STUDS FACE-OF-STUDS

AutoCAD SHX Text

ARCHITECTURAL ABBREVIATIONS

AutoCAD SHX Text

ARCHITECTURAL SYMBOLS

AutoCAD SHX Text

PROJECT DATA

AutoCAD SHX Text

SHEET INDEX

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

PROJECT TEAM

AutoCAD SHX Text FPRF. FIREPROOF FIREPROOF F.R. FIRE RETARDANT FIRE RETARDANT F.S. FULL SIZE FULL SIZE FT. FOOT OR FEET FOOT OR FEET FTG. FOOTING FOOTING FURR. FURRING FURRING FUT. FUTURE FUTURE F.P. FOUNDATION VENT FOUNDATION VENT G.A. GUAGE GUAGE GALV. GALVANIZED GALVANIZED GAL. GALLON GALLON G.B. GRAB BAR GRAB BAR G.F.I. GROUND FAULT INTERUPTOR GROUND FAULT INTERUPTOR GL. GLASS GLASS GND. GROUND GROUND GR. GRADE GRADE GRT. GROUT GROUT GYP. BD. GYPSUM BOARD GYPSUM BOARD G.L.B. GLUE-LAMINATED BEAM GLUE-LAMINATED BEAM HC.W.C. HANDICAPPED WATER CLOSET HANDICAPPED WATER CLOSET HNGR. HANGER HK. HOOK HANGER HK. HOOK H.B. HOSE BIBB HOSE BIBB H.C. HOLLOW CORE HOLLOW CORE HDWD. HARDWOOD HARDWOOD HDWE. HARDWARE HARDWARE H.P. HEAT PUMP HEAT PUMP H.M. HOLLOW METAL HOLLOW METAL HORIZ. HORIZONTAL HORIZONTAL H.R. HOUR HOUR HGT. HEIGHT HEIGHT I.D. INSIDE DIAMETER INSIDE DIAMETER INSUL. INSULATION INSULATION INT. INTERIOR INTERIOR INV. INVERT ELEVATION INVERT ELEVATION JAN. JANITOR JANITOR JT. JOINT JOINT JST. JOIST JOIST KIT. KITCHEN KITCHEN K.O. KNOCK-OUT KNOCK-OUT LAB. LABORATORY LABORATORY L.S. LAG SCREW LAG SCREW LAT. LATERAL LATERAL LAM. LAMINATE LAMINATE LAV. LAVATORY LAVATORY LKR. LOCKER LOCKER LT. LIGHT LIGHT LT. WT. LIGHT WEIGHT LIGHT WEIGHT MATL. MATERIAL MATERIAL MAX. MAXIMUM MAXIMUM M.B. MACHINE BOLT MACHINE BOLT MAS. MASONRY MASONRY M.C. MEDICINE CABINET MEDICINE CABINET MECH. MECHANICAL MECHANICAL MEMB. MEMBRANE MEMBRANE MTL. METAL METAL MFR. MANUFACTURER MANUFACTURER MLDG (S) MOULDING (S) MOULDING (S) M.H. MANHOLE MANHOLE MIN. MINIMUM MINIMUM MIR. MIRROR MIRROR MISC. MISCELLANEOUS MISCELLANEOUS M.O. MASONRY OPENING MASONRY OPENING M.R. MOISTURE RESISTANT MOISTURE RESISTANT MTD. MOUNTED MOUNTED MUL. MULLION MULLION (N.) NEW NEW N. NORTH NORTH NAT. NATURAL NATURAL NO. # NUMBER NUMBER NOM. NOMINAL NOMINAL N.T.S. NOT-TO-SCALE NOT-TO-SCALE N.P.T. NATIONAL PIPE THREAD NATIONAL PIPE THREAD OA. OVERALL OVERALL OBS. OBSCURE OBSCURE O.C. O/C ON CENTER ON CENTER O.D. OUTSIDE DIAMETER OUTSIDE DIAMETER O.F.C.I. OWNER FURNISHED,CONTRACTOR INSTALLED OWNER FURNISHED,CONTRACTOR INSTALLED O.F.O.I. OWNER FURNISHED,OWNER INSTALLED OWNER FURNISHED,OWNER INSTALLED OFF. OFFICE OFFICE OPNG. OPENING OPENING OPP. OPPOSITE OPPOSITE OPT. OPTIONAL OPTIONAL OS.A. OUTSIDE AIR OUTSIDE AIR O.S.B. ORIENTED STRAND BOARD ORIENTED STRAND BOARD PNL(S). PANEL(S) PANEL(S) PART. BD. PARTICLE BOARD PARTICLE BOARD PEN. PENETRATION PENETRATION

AutoCAD SHX Text

VICINITY MAP

AutoCAD SHX Text PRCST. PRE-CAST PRE-CAST PL. PLATE PLATE P.LAM. PLASTIC LAMINATE PLASTIC LAMINATE PLAS. PLASTER PLASTER PLYWD. PLYWOOD PLYWOOD PR. PAIR PAIR PT. POINT POINT P.T.D. PAPER TOWEL DISPENSER PAPER TOWEL DISPENSER P.T.D/R PAPER TOWEL PAPER TOWEL DISPENSER/RECEPTACLE PTN. PARTITION PARTITION P.T.R. PAPER TOWEL RECEPTACLE PAPER TOWEL RECEPTACLE P.T. PRESSURE TREATED (WOLMINIZED) PRESSURE TREATED (WOLMINIZED) Q.T. QUARRY TILE QUARRY TILE R. RISER RISER R.D. ROOF DRAIN ROOF DRAIN RFTR. RAFTER RAFTER RAD. RADIUS RADIUS RECT. RECTANGULAR RECTANGULAR RM. ROOM ROOM REF. REFERENCE REFERENCE REFR. REFRIGERATOR REFRIGERATOR RGTR. REGISTER REGISTER REINF. REINFORCED REINFORCED REQ. REQUIRED REQUIRED RESIL. RESILIENT RESILIENT RFG. ROOFING ROOFING R.O. R/O ROUGH OPENING ROUGH OPENING RWD. REDWOOD REDWOOD R.W.L. RAIN WATER LEADER RAIN WATER LEADER S. SOUTH SOUTH S.C. SOLID CORE SOLID CORE S.C.D. SEAT COVER DISPENSER SEAT COVER DISPENSER S.D. SOAP DISPENSER SOAP DISPENSER S.M. SHEET METAL SHEET METAL SCHED. SCHEDULE SCHEDULE SCRN. SCREEN SCREEN SECT. SECTION SECTION SEIS. SEISMIC SEISMIC SH. SHELF SHELF SHWR. SHOWER SHOWER SHT. SHEET SHEET SHTG. SHEATHING SHEATHING SIM. SIMILAR SIMILAR SPCG. SPACING SPACING SPEC. SPECIFICATION SPECIFICATION SQ. SQUARE SQUARE STGR. STAGGER(ED) STAGGER(ED) SST. STAINLESS STEEL STAINLESS STEEL STIFF. STIFFENER STIFFENER STRUCT. STRUCTURAL STRUCTURAL S.SK. SERVICE SINK SERVICE SINK STA. STATION STATION STD. STANDARD STANDARD STL. STEEL STEEL STOR. STORAGE STORAGE STRL. STRUCTURAL STRUCTURAL SUSP. SUSPENDED SUSPENDED SYM. SYMMETRICAL SYMMETRICAL T. TREAD TREAD T.B. TOWEL BAR TOWEL BAR T.C. TOP-OF-CURB TOP-OF-CURB T&G TONGUE AND GROOVE TONGUE AND GROOVE T.P. TOP-OF-PAVEMENT TOP-OF-PAVEMENT T.P.D. TOILET PAPER DISPENSER TOILET PAPER DISPENSER TELE. TELEPHONE TELEPHONE TERR. TERRAZZO TERRAZZO THK. THICK THICK T.O. TOP OF TOP OF TRTD. TREATED TREATED T.W. TOP-OF-WALL TOP-OF-WALL TYP. TYPICAL TYPICAL UTIL. UTILITY UTILITY UNF. UNFINISHED UNFINISHED U.O.N. UNLESS OTHERWISE NOTED UNLESS OTHERWISE NOTED U.O.S. UNLESS OTHERWISE SHOWN UNLESS OTHERWISE SHOWN UR. URNIAL URNIAL VB VAPOR BARRIER VAPOR BARRIER VERT. VERTICAL VERTICAL VEST. VESTIBULE VESTIBULE VEN. VENEER VENEER V.T.O. VENT-TO-OUTSIDE VENT-TO-OUTSIDE V.T.R. VENT-TO-ROOF VENT-TO-ROOF VOL. VOLUME VOLUME W. WEST WEST W/ WITH WITH W.C. WATER CLOSET WATER CLOSET WD. WOOD WOOD WDW WINDOW WINDOW W/O WITHOUT WITHOUT WP. WATERPROOF WATERPROOF WSCT. WAINSCOT WAINSCOT WT. WEIGHT WEIGHT W.W.F. WELDED WIRE FABRIC WELDED WIRE FABRIC W.M. WIRE MESH WIRE MESH

AutoCAD SHX Text 0'-0"

AutoCAD SHX Text A.F.F.

AutoCAD SHX Text

COLUMN GRID NOTATION

AutoCAD SHX Text

MATCH SIDE BREAK - MATCH LINE

AutoCAD SHX Text

ELEVATION DATUM

AutoCAD SHX Text

DATUM POINT

AutoCAD SHX Text

ROOM NAME

AutoCAD SHX Text

ROOM NUMBER

AutoCAD SHX Text

SLOPE TAG

AutoCAD SHX Text

KEY NOTE

AutoCAD SHX Text

WINDOW TAG

AutoCAD SHX Text

DOOR TAG

AutoCAD SHX Text

SAND

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

CONCRETE

AutoCAD SHX Text

GENERAL MASONRY

AutoCAD SHX Text

UNDISTURBED SOIL

AutoCAD SHX Text

WOOD

AutoCAD SHX Text

STEEL

AutoCAD SHX Text

REVISION TAG

AutoCAD SHX Text

REVISION CLOUD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text X

AutoCAD SHX Text

XXX

AutoCAD SHX Text

XXX

AutoCAD SHX Text

XXX

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

REFERENCE NORTH

AutoCAD SHX Text X

AutoCAD SHX Text

XX

AutoCAD SHX Text X

AutoCAD SHX Text

XX

AutoCAD SHX Text

PG#

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DETAIL #

AutoCAD SHX Text

SHEET #

AutoCAD SHX Text

SECTION #

AutoCAD SHX Text

SHEET #

AutoCAD SHX Text

NORTH ARROW

AutoCAD SHX Text

REFERENCE ARROW

AutoCAD SHX Text

VIEW #

AutoCAD SHX Text

DIRECTION OF VIEW

AutoCAD SHX Text

EXISTING WALL

AutoCAD SHX Text

DEMO WALL

AutoCAD SHX Text

NEW WALL

AutoCAD SHX Text

SOUND / THERMAL BATT INSULATION

AutoCAD SHX Text

RIGID INSULATION

AutoCAD SHX Text LEGAL JURISDICTION: -- -- ZONING CLASSIFICATION : RPF RPF RPF TAX MAP NO. : 18-02-34-00 18-02-34-00 LOT : 01900 01900 OCCUPANCY : E E BUILDING TYPE : V-B V-B REMODELED AREA : 1425 SQ.FT. 1425 SQ.FT. RESIDENTIAL STRUCT. CODE: O.R.S.C.-2023 O.R.S.C.-2023 2023 COMMERCIAL STRUCT. CODE: O.S.S.C.-2022 O.S.S.C.-2022 2022 ACCESSIBILITY CODE: ICCA117.1- ICCA117.1- 2017 MECHANICAL CODE: O.S.M.C.-2022 O.S.M.C.-2022 2022 PLUMBING CODE: O.P.S.C.-2023 O.P.S.C.-2023 2023 ELECTRICAL CODE: O.E.S.C.-2023 O.E.S.C.-2023 2023 FIRE CODE: O.F.C.-2019 O.F.C.-2019 O.F.C.-2019 2019 ENERGY CODE: O.E.E.S.C.- O.E.E.S.C.- 2021

AutoCAD SHX Text ARCHITECTURE AND PLANNING 1551 OAK STREET SUITE A EUGENE, OREGON 97401 PHONE: (541) 687-7800 (541) 687-7800 FAX: (541) 687-1200 (541) 687-1200 e-mail: rodd@rharchitectural.com

AutoCAD SHX Text

ARCHITECTURAL CONSULTANT

AutoCAD SHX Text

A0.1 TITLE SHEET TITLE SHEET TITLE SHEET A0.2 ADA SHEETADA SHEET

AutoCAD SHX Text A2.1 DEMOLITION PLAN DEMOLITION PLAN A3.1 FLOOR PLAN FLOOR PLAN A5.1 BUILDING SECTIONS BUILDING SECTIONS A6.1 EXTERIOR ELEVATIONS EXTERIOR ELEVATIONS A6.2 EXTERIOR ELEVATIONS EXTERIOR ELEVATIONS A9.1 SCHEDULES SCHEDULES SCHEDULES A10.1 INTERIOR ELEVATIONSINTERIOR ELEVATIONS

AutoCAD SHX Text S1.0 STRUCTURAL NOTES STRUCTURAL NOTES S2.0 FOUNDATION / ROOF PLAN FOUNDATION / ROOF PLAN S5.0 GENERAL STRUCTURAL GENERAL STRUCTURAL DETAILS S5.1 GENERAL STRUCTURAL GENERAL STRUCTURAL DETAILS S5.2 GENERAL STRUCTURAL GENERAL STRUCTURAL DETAILS S6.0 STRUCTURAL DETAILSSTRUCTURAL DETAILS

AutoCAD SHX Text

AutoCAD SHX Text M001 HVAC LEGEND, NOTES AND HVAC LEGEND, NOTES AND SCHEDULES MOO2 MECHANICAL CODE MECHANICAL CODE COMPLIANCE NOTES M101 HVAC FLOOR PLAN HVAC FLOOR PLAN M201 HVAC DETAILSHVAC DETAILS

AutoCAD SHX Text E1.1 ELECTRICAL SITE PLAN ELECTRICAL SITE PLAN E2.1 ELECTRICAL DEMOLITION ELECTRICAL DEMOLITION PLAN E3.1 POWER AND SIGNAL PLAN POWER AND SIGNAL PLAN E4.1 LIGHTING PLAN LIGHTING PLAN E5.1 ONE LINE AND SCHEDULESONE LINE AND SCHEDULES

AutoCAD SHX Text P001 PLUMBING LEGEND, NOTES PLUMBING LEGEND, NOTES AND SCHEDULES POO3 PLUMBING / MECHANICAL PLUMBING / MECHANICAL CODE COMPLIANCE NOTES P201 PLUMBING DETAILSPLUMBING DETAILS

AutoCAD SHX Text

RODD HANSEN, ARCHITECT, LLC

AutoCAD SHX Text

LANDSCAPING DRAWING

AutoCAD SHX Text

ARCHITECTURAL DRAWING

AutoCAD SHX Text

STRUCTURAL DRAWING

AutoCAD SHX Text

ELECTRICAL DRAWING

AutoCAD SHX Text

PLUMBING DRAWING

AutoCAD SHX Text

MECHANICAL DRAWING

AutoCAD SHX Text STRUCTURAL ENGINEERS 1207 ADAMS AVENUE LaGrand, OREGON 97850 PHONE: (541)-786-5315 FAX: -- e-mail: dhoward@cbse.us

AutoCAD SHX Text

CBSE, L.L.C. ENGINEERING

AutoCAD SHX Text ENGINEERING 5140 FRANKLIN BLVD. SUITE #1 EUGENE, OREGON 974O3 PHONE: (541) 505-9727 FAX: --

AutoCAD SHX Text

INTEG

AutoCAD SHX Text JIM KRUMSICK P.E. LEED AP 85193 APPLETREE DRIVE EUGENE, OREGON 97405 PHONE: (541) 285-1680 FAX: jkrumsick@q.com

AutoCAD SHX Text

PARADIGM ENGINEERING

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

ISSUE DATE:

AutoCAD SHX Text

JOB#:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text 2-12-2024

AutoCAD SHX Text

AutoCAD SHX Text

JSD

AutoCAD SHX Text 2-2-2024

AutoCAD SHX Text 1551 Oak Street Suite A Eugene, Oregon 97401 Phone: (541)-687-7800 Fax: (541)-687-1200 E-Mail: rodd@rharchitectural.com

AutoCAD SHX Text 1520.05032023

AutoCAD SHX Text THE DOCUMENT AND THE IDEAS AND DESIGNS INCORPORATED HEREIN ARE THE PROPERTY OF RODD HANSEN, ARCHITECT, LLC, AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF RODD HANSEN, ARCHITECT, LLC

AutoCAD SHX Text

FORESTRY BUILDING REMODEL

AutoCAD SHX Text

DISTRICT 1 PLEASANT HILL FORESTRY BUILDING

AutoCAD SHX Text

84455 N ENTERPRISE RD. PLEASANT HILL, OR. 97455

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text

EUGENE, OREGON

AutoCAD SHX Text

RODD E. HANSEN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AREA OF PROPOSED REMODEL

AutoCAD SHX Text A0.1

AutoCAD SHX Text

TITLE SHEET

AutoCAD SHX Text

NONE

AutoCAD SHX Text

NORTH

SCALE:

AutoCAD SHX Text

ISSUE DATE:

AutoCAD SHX Text

JOB#:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text

JSD

AutoCAD SHX Text 2-2-2024

AutoCAD SHX Text 1551 Oak Street Suite A Eugene, Oregon 97401 Phone: (541)-687-7800 Fax: (541)-687-1200 E-Mail: rodd@rharchitectural.com

AutoCAD SHX Text 1520.05032023

AutoCAD SHX Text THE DOCUMENT AND THE IDEAS AND DESIGNS INCORPORATED HEREIN ARE THE PROPERTY OF RODD HANSEN, ARCHITECT, LLC, AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF RODD HANSEN, ARCHITECT, LLC

AutoCAD SHX Text

FORESTRY BUILDING REMODEL

AutoCAD SHX Text

DISTRICT 1 PLEASANT HILL FORESTRY BUILDING

AutoCAD SHX Text

84455 N ENTERPRISE RD. PLEASANT HILL, OR. 97455

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text

EUGENE, OREGON

AutoCAD SHX Text

RODD E. HANSEN

AutoCAD SHX Text

AutoCAD SHX Text

FIRST FLOOR DEMO PLAN

AutoCAD SHX Text A2.1

AutoCAD SHX Text GENERAL NOTES: 1. SITE TO BE CLEANED OF ALLSITE TO BE CLEANED OF ALLDEMOLISHED MATERIAL BYCONTRACTOR PRIOR TO NEWCONSTRUCTION 2. ALL DAMAGE TO REMAININGALL DAMAGE TO REMAININGSTRUCTURE AFTERDEMOLITION WILL BEWILL BEREPAIRED AND PAINTEDTO MATCH EXISTING BUILDING

AutoCAD SHX Text 0/0"=0'-0"

AutoCAD SHX Text

LEGEND NEW WALL EXISTING WALL AREA OF EXISTING STRUCTURE DEMO

AutoCAD SHX Text

KEY NOTE 1. ------

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FIRST FLOOR DEMOLITION PLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

SCALE: 3/8" = 1'-0"

AutoCAD SHX Text 2'

AutoCAD SHX Text 0'

AutoCAD SHX Text 4'

AutoCAD SHX Text 6'

AutoCAD SHX Text 8'

AutoCAD SHX Text A

AutoCAD SHX Text S6.1

AutoCAD SHX Text

ADDENDUM #1
Pre Bid Sign In Sheets
00 01 10 PROJECT MANUAL TABLE OF CONTENTS - REVISED ADDENDUM 1
00 41 13 BID FORM - REVISED ADDENDUM 1
DOCUMENT 00 41 13
BID FORM
NON-COLLUSION AFFIDAVIT
1520.05032023_A0.1 - REVISED ADDENDUM 1
Sheets and Views
A0.1
1520.05032023_A2.1 - REVISED ADDENDUM 1
Sheets and Views
A2.1

File details come from the government source that posted it. Updated .