This document consists of engineering and geological plans for the Leehmann Cow Camp Pit, a prospective material source located in Lake County, Oregon, prepared for the Oregon Department of Transportation's Lakeview-Burns Highway District 11 Chip Aggregate Production Project. The plans depict a proposed aggregate extraction and processing site situated on property in the N 1/2, SW 1/4 of Section 3, Township 30 South, Range 23 East, along Highway 049 at mile post 48.61. The project includes designated areas for new and existing aggregate processing, stockpile locations, washing facilities, and scalpings and rejects storage, with multiple test pit locations (TP22-01 through TP22-22) marked across the site. The plans are drawn to scale ratios of 1"=240' for the overall site plan and 1"=120' for sectional views, with elevations referenced to the North American Vertical Datum 1988 (NAVD88). Cross-sectional details provided on sheet GE02 illustrate the original ground conditions, proposed excavation areas, and finished ground slopes at a nominal 1V:1.5H ratio for drainage purposes.
The plans were prepared by Bobbi Jean Cummiskey, a certified Oregon Engineering Geologist (license E2783, renewing September 1, 2024), who served as designer, drafter, and reviewer. The documentation is dated January 17-18, 2024, and represents the final electronic version of the site development plans. The material source is identified with source number OR-19-011-4 and DOGAMI number 19-0094, establishing its compliance with Oregon Department of Geology and Mineral Industries designations. The plans establish property boundaries, project boundaries, existing access roads, and proposed excavation areas to facilitate the extraction and processing of chip aggregate for highway construction purposes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0 4
4370 4370
N
Scale (ft.)
Datum 1988 (NAVD88)
1. Elevations shown are based on North American Vertical
PROSPECTIVE MATERIAL SOURCE
LEEHMANN COW CAMP PIT
N 1/2, SW 1/4, Sec. 3., T. 30 S., R. 23 E., W.M.
HWY. 049, M.P. 48.61
SOURCE # OR-19-011-4 DOGAMI # 19-0094
drawing is not to scale measure one inch then
If scale bar doesn't
SCALE WARNING
24012060
L A
K E
V
IE
W
B
U R
N S
H
IG
H W
A Y
(U
S
Scalpings
Existing
New and Rejects and Washing Area
Aggregate Processing
Processing Area
Stockpile and
A
A
B
B
Leehmann_2024_GE01.dgn :: Default 1/18/2024 10:00:28 AM hwyr40f CUSTOM 2880 Scale:
2. For "Section A-A" and "Section B-B", see sheet "GE02".
TP22-01
Property Boundary
Property Boundary
P r o p e r ty B o u n d a r y
P r o p e r ty B o u n d a r y
Property Boundary
Property Boundary
PROSPECTIVE MATERIAL SOURCE
TP22-03
TP22-02
TP22-04 TP22-10
TP22-05
TP22-09
TP22-06
TP22-08
TP22-07
TP22-15
TP22-14
TP22-13
TP22-11
TP22-12
TP22-19
TP22-18
TP22-17
TP22-16
TP22-21
TP22-22
TP22-20
C RETIIFED
OREGON
E N
GINEERING GEOLO
G
STI
E2783
RENEWS: 9-1-2024
BOBBI JEAN CUMMISKEY
C RETIIFED
OREGON
E N
GINEERING GEOLO
G
STI
E2783
RENEWS: 9-1-2024
BOBBI JEAN CUMMISKEY
Property boundary
Project boundary
Existing stockpile
Proposed stockpile
Excavation area
Existing access road
Test Pit Location
Notes:
PLAN
SCALE: 1"=240'
LEGEND
Storage Area
Overburden and Washing Area
Aggregate Processing
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
LAKE COUNTY
LAKEVIEW-BURNS HIGHWAY
DISTRICT 11 CHIP AGGREGATE PRODUCTION PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
Ryan Franklin
N/A
Bobbi Jean Cummiskey
Bobbi Jean Cummsikey
GE01
drawing is not to scale measure one inch then
If scale bar doesn't
SCALE WARNING
Notes:
0 100 200 300 400 500
Distance (ft.)
PROSPECTIVE MATERIAL SOURCE
LEEHMANN COW CAMP PIT
N 1/2, SW 1/4, Sec. 3., T. 30 S., R. 23 E., W.M.
HWY. 049, M.P. 48.61
SOURCE # OR-19-011-4 DOGAMI # 19-0094
2. Elevations shown are based on North American Vertical Datum 1988 (NAVD88)
Leehmann_2024_GE02.dgn :: Default 1/17/2024 7:48:27 AM hwyr40f Scale: 1"=120'
1. For location of "Section A-A" and "Section B-B", see sheet "GE01".
0 100 200 300 400 500
Distance (ft.)
E le v a ti o n ft
700 800
E le v a ti o n ft
PROSPECTIVE MATERIAL SOURCE
C RETIIFED
OREGON
E N
GINEERING GEOLO
G
STI
E2783
RENEWS: 9-1-2024
BOBBI JEAN CUMMISKEY
Original Ground
Original Ground
1V:
1.
5H
Finished Ground
Nominal slope for drainage
Property Boundary
Project Boundary
1V:
1.
5H
Finished Ground
TP22-04
TP22-02TP22-03
TP22-03
TP22-01
Excavation area
E le v a ti o n ft
E le v a ti o n ft
SECTION A-A
VERT. SCALE: 1":120'
HORIZ. SCALE: 1":120'
SECTION B-B
VERT. SCALE: 1":120'
HORIZ. SCALE: 1":120'
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
LAKE COUNTY
LAKEVIEW-BURNS HIGHWAY
DISTRICT 11 CHIP AGGREGATE PRODUCTION PROJECT
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
Ryan Franklin
N/A
Bobbi Jean Cummiskey
Bobbi Jean Cummiskey
GE02
| Leehmann_2024_GE01 |
| Leehmann_2024_GE02 |
| 2024-01-22T10:11:03-0800 | |
| CUMMISKEY Bobbi Jean |
| 2024-01-22T10:13:02-0800 | |
| CUMMISKEY Bobbi Jean |
File details come from the government source that posted it. Updated .