This file comprises a comprehensive set of Oregon Standard Drawings (SDR) technical specifications and construction details for water infrastructure, drainage systems, and pedestrian facilities, developed by the State of Oregon Department of Transportation (ODOT) and applicable to state and local projects. The drawings establish standardized specifications for assembly operations, valve box extensions, pipe zone installations, manhole details, inlet constructions, curb and gutter installations, sidewalk design, curb ramps, and detectable warning surfaces. The specifications are effective December 1, 2025 through May 31, 2026, and apply to the SE Stephens Paving and Curb Ramp Improvements – Phase 1 project in Oregon. These technical drawings serve as design and construction standards for contractors bidding on or executing state and local infrastructure work, with materials and installations required to comply with current Oregon Standard Specifications and ASTM requirements as referenced throughout the documentation.
The specifications mandate compliance with multiple ASTM standards including ASTM C478 for precast manhole sections, ASTM C913 for precast inlets, ASTM C923 for resilient connectors, and ASTM A48 for cast iron materials. All work must be designed and certified by a registered professional engineer, and contractors must follow detailed specifications for materials such as hot-dip galvanized steel, non-shrink grout, preformed filler, and commercial-grade concrete. The drawings include specific requirements for tracer wire installation, manhole covers and frames available through ODOT's Qualified Products List (QPL), detectable warning surface truncated dome specifications with precise dimensional tolerances, and accessibility compliance for curb ramps and sidewalk design. Funding sources and bidding procedures are not specified in this technical standards document, as it functions as a reference guide for construction specifications rather than a procurement announcement or bid solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26PW01 - Bid Opening Results.pdf | ||
| Plans_Vol 1.pdf | ||
| Technical Specs.pdf | ||
| Front Ends.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RD258
ASSEMBLY
OPERATOR EXTENSION
VALVE BOX AND
R D
.d g n
25-JUL-2017N/A
J U
L
W A
T E
R iron rod
Wrought
Raised lettering
Finish grade
Cast iron cover
(6" dia. min.)
Cast iron valve box
PVC valve box extension welded to pipe shaft
2" square operator nut pipe shaft
" Schedule 802
Operator extension
"8
"x2
"x22
Flat bar cupped capscrews
"square head4
"x8 around to flat bar tube welded all long steel square
"x2"8
3"x3"x Gravel bedding
"2 inside diameter minus diameter = valve box extension welded to pipe shaft
" steel plate:8
Rock guard, See general note 8 m a x .4 m in
A d ju s ta b le to m in
F r o m m a x valve box and cover
Sliding type cast iron
Pavement or ground
PVC valve box extension
(See detail this sheet)
Operator extension
(See general note 4) or conc. block, aggregate base (4" thick)
"-0 compacted4
Finish grade
9. See project plans for details not shown.
8. Provide concrete or asphalt pad (24" square, 4" thick), when required.
7. Casting shall meet H20 load requirement.
6. Hot dip galvanize operator extension after fabrication.
" all around.4
5. Welds shall be minimum
Valves greater than 12" shall be installed on precast concrete block, (4" thick).
4. Valves 12" and smaller shall be provided with compacted aggr. base on undisturbed ground.
3. Center valve box on axis of operator nut.
2. Operator extension required when valve nut is deeper than 4' from finish grade.
1. Valve box not to rest on operating assembly.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
ASSEMBLY DETAIL
VALVE BOX
VALVE BOX EXTENSION SECTION
COVER PLAN
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
RD300
INSTALLATIONS
PIPE ZONE AND MULTIPLE
TRENCH BACKFILL, BEDDING,
R D
.d g n
14-JUL-2014N/A
J U
L
C
"A" note 4)
(See general
Tracer wire
MULTIPLE INSTALLATIONS
DIAMETER MIN. SPACE BETWEEN PIPES
(in)
"A"
(in)
"B"
(in)
"C"
(in)
"D"
TABLE A
Finish grade stabilization, as required
Trench foundation see Table A
"C" Pipe bedding, Top of subgrade as directed
Topsoil or existing material
Surfacing-match
Base material m a te r ia l
E x c a v a te d n a ti v e
C la s s A c r u s h e d r o c k
C la s s B o r m a x
1 ( c le a n s a n d
C la s s C
A s d ir e c te d m a te r ia l m a x
C la s s D p it o r b a r r u n
C L
S M
C la s s E
T re n c h b a c k fi ll a re a P ip e z o n eS e e T a b le
A
D
Nom."B" "B"
Pipe diameter
24" min.
m in
D ia
Up to 48"
48" to 72"
24"
) dia. of pipe2
One half (
4. See Std. Dwg. RD336 for tracer wire details (When required).
3. Pipes over 72" diameter are structures, and are not applicable to this drawing.
diameter.
used and the pipe is ≥ 36" diameter, increase dimension "B" to nominal pipe
2. For pipe installation in embankment areas where the trench method will not be
1. Surfacing of paved areas shall comply with street cut Std. Dwg. RD302.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
see general note 3.
For pipes over 72" diameter, the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD336
MANHOLE DETAILS
STANDARD
R D
.d g n
16-JAN-2019N/A
J U
L
X m in
Manhole cover and frame
Finish grade
(Typ.)
tracer wire fastener for
Non corrosive
Tracer wire
18" above top of manhole cover
Leave enough free wire to extend
Coil and secure wire to fastener.
precast flat slab top)
(See Std. Dwg. RD335 for
Precast conical top shown
Tracer wire
(As required) ring(s)
Precast grade
(As required)
Adjustment ring(s)
Place tracer wire directly over pipe centerline and on top of the pipe zone material.
6. All connecting pipes shall have a tracer wire, or approved alternate.
5. Adjust 24" maximum.
4. See Std. Dwg. RD344 for manhole base section.
3. See Std. Dwg. RD345 for pipe to manhole connections.
Engineer.
2. Standard precast manhole section diameter shall be 48". Use 42" if specified by the
1. All precast products shall conform to requirements of ASTM C478.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
12. See project plans for details not shown.
11. See Std. Dwg. RD342 for shallow manholes.
10. Max. pipe diameter varies with pipe material.
9. See Std. Dwg. RD356 for manhole covers and frames, manhole adjustment rings, etc.
8. See Std. Dwg. RD335 for details not shown.
See Detail "C" for alignment of steps, and manhole cover and frame.
When H=42" or less omit steps.
7. Steps shall conform to requirements of ASTM C478.
and frame
Manhole cover Finish grade
Lowest flow line outfall pipe), or as directed.
azimuth right from lowest
See plans for X (measured
Manhole steps
(Align with steps)
Manhole cover and frame
Lowes tou tfal lpip e m a x s p a c in g
H v a r
"8
6"
13" to 16"
Var.
13" to 16"
Var.
(See general note 6) (See general note 7)
NOTE: No conflict with pipe align with available shelf.
See ODOT's QPL for acceptable alternate manhole steps.
(See general note 7)
TRACER WIRE
DETAIL "A"
MANHOLE STEPS
DETAIL "B"
AND MANHOLE STEPS ORIENTATION
PRECAST FLAT SLAB TOP
OR
PRECAST CONICAL TOP
DETAIL "C"
FRONT SIDE
PLAN
PLAN
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD339
CONNECTIONS
PIPE TO STRUCTURE
R D
.d g n
REVISED NOTES07-2021
20-JAN-2023N/A
J A
N
PLAN PLAN
grout
Non-shrink
(See general note 5)
Tracer wire
(See general note 1)
Sump shown
(typ.)
grout
Non-shrink
(See general note 5)
Tracer wire (Typ.)
(See general note 1)
Sump shown
(See general note 5)
Tracer wire (Typ.)
(See general note 7)
Pipe zone (Typ.)
(See general note 7)
Pipe zone (Typ.)
(See general note 6)
Resilient connector
(See general note 5)
Tracer wire
(See general note 1)
Sump shown
(See general note 1)
Sump shown
(See general note 6)
Resilient connector (Typ.)
(See general note 5)
Tracer wire (Typ.)
(See general note 7)
Pipe zone (Typ.)
(See general note 7)
Pipe zone (Typ.)
(See general note 5)
Tracer wire (Typ.)
(See general note 6)
Resilient connector (Typ.)
CONNECTION OF FLEXIBLE PIPE TO STRUCTURECONNECTION OF RIGID PIPE TO STRUCTURE
SECTION C-CSECTION D-DSECTION A-ASECTION B-B
B
B
A A C C
D
D
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
7. Pipe zone varies, see Std. Dwg. RD300.
6. When flexible pipe is used, install resilient connectors conforming to requirements of ASTM C923.
See Std. Dwg. RD336 for tracer wire details.
5. All connecting pipes shall have a tracer wire, or approved alternate.
4. Maximum pipe diameter varies with pipe material.
3. Location, elevation, diameter, slope, and number of pipe(s) varies, see project plans.
2. See appropriate standard drawings or special project details for other similar structures.
1. See Std. Dwgs. RD364, RD365, and RD366 for inlet details not shown.
04-2022 REVISED NOTES
01-2023 REVISED DETAILS AND NOTES
(typ.)
grout
Non-shrink
(typ.)
grout
Non-shrink the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
8. See ODOT's QPL for alternate bolt-down products.
to bicycle or pedestrian use.
subject7. Manhole grate allowed only in locations not rings.
6. See ODOT's QPL for alternate manhole adjustment adjustment.
5. See Std. Dwg. RD360 for manhole frame
4. See Std. Dwg. RD336 for manhole steps.
origin.
manufacturer's initials, heat number and point of
3. Covers and frames shall be stamped with may be submerged (no holes).
2. Watertight covers required if located where cover holes maximum.have two easement areas. Covers for sanitary manholes shall drain manhole where located in pedestrian ways or
Tamperproof covers required on sanitary or storm1.
A A
PLAN
pavement, concrete gutter or walk.
frame is to be placed in concrete, Coat outside of frame with asphalt where
NOTE:
COVER SECTION A-A
FRAME SECTION A-A
"4
6" "4 3 1"
"4
2"
"4
"4
"4
2"
"8
"4
1 2 note 4.
of 20 feet or greater. See general required for mannholes with depths
*36 inch minimum diameter cover is
"4
"4
"4
"4
COVER AND FRAME
STANDARD MANHOLE
" clearance8
"4
25" (*36") " min.2 m in
"4
"4
"4
23"
"2
" chamfer8 m a x all around to a true bearing to be machined
Cover and frame
PLAN
frame. See general note 7.
For use with standard manhole
NOTE:
BB
SECTION B-B
bearing on frame around for true
Machine finish all
STANDARD MANHOLE GRATE
"4
17"
"4
"4
ADJUSTMENT RING
MANHOLE
For use with Standard Manhole Frame
SECTION C-C
PLAN
C C bearing all around
Machine to true mastic sealant
" preformed8 non-machined surfaces to be ±0.06". See general note 6 grey cast iron ASTM A48, Class 35B. Tolerance on
" and 3". Material to be2
", 2", 22
* Standard depths 1 designation heat number initials and
Manufacturer's
1" 1"
27"
23"
"4
7 "
25"
E
E
D D
Storm
PLAN
p ic k h o le
SECTION D-D
MANHOLE COVER AND FRAME
CAST IRON SUBURBAN
PLAN
SECTION E-E
AND WATERTIGHT COVER
CAST IRON TAMPERPROOF
Watertight for sanitary covers
2 holes maximum
Tamperproof, Down Detail
See Bolt
"4 or suburban pattern
Frames available in standard
BOLT DOWN DETAIL
See general note 8 so that one bolt boss is located over the manhole steps.
hexagonal head, bronze or stainless steel. Install frame
" pentagonal or2
"x12
Three required, equally spaced, NOTE:
m in m a x
26" min.
25" for details
Section A-A
See Cover 23"
"2
"4
For use on local streets only, as specified
For tamperproof and watertight covers tamperproof cover gasket, omit for
" neoprene4 cover
Manhole three required per cover stainless steel washer, " thick8
" OD x4 cover three required per
Flat rubber washer, 1"
Manhole frame maximum
Sanitary, 2 holes
RD356
AND FRAMES
MANHOLE COVERS
R D
.d g n
REVISED DETAILS AND NOTES07-2022
15-JUL-2022N/A
J U
L the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD363
AT INLET
GUTTER TRANSITION
R D
.d g n
21-JUL-2015N/A
J U
L
A
C
D
E
B
F
A B
A
D
C
E
B
F
Sl.var.
3. Vary transition section slopes to match above points.
2. Match normal pvmt. grade at points C, D, E & F.
" local depression at points A & B.2
1. Provide 1
NOTES:
Normal gutter flow line flow line
Depressed gutter
Varies, see general note 3
(Sl. var.)
Top of curbGutter flow line
"2
(See general note 5)
Pay limit for concrete inlet
(See general note 5)
Pay limit for concrete inlet
Outer wall of inlet 6" nom.
Normal gutter flow line
(Typ.)
transition section
Flare gutter in
(Seegeneralnote5)
Paylimitforconcreteinlet curb&gutter
Paylimitfor curb&gutter
Paylimitfor transition(Typ.)
3'to4'
"4 13'-4
5. Pay limit for inlet is expanded when curb and gutter are monolithic.
4. All concrete shall be commercial grade concrete.
3. For curb details, see Std. Dwgs. RD700 & RD701.
2. For frame and grate details, see Std. Dwg. RD365.
1. For inlet details, see appropriate inlet standard drawing(s).
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
PLAN VIEW
SECTION A-A
AA
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD364
TYPE G-1, G-2, G-2M, & G-2MA
CONCRETE INLETS
R D
.d g n
21-JUL-2015N/A
J U
L
4" drain pipe
Base drain, m in
INLET TYPE W W
G-1
G-2, G-2M, G-2MA
"8 71'-8"8
72'-8
"8 33'-3 "8
32'-3
TYPE G-1, G-2, G-2M
TYPE G-2MA
WITHOUT SUMP
DETAIL A
TABLE A
SECTION A - A
SECTION B - B
SECTION C-C
C C
PLAN
PLAN
B
B
A A
(See general note 5)
Tracer wire when directed
Shape bottom m in (T y p
6" W
W
6" b r e a k
G r a d e
Finish grade
(See general note 9) when required
" preformed filler,4
Subgrade
(See general note 5)
Tracer wire
(See general note 11)
(Typ.)
Pipe connection varies
(See general note 3)
Sump
"2
(See general note 4)
Curb (Type var.)
Aggr. backfill n o r m a l
6"
V a r ie s
W6" 6"
W
Normal pavement slope
(See general note 2)
Frame & grate see inlet G-2
For details not shown, face of concrete unless shown or noted otherwise
All reinforcement to be placed 2" clear of nearest
NOTE:
#4 bars @ 6"
#4 bars "2
(See general note 2)
Frame & grate
6'-0"
"4
2'-46"
"4
3'-4
(See general note 10)
Pay limit for conc. inlet
6"
1'-6"
6"
V a r ie s m in
Top of curb
4" drain pipe (Typ.)
Base drain, (Typ.)
Aggr. backfill
Subgrade
(See general note 5)
Tracer wire (Typ.)
(See general note 11)
(Typ.)
Pipe connection varies
(See general note 3)
Sump normal
6"
(See general note 11)
(Typ.)
Pipe connection varies flow line
Depressed gutter flow line
Normal gutter
(Typ.)
Slope 1:12 nom.
(See general note 9) when required
" preformed filler,4
Top back of curb
Top face of curb
(Typ.)
Aggr. backfill
4" drain pipe (Typ.)
Base drain, (See general note 9) when required
" preformed filler,4
Concrete inlet
(See general note 2)
Frame & grate
(See general note 5)
Tracer wire (Typ.)
Normal gutter flow line
11. See Std. Dwg. RD339 for pipe to structure connections.
10. See Std. Dwg. RD363 for gutter transition section, when curb and gutter are required.
" preformed filler (in concrete pavement or gutter only) to extend through thickness of concrete.4
9.
8. All concrete shall be commercial grade concrete.
7. Location, elevation, diameter, slope, and number of pipe(s) varies, see project plans.
6. Max. pipe diameter varies with pipe material.
5. See Std. Dwg. RD336 for tracer wire details, or approved alternate.
4. For curb details, see Std. Dwgs. RD700 & RD701.
3. Provide sump only where shown on plans, and allowed by jurisdiction. See Detail A for inlet without sump.
For frame and grate details, see Std. Dwg. RD365.
Type 1 grate allowed only in locations not subject to bicycle or pedestrian use.
2. Graphics show G-1 inlet with Type 2 grate. See Table A for inlet dimensions.
crushed aggregate shall be provided. All precast inlets shall conform to requirements of ASTM C913.
"-04
1. Where precast inlets are used as an alternate to cast-in-place inlets, a 4" compacted leveling bed of sand or
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD365
FOR CONCRETE INLETS
FRAMES & GRATES
R D
.d g n
14-JUL-2014N/A
J U
L all bars
Both ends "16
"4
4 corners "4 32'-4 h e x b a r o f e q u iv a le n t a r e a r o u n d r e c t.
o r
C r o s s b a r s h e x b a r o f e q u iv a le n t a r e a r o u n d r e c t.
o r
C r o s s b a r s flat bar each end
"2
"x28
"x2" or8
(Typ.)
" on center8 at 1
" flat bars2
"x28
Bearing bars
T y p ic a l a ll b a rs see general note 3
For cross bars, third inner bar and every outer bars both ends, Typical "16
"2
2" b a r s o n c e n te r s
1'-9"
(Bicycle-safe) edge flat bars
" sq.2
"x22
"8
1'-9
2 each end
"x3" bolt8 angle (Typ.)
"8
"x2
3"x2
"4
1'-10
"4
4 anchors
"4
4 corners
T y p
" (Typ.)2
2 each end
"x3" bolt8 5 "
2 each end
"x3" bolt8
(Typ.)
" on center8 at 1
" flat bars2
"x28
Bearing bars flat bar each end
"2
"x28
"x2" or8 see general note 3
For cross bars, third inner bar and every outer bars both ends, Typical
"2
2T y p ic a l a ll b a rs
3 "16
2'-3"
"2
1'-1 "2
1'-1 b a r s o n c e n te r s
(2 grates required per inlet, as shown)
(Bicycle-safe)
2"
2 each end
"x3" bolt8
"8
2'-3 edge flat bars
" sq.2
"x22 angle (Typ.)
"8
"x2
3"x2
"4
4 anchors
" (Typ.)2
T y p
(Typ.)
sq. edge flat bar
"2
"x28
"2
(Typ.)
sq. edge flat bars
"4
"x2'-62
"x28
Bearing bars
"2
"2
2'-3"
Spacing 3" O.C.
(See general note 2)
5. Cast iron grate and frame are acceptable alternates. See ODOT's QPL.
4. Hot dip galvanize after fabrication.
resistance welded or electroforged to bearing bars.
" cross bars shall be flush with the top of grate surface and may be fillet welded,8
3.
2. Type 1 grate allowed only in locations not subject to bicycle or pedestrian use.
1. For inlet details, see appropriate inlet standard drawing(s).
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
(TYPE 1)
G-2, G-2M, G-2MA, CG-2 GRATE
(TYPE 2)
G-2, G-2M, G-2MA, CG-2 GRATE
(TYPE 2)
G-1, CG-1 GRATE
G-1, CG-1 FRAME G-2, G-2M, G-2MA, CG-2 FRAME
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD366
TYPE CG-1, CG-2
CONCRETE INLETS
R D
.d g n
20-JUL-2020N/A
J U
L
(See general note 10)
Pay limit for concrete inlet
6"
6" normal
"CG-1
CG-2
"8 72'-8
"8 33'-3
"8 71'-8
"8 32'-3
INLET TYPE W W 1
(See general note 5)
Tracer wire when directed
Shape bottom
T y p m in
W
W
6" 6"
6"
6"
V a r ie s S e e g e n e r a l n o te
V a r ie s const. joint
Optional b r e a k
G r a d e
Aggr. backfill
4" drain pipe
Base drain, curb inlet channels are used.
Use details shown on Std. Dwg. RD367 when
NOTE:
(See general note 5)
Tracer wire
#3 bars
(See general note 2)
Frame & grate
Finish grade slope
Normal pvmt.
curb type match adjacent
Varies to
#5 bar
" cl.2
#3 bar
" cl.2
"4
3"
6" 2"6"
"8
8"
(See general note 4) to match curb (Type var.)
Inlet top and face
(See general note 2)
Frame & grate
Curb Opening
See Detail A
Normal pavement slopeFinish grade
(See general note 9) when required
" preformed filler,4
Subgrade
(See general note 5)
Tracer wire
(See general note 11)
(Typ.)
Pipe connection varies
(See general note 3)
Sump
4" drain pipe
Base drain, Aggr. backfill const. joint
Optional
V a r ie s n o r m a l
W
W
6"6" b r e a k
G r a d e m in
4" drain pipe (Typ.)
Base drain, (Typ.)
Aggr. backfill
Subgrade
(See general note 5)
Tracer wire (Typ.)
(See general note 11)
(Typ.)
Pipe connection varies, (See general note 3)
Sump
(See general note 11)
(Typ.)
Pipe connection varies, flow line
Depressed gutter flow line
Normal gutter
(Typ.)
Slope 1:12 nom.
const. joint
Optional
V a r ie s
"4
2'-4
"4
3'-4
6"
1'-6"
6" 6"
Top of curb
(See general note 9) when required
" preformed filler,4
(See general note 5)
Tracer wire (Typ.)
(See general note 2)
Frame & grate
Concrete inlet
Normal gutter flow line
"8
#5 bar
3. All bars shall be full length.
of concrete unless shown or noted otherwise.
" clear of nearest face2
2. All bars to be placed 1
1. #3 "a" bars to be placed during curb construction.
NOTES:
BAR "a" DETAILS
4" drain pipe (Typ.)
Base drain, (See general note 9) when required
" preformed filler,4
(Typ.)
Aggr. backfill
Top face of curb
Top back of curb #3 bars
"8 m in
(See Detail)
Bars "a", 7 #3 @ 6"
T o l.1
(See Detail)
Bars "a", 7 #3 @ 6"
CURB OPENING
DETAIL A
DETAIL B WITH-OUT SUMP
PLAN
TABLE A
SECTION A - ASECTION B - B
B
B
A A
11. See Std. Dwg. RD339 for pipe to structure connections.
(Pay limit for inlet is expanded when curb and gutter are monolithic)
10. See Std. Dwg. RD363 for gutter transition section, when curb and gutter are required.
" preformed filler (in concrete pavement or gutter only) to extend through thickness of concrete.4
9.
8. All concrete shall be commercial grade concrete.
7. Location, elevation, diameter, slope, and number of pipe(s) varies, see project plans.
6. Max. pipe diameter varies with pipe material.
5. See Std. Dwg. RD336 for tracer wire details, or approved alternate.
4. For curb details, see Std. Dwgs. RD700 & RD701.
without sump.
3. Provide sump only where shown on plans, and allowed by jurisdiction. See Detail B for inlet
For frame and grate details, see Std. Dwg. RD365.
Type 1 grate allowed only in locations not subject to bicycle or pedestrian use.
2. Graphics show CG-1 inlet with Type 2 grate. See Table A for inlet dimensions.
All precast inlets shall conform to requirements of ASTM C913.
"-0 crushed aggregate shall be provided.4 compacted leveling bed of sand or
1. Where precast inlets are used as an alternate to cast-in-place inlets, a 4"
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD371
TYPE CG-3
CONCRETE INLET BASE
R D
.d g n
21-JUL-2015N/A
J U
L
KEYWAY DETAIL PLAN
PAY LIMIT
SECTION B - B SECTION A - A
B
B
A A
PLAN
(See general note 5)
Curb and gutter
(See general note 3)
Inlet top note 4)
(See general
Tracer wire
(When reqd.)
Detail below
See Keyway
6" rad.
note 10)
(See general varies (Typ.)
Pipe connection
(See general note 7)
Sump
(See general note 4)
Tracer wire see general note 6)
(When reqd., Base drain (Typ.)
(See general note 5)
Curb and gutter
(See general note 10)
(Typ.)
Pipe connection varies
(See general note 7)
Sump
2'-0"6" 6"
V a r ie s
3'-0"
6" 2'-6"
3'-6"
V a r ie s
(See general note 3)
Inlet top
(When reqd.)
See Keyway Detail below
Subgrade
V a r ie s
6"
C u r b b a tt e r
Gutter line
Lip of gutter
Top back of curb
Top face of curb
Top of curb
3'-0" 3'-6" 3'-0"
Pay limit for concrete inlet curb & gutter
Pay limit curb & gutter
Pay limit
3'-6"
2'-6"6" 6"
S e e g e n e r a l n o te
C u r b a n d g u tt e r
(See general note 4)
Tracer wire
Gutter line
Lip of gutter
Top face of curb
C u r b b a tt e r
Top of curb
Top back of curb6"
"2
2 "2
1"
10. See Std. Dwg. RD339 for pipe to structure connections.
9. Max. pipe diameter varies with pipe material.
8. Location, elevation, diameter, slope, and number of pipe(s) varies, see project plans.
For sump details, see Std. Dwg. RD364.
7. Provide sump only where shown on plans, and allowed by jurisdiction.
6. See Std. Dwg. RD364 for base drain details.
5. See Std. Dwgs. RD700 & RD701 for curb and gutter details.
4. See Std. Dwg. RD336 for tracer wire details, or approved alternate.
3. See Std. Dwgs. RD372 & RD373 for inlet top details.
All precast inlets shall conform to requirements of ASTM C913.
"-0 crushed aggregate shall be provided.4 a 4" compacted leveling bed of sand or
2. Inlet base may be cast-in-place or precast. Where precast inlet base is used as an alternate,
1. All concrete shall be commercial grade concrete.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD372
OPTION 1, TYPE CG-3
CONCRETE INLET TOP
R D
.d g n
16-JAN-2019N/A
J U
L
E and cover (See general note 8)
" rise)2 adjustment ring (With 1
Cast iron manhole manhole adjustment ring)
#6 bars (Both ways, under
E
E
M in
.3
#3 bars
Gutterline
Bottom ofcurb&gutter
#3 bars
Gutterline
(Typ.)
bolt, with nut, galv.
"x12" anchor2
Bottom ofcurb&gutter
(When reqd.)
See Keyway Detail
"2
8"2
2'-6"
3'-6"
6" 6"
E
3"
E
6" 2'-0"
3'-0"
6"
V a r ie s manhole adjustment ring)
#6 bars (Both ways, under and cover (See general note 8)
" rise)2 adjustment ring (With 1
Cast iron manhole
Normalgutterline
"16
(When reqd.)
See Keyway Detail
2 - #6 bars)
(Under the
#4 hoop bar bolt, with nut, galv. (Typ.)
"x12" anchor2
#3 bars #3 bars
2%
B a tt e r :1 manhole adjustment ring)
#6 bars (Both ways, under
2 - #6 bars)
(under the
#4 hoop bar and cover (See general note 8)
" rise)2 adjustment ring (With 1
Cast iron manhole
Top back of curb
Top of curb
Top face of curb
Gutter line
C u r b b a tt e r
#3 bars
(Typ.)
6" rad.
(Typ.)
" rad.4
(Typ.)
bolt, with nut, galv.
"x12" anchor2
S e e g e n e r a l n o te
C u r b a n d g u tt e r
" "2
1"
6"
"2
18" (Min.)
(Bend at midway to match gutter pan) structure into gutter pan, #3 bars, project 18" (Min.) beyond
(Bend at midway to match gutter pan)
#3 bars, project 18" (Min.) beyond structure, 2 - #6 bars)
(Under the
#4 hoop bar
Top face of curb
Normal gutter line
(See SECTION B-B) structure into gutter pan, #3 bars, project 18" (Min.) beyond
KEYWAY DETAIL
PLAN
SECTION A - A SECTION B - B
B
B
A A
8. See Std. Dwg. RD356 for cast iron manhole adjustment ring and cover.
7. See Std. Dwgs. RD700 & RD701 for curb and gutter details.
6. See Std. Dwg. RD371 for inlet pay limit.
5. See Std. Dwg. RD371 for inlet base details.
7 below).
4. Vary anchor bolt length and reinforcing bar placement as required by curb exposure E (See note
3. All reinforcement shall be 2" clear of nearest face of conc., unless otherwise shown.
ASTM C913.
2. Inlet top may be cast-in-place or precast. All precast inlets shall conform to requirements of
1. All concrete shall be commercial grade concrete.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD373
OPTION 2, TYPE CG-3
CONCRETE INLET TOP
R D
.d g n
16-JAN-2019N/A
J U
L
KEYWAY DETAIL
Gutterline
EE
3"
"16
Normalgutterline
B a tt e r :1
"16
#3 bars
" (Typ.)4
3"(Typ.)
.3
M in r e c e s s
3 E E
See Assembly "B"
#6 bars
#3 bars
Assembly "A" (Typ.)
(Typ.)
bolt, with nut, galv.
"x12" anchor2
Bottom ofcurb&gutter
(When reqd.)
See Keyway Detail
6" 2'-6"
"2
8 "2
3'-6"
6"
"2
421""2
3'-6"
1'-9""2
6" 2'-6"
"2
6"
7 6 clear opening in concrete
21"x21"
(Typ.)
6" rad.
#3 bars
#3 bar
(See general note 8)
Cover with latch
#6 bars
Top back of curb
Top of curb
Top face of curb
Gutter line (Typ.)
bolt, with nut, galv.
"x12" anchor2
(Typ.)
" rad.4
3"(Typ.)
" (Typ.)4
Assembly "A"
1" dia.
Cover with Latch
Assembly "B"
S e e g e n e r a l n o te
C u r b a n d g u tt e r
C u r b b a tt e r
#6 bars
2% r e c e s s
3"(Typ.)
" (Typ.)4 bolt, with nut, galv. (Typ.)
"x 12" anchor2
"2
1 "2
1 #3 bars
(When reqd.)
See Keyway Detail
#3 bars
18"
E
6" 2'-0"
3'-0"
6"
V a r ie s
21" head bolt (Typ.)
"x3" square8
"16
"4
3"
"4
"x
"x
Ba r
1"
4"
"8
"2 pattern floor plate galv. steel raised
"8
27"x27"x " square bar8
Drill 1" dia.
"x1" long16
"x2
"x22
L4 flat bar
"8
1"x
"8
"8
"16
Weld to tubing.
" dia. washer used as a tube plug.4
2 1
" from end.8
" square bar,8
1 Washer used as spring stop. Weld washer to
"x0.125 tubing.4
4 1
3 90 lb comp. spring.
" horizontal clearance on all sides.4
" deep concrete recess, with8
Mount cover with latch flush with finish grade, in
8. Provide cover with latch per Assembly A & Assembly B, hot dip galvanize after fabrication.
7. See Std. Dwgs. RD700 & RD701 for curb and gutter details.
6. See Std. Dwg. RD371 for inlet pay limit.
5. See Std. Dwg. RD371 for inlet base details.
4. Vary anchor bolt length and reinforcing bar placement as required by curb exposure E (see note 7 below).
3. All reinforcement shall be 2" clear of nearest face of conc., unless otherwise shown.
2. Inlet top may be cast-in-place or precast. All precast inlets shall conform to requirements of ASTM C913.
1. All concrete shall be commercial grade concrete.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
s e e d
B o lt
H o le s e e d
B o lt
H o le s e e d
B o lt
H o le
6"
"2
1"
"2
ASSEMBLY ''A''
COVER WITH LATCH
ASSEMBLY ''B''
SECTION A - A
SECTION B - B
PLAN
B
B
A A
(Bend at midway to match gutter pan) structure into gutter pan, #3 bars, project 18" (Min.) beyond
(Bend at midway to match gutter pan) structure into gutter pan, #3 bars, project 18" (Min.) beyond
Top face of curb
Normal gutter line
Gutterline
Bottom ofcurb&gutter
(See SECTION B-B) structure into gutter pan, #3 bars, project 18" (Min.) beyond the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD700
CURBS
R D
.d g n
20-JUL-2020N/A
J U
L
6"
E specify in plans
Var. 24" or 30"
6"
E
" rad.4
Batter 6:1
" rad.4 seegutterpan notes
Slopevaries, T y p
2" (Typ.)
(See general note 11)
STANDARD CURB MOUNTABLE CURB
CURB ENDING DETAIL
MOUNTABLE CURB AND GUTTERCURB AND GUTTER
MOUNTABLE CURB
LOW PROFILE MODIFICATION FOR KEYWAY
WEEP HOLE DETAIL
VALLEY GUTTER
O.D.O.T. & City of Portland Standard "H"=16"
" rad.4
1:4slope
6:1
Batter
(Slope var.)
Finish grade seegutterpan notes
Slopevaries, 12"
LOW PROFILE MOUNTABLE CURB AND GUTTER
" rad.4 or specifiy in plans
18" norm.
a s d ir e c te d o n p la n s o r v a r y a s s h o w n
(Where shown on plans)
** 0" at curb ramp n o r m
1.5' 4.5'
6'
Face of curb
"2
R
1 " to joint filler (Full depth)
Preformed expansion
Asph. conc. pvmt. (ACP)
Grade of roadway upon extension of curb.
To be removed
(Slope var.)
Finish grade
" rad.4
Batter 6:1
" rad.8 m in
H v a ri a b le
E
(See general note 11)
6"
E
(See general note 11)
3" rad.
(Slope var.)
Finish grade
Batter 6:1
(Slope var.)
Finish grade m in
Batter 6:1
3" rad.
3" rad.
" rad.8
(Slope var.)
Finish grade
Batter 6:1 allowed by jurisdiction.
Vary where shown on plans, and
Vary slope as reqd. for drainage.
Slope 4.0% max. at curb ramps.
Slope 5.0% normal.
GUTTER PAN NOTES:
specify in plans
Var. 24" or 30"
6"
6" Normal curb
V a r
E seegutterpan notes
Slopevaries, Slop evar.
(1:4 max.)
Top of curb " (Max.)4
Bottom of curb
Gutter line
Batter 6:1 for each 1" difference in ''E''.
having a slope of 1:1 or steeper). Minimum desirable transition length shall be 20'
(''E'' Is the total vertical dimension of those curb surfaces
4. Transitions shall be used to connect curbs of different exposures ''E''.
3. Const. curb contraction joints at 15' maximum spacing, and at ends of each inlet and curb ramp.
ends of each driveways.
2. Const. curb expansion joints at 200' maximum spacing, and at points of tangency, and at curb. Vary as shown on plans or as directed. O.D.O.T standard "E"=7".
1. Curb exposure ''E'' = 6" to 9", as measured vertically from flowline to highest point on
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
or as directed as shown on plans
8" norm., vary
(Slope var.)
Finish grade
" rad.4 3" rad.4
1:4slope
* 0" for Truck Apron thkn. (4" min.)
Future sidewalk be poured at the same time curb and sidewalk will not
Form shelf into curb when
2"
(Type var.)
curb and gutter
Curb, or
(Where req'd.)
3" PVC pipe, (Type var.)
curb and gutter
Curb, or weep hole
3" dia.
(Slope var.)
Finish grade
5%
(Where shown on plans, and allowed by jurisdiction)
(Where shown on plans)
Var.
V a r
12"
(Slope var.)
Finish grade
20"
40"
20"
" rad.4
#4 @ 12" centers (Slope var.)
Finish grade
" rad.4
T y p .)centers
#4 @ 7"
6"
"8
1 "8
" rad.8
" rad.8
(Finishedsurface)
5.0%
(Finishedsurface
5.0%
11. On or along state highways, curb and gutter is required at curb ramp.
10. For curb ramp details, see Std. Dwgs. RD900 series.
9. For drainage curbs, see Std. Dwg. RD701.
8. For sidewalk details, and monolithic curb & sidewalk, see Std. Dwgs. RD720 & RD721.
7. Dimensions adjacent to radii are measured to the point of intersection of curb surfaces.
6. Dimensions are nominal, vary to conform with curb machine approved by the engineer.
surface slope), unless otherwise shown, or as directed.
5. Tops of all curbs shall slope toward the roadway at 1.5% max. (Max. 2.0% finished the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
R D
.d g n
J U
L
RD720
CURB LINE SIDEWALKS
UPDATED CAD STANDARDS02-2025
11-JUL-2025N/A
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
Provide compacted backfill adjacent to curb and sidewalk.10.
for expansion joints details.
expansion joints at 45-foot maximum spacing. See drawing RD722 structures. For sidewalk, monolithic curb and sidewalk, construct driveway, and other fixtures which protrude through or against the
Provide expansion joints around poles, posts, boxes, at ends of each9.
details.
ends of each curb ramp. See drawing RD722 for contraction joints
Construct contraction joints at 15-foot maximum spacing, and at8.
for contraction joint detail.
pipe. See drawing RD700 for weep hole details. See drawing RD722 plans, and allowed by jurisdiction. Place contraction joint over top of
Install 3-inch PVC weep hole pipes in sidewalks where shown on7.
midpoint. See drawing RD722 for dummy joint details.
On sidewalks 8 feet and wider, provide a longitudinal joint at the6.
and buildings.
faces higher than 5 feet such as retaining walls, sound walls, fences
Include additional paved or unpaved 2-foot shy distance to vertical.5 delineate edge.
84 inches, provide a detectable treatment below protrusion to protrudes further than 4 inches, at a height between 27 inches and as long as the 5-foot circulation path is maintained. When an object
Objects with base below 27 inches may protrude any distance4.
RD725, RD730, RD735, RD740, RD745 and RD750.
design specified. For driveway details not shown, see drawings
Fully lowered sidewalk shown; see project plans for the driveway3.
standard E=7".
For curb details, see drawings RD700, RD701 and RD702. ODOT2.
and sidewalk width as shown on plans or as directed.
Sidewalk details are based on applicable ODOT standards. Curb type1.
TYPICAL CURB LINE SIDEWALK
CROSS SECTION
TYPICAL CURB AND SIDEWALK
AND SIDEWALK CROSS SECTION
TYPICAL MONOLITHIC CURB
AROUND OBSTRUCTIONS
SIDEWALK WIDENING
see General Note 9
Width of driveway, pay limit
Sidewalk joints as required by driveway option
Driveway section pay limit (varies by option), see General Note 3Sidewalk - pay limit see General Notes 6, 8 and 9 maximum 15-foot intervals, Contraction joints at roadway Grade of
Cold joint at 5-foot nominal intervals Tooled dummy joints
General Note 2 and gutter, see Curb or curb
PLAN VIEW
weep hole pipe Coupling for
Broom pattern
Note 7 pipe, see General 3" PVC weep hole
Weep holematch joints in curb Joints in sidewalk to see General Note 2 Curb or curb and gutter, match joints in curb Joints in sidewalk to
General Note 4 obstruction, see Sidewalk
2'-0"2'-0" of 5' increments Length ≥ 5' in multiples
E see General Note 2 Curb or curb and gutter, Finish grade
Sl.var.
and sidewalk between curb Tooled cold joint
PCC2%
Note 10 see General 12" min., as required Aggregate base
See General Notes 5 and 6 Sidewalk width ≥ 6'
Area pay limit Note 10 see General 12" min., 2%
See General Notes 5 and 6 Sidewalk width ≥ 6'
Area pay limit
6"
"R43
E Sl.var.
grade Finish m in
'H v a r.
12" 9"
Batter 6:1
" deep "V" groove4
Dummy joint, as required Aggregate base
07-2025 UPDATED CAD STANDARDS, REVISED DETAILS
PLAN VIEW
1:3 minimum) (1:10 preferred, 1:5 constrained, Horizontal taper rate change
Sidewalk pay limit
Driveway pay limit, varies by option
LEGEND
(Normal sidewalk cross slope) (Maximum 2.0% finished surface slope)
Cross slope 1.5% maximum
Curb exposure, see General Note 2E
(Maximum 8.3% finished surface slope) Running slope 7.5% maximum within driveway pay limits.
mountable curb is used or 6 inch minimum PCC where minimum aggregate base and 4 inch typical. Install 6 inch� m in m in m in m in
CROSS SECTION
CLEAR CIRCULATION PATH
STORE
GENERAL
see General Note 4 wall projection, 4" maximum
Finish grade
Clear width ≥ 5' General Note4 4" max., see
Post projection
General Notes 4 and 5 outside sidewalk, see mounted obstruction Building, wall or post range detectable Cane 7 m in m a x
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
J U
L
R D
.d g n
RD721
SEPARATED SIDEWALKS
UPDATED CAD STANDARDS02-2025
11-JUL-2025N/A
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
details.
maximum spacing. See drawing RD722 for expansion joint curb and sidewalk, construct expansion joints at 45-foot through or against the structures. For sidewalk, monolithic ends of each driveway, and other fixtures which protrude
Provide expansion joints around poles, posts, boxes, at9.
contraction joint details.
and at ends of each curb ramp. See drawing RD722 for
Construct contraction joints at 15-foot maximum spacing,8.
See drawing RD722 for contraction joint details.
over top of pipe. See drawing RD700 for weep hole details.
on plans, and allowed by jurisdiction. Place contraction joint
Install 3-inch PVC weep hole pipes in sidewalks where shown7.
at the midpoint. See drawing RD722 for dummy joint details.
On sidewalks 8 feet and wider, provide a longitudinal joint6.
sound walls, fences and buildings.
vertical faces higher than 5 feet such as retaining walls, Include additional paved or unpaved 2-foot shy distance to5.
mulch surfacing.
shown or directed. Treat areas less than 12 square feet with
Provide plantings in areas 12 square feet or greater, as4.
and RD750.
shown, see drawings RD725, RD730, RD735, RD740, RD745 for the driveway design specified. For driveway details not
Driveway encroaches into sidewalk shown. See project plans3.
RD701. ODOT standard E=7".
design specified. For curb details, see drawings RD700 and
Curb and gutter shown. See project plans for the curb2.
directed.
Curb type and sidewalk width as shown on plans or as
Sidewalk details are based on ODOT applicable standards.1.
Sidewalk pay limit see General Note 3
Driveway pay limit, varies by option, LEGEND
(Normal sidewalk cross slope)
(Maximum 2.0% finished surface slope)
Cross slope 1.5% maximum
A
A
TYPICAL PLAN VIEW - SEPARATED SIDEWALK
NON-PLANTED SOFTSCAPE CROSS SECTION
Grade of
Driveway apron
Width of driveway, see General Note 9
Sidewalk - pay limitSidewalk - pay limit Joints as required by driveway option
Driveway section pay limit (varies by option), see General Note 3 weep hole pipe Coupling for
Broom pattern pipe, see General Note 7 3" PVC weep hole every 200 feet maximum profile grade, add resting area than 6 feet and ≥ 5.0% road When buffer strip is greater
Weep hole Cold joint
15" intervals, see General Note 8 Contraction joints at maximum roadway see General Note 2 Curb or curb and gutter, where specified See planting plans at 5-foot nominal intervals Tooled dummy joints from root crown Pull mulch away m u lc h
Varies min.
12" min.
12" min.
12" see General Note 4
Bufferstrip ≥ 2' see General Notes 5 and 6
Sidewalk width ≥ 6'
Area pay limit
2%
TYPICAL SETBACK SIDEWALK CROSS SECTION
SECTION A-A
Nominal thickness - varies 4" to 6" Softscape material as specified
Weed control geotextile
Nominal thickness - 6" Aggregate base
Install softscape material flush with the top of sidewalk.4.
No crushed aggregate or pea gravel allowed.3.
Sod (see planting plans)e) Sandd) Wood chips/bark mulchc) Lava rock 2-inch to 4-inch diameterb) Loose, durable round rock 2-inch to 4-inch diametera)
Approved softscape materials:2.
Use softscape materials allowed by jurisdiction.1.
NOTES:
PCC
m in m in see Planting plans Planting media, Planting plans specified, see Plantings, where of native soil compaction Break up material Aggregate base
Sl.var.
Finish grade
E see General Note 2 Curb or curb and gutter, m in
Curb exposure, see General Note 2E
07-2025 UPDATED CAD STANDARDS, REVISED DETAILS
within driveway pay limits mountable curb is used, or 6-inch minimum PCC where minimum aggregate and 4-inch typical. Install 6-inch
(Maximum 8.3% finished surface slope) Running slope 7.5% maximum curb and sidewalk backfill adjacent to Provide compacted
Softscaping, typ.
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
R D
.d g n
J U
L
RD722
TRANSITION PANELS
SIDEWALK JOINTS AND
REVISED NOTES07-2022
11-JUL-2025N/A
02-2025 UPDATED CAD STANDARDS
(Normal sidewalk cross slope)
(Max. 2.0% finished surface slope)
Slope 1.5% max.
(Max. 8.3% finished surface slope)
Slope 7.5% max.
Zero exposure
LEGEND:
New sidewalk or ramp run
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
project plan with dummy joint.
Construct decorative sidewalk scoring patterns per7.
curb.
spacing, and at each curb ramp, driveway, sidewalk and
Construct contraction joints at 15 feet maximum6.
ramp system. See drawing RD900.
with surface for structures protruding through the curb ramp runs when required. Install expansion joints flush construction. Place expansion joints outside of curb concrete pours for curb ramp system components
Do not place expansion joints between separate5.
specified.
curb details. See project plans for the curb design
See drawings RD700, RD701 and RD702 for concrete4.
joint at the midpoint of sidewalk panel.
On sidewalks 8 feet and wider, provide a longitudinal3.
expansion joints at 45 feet maximum spacing.
monolithic curb and sidewalk, provide construction through or against the structures. For sidewalk, of each driveway and other fixtures which protrude
Provide expansion joints around poles, boxes, at ends2.
and design specified.
details. See project plans for sidewalk width, placement
See drawings RD720 and RD721 for concrete sidewalk1.
E
D
C
D
C
E
SIDEWALK AND CURB RAMP TRANSITION PANELS
(Curb line sidewalk with curb and gutter shown)
JOINT DETAIL
SIDEWALK TRANSITION PANEL SHOWN
SECTION A-A
CURB RAMP TRANSITION PANEL SHOWN
SECTION A-APLAN
(see General Note 6)
CONTRACTION JOINT
(see General NoteS 2 and 5)
EXPANSION JOINT
"2 m a x
R joint filler
Preformed expansion
" deep 'V' groove4
"4
" to8
R m in
T /3 th ic k n e s s
T
GeneralNotes1and3
Sidewalkwidth,see
'm ax im um 'm ax im um finish, typ.
Broomed
General Note 5 gutter, see
Curb or curb and and sidewalk in both curb
Expansion joint sidewalk only
Dummy joint in to be generally square
Sidewalk panels are both curb and sidewalk
Contraction joint in
New sidewalk
≥ 6' Transition panel Existing sidewalk
Roadwaygrade existinggrade
X %1 grade (X % = X %) Match existing sidewalk
1 2
Curb ramp run
≥ 6' Transition panel Existing sidewalk existinggrade X %1 grade (X % = X %) Match existing sidewalk
1 2
7.5%maximum Curbramprunningslope
Transition panel Existing sidewalk or ramp run
New sidewalk cross slope Match existing
Match existing profile grade Level area when required
≤ 0.5% per foot slope change is Rate of cross rate change Horizontal taper
1:3 minimum 1:5 constrained 1:10 preferred
A A transitiongrade X %2 transitiongrade X %2 sidewalk or curb ramp run.
transition panel to new profile grade through Project the existing sidewalk
07-2025 UPDATED CAD STANDARDS, REVISED DETAILS
(see General Note 7)
DUMMY JOINT
C
D
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
R D
.d g n
J A
N
RD900
AND LEGEND
CURB RAMP COMPONENTS
10-JAN-2025N/A
TYPICAL CURB RAMP SYSTEM COMPONENTS
(PERPENDICULAR TYPE SHOWN)
Sidewalk Flared side
Fla re slo pe crosswalk
Intended
(depressed curb)
Curb running slope gutter flowline
Grade break at
RR1
Running slope
Return curb
(non-walkable)
Buffer strip
Cu rb op en in g wi dt h break
Grade space/landing)
Level area (turning
INTERSECTION CONDITION TYPES
=SY
=SU
=MB
flow slope
Stop or Yield, maximum 2.0% finished gutter finished gutter flow slope
Signalized or uncontrolled, maximum 5.0% finished gutter flow slope
Midblock, less than or equal to roadway grade Marked or intended crossing location
Sidewalk or other traversable surface
Detectable warning surface (DWS)
4'x4' clear space
Ramp Run position 1
(Normal sidewalk cross slope)
(Maximum 2.0% finished surface slope)
Cross slope 1.5% maximum aximum 10.0% finished surface slope)(M
Flare slope
Level area (Turning space/landing)
LEGEND:
RR1
(Maximum 8.3% finished surface slope)
Running slope 7.5% maximum
(Maximum 4.9% finished surface slope)
Running slope 4.0% maximum
Slope as required for drainage
(Maximum 5.0% finished surface slope)
Counter slope 4.0% maximum ascending or descending
CURB RAMP INDEX
NUMBER
STANDARD DRAWING
RD900
STANDARD DRAWING TITLE
RD901
RD902
RD904
RD905
RD906
RD908
RD909
RD910
RD912
RD913
RD916
RD920
RD922
RD930
RD932
RD936
RD938
RD940
RD950
RD952
RD960
Curb Ramp Components and Legend
Curb Ramp Legend and Corner Identification
Detectable Warning Surface Details
Detectable Warning Surface Placement For Curb Ramps
Detectable Warning Surface Placement For Directional Curbs
Detectable Warning Surface Placement For Accesible Route Island
Detectable Warning Surface Placement For Rail
Detectable Guide Strip Placement at Bike Ramps
Perpendicular Curb Ramp
Perpendicular Curb Ramp
Perpendicular Curb Ramp With Closure
Perpendicular Curb Ramp Single Ramp
Parallel Curb Ramp
Parallel Curb Ramp Single Ramp
Combination Curb Ramp
Combination Curb Ramp
Combination Curb Ramp
Combination Curb Ramp Single Ramp
Blended Transition Curb Ramp Single Ramp
End of Walk Curb Ramp
End of Walk Curb Ramp
Unique Curb Ramp with pavement typical, flush
Curb and gutter, warning surface
Detectable
11-2023
UPDATED CAD STANDARDS
REVISED LEGEND
01-2025
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2025 - May 31, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
RD901
CORNER IDENTIFICATION
CURB RAMP LEGEND AND
10-JAN-2025N/A
12-2023 REVISED NOTES
01-2025 UPDATED CAD STANDARDS
R D
.d g n
J A
N
Hwy No. ID
Suffix Type
Example:
228 00 I 00
STANDARD ABBREVIATION FOR CURB RAMP DETAILS
PAR
DWS
LA
XS
TS
cl.sp.
RRN
CS
E
GS
gtr.
BFC
TBC
TFC
FG
Pedestrian Access Route
Detectable Warning Surface
Level Area
Cross Slope
Turning Space
Clear Space
Ramp Run Number, i.e. RRX
Counter Slope on gutter pan (%)
Curb Exposure (inch), i.e. X"
Gutter Slope (%), i.e. X.X%
Gutter (elevation ft.)
Bottom Face of Curb (elevation ft.)
Top Back of Curb (elevation ft.)
Top Face of Curb (elevation ft.)
Finish Grade (elevation ft.) i.e. FG XXX.XX’ position and curb ramp position diagram).
numbering in consecutive order. Proceed following the pedestrian route and in Corner Position Number order (see corner encountered in the increasing mile point direction is number ramp 1. Then proceeds counterclockwise around the corner, is a number given to each curb ramp beginning with Corner Position 1. The first curb rampCurb Ramp Position has a corner position number of 2A (see corner position and curb ramp position diagram).
is added to the number for an island. For example an island between corner positions 1 and 2 and is closer to corner 2 and proceeding counterclockwise around the intersection, numbering consecutive 1 through the end of corners. An "A" is based on traveling in the increasing mile point direction, beginning with the first corner on the rightCorner Position of an intersection is based on the mile point of the center of the intersection listed to the hundredth of a mile.Milepoint lapping mileage is listed as "z" mileage.
Mileage Type is used when there are multiple locations of the same mile point on a section of highway. Overlay4) an "I" roadway and a "D" roadway. Check the Digital Video Log to be sure of the direction.
east. Note I-5 does not follow this rule. Generally "I" will be used. When there is a separated highway there will be mile point direction and "D" for decreasing mile point direction. For most highways, the "I" direction is south and Roadway ID is a one letter code used to identify alignment. There are two possible letter codes; "I" for increasing3)
Information. If the intersection is not located on a connection use 00 for the code.
layer > Hwy Network-Colored layer for visual reference. Select "Identify Features" and click on Map Position to see
, Road NetworkFACS-STIP web based applicationexample AA or AB. Use the Identify Features tool on the ODOT Highway Suffix is a letter format assigned to frontage roads and connections to identify the unique connection, for2) numbers are 001 through 493.
The Highway Number is a 3-digit number (not the route number) assigned to all state highways by ODOT. Valid1)
There is a four part format for the code: Highway Number; Highway Suffix; Roadway ID, Mileage Type.
This is a code to identify the intersection on a specific state highway.
see Information.
to see LRM and corner position number of curb ramps inventoried. Select "Identify Features" and click on Map Position to orners and ADA RampsC, turn on layers…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .