This solicitation is seeking sealed bids for the rehabilitation of the Wallops Island Causeway Bridge project VA ST NASA 1(8) located in Accomack County, Virginia. The project consists of repairing concrete beams, resealing expansion joints, wrapping concrete beams with glass fiber reinforced polymer, and other miscellaneous work. The project will be split into multiple work schedules and contract options, with a total cost expected between $1 million to $5 million. Bids are due on a date specified in Block 13a of the solicitation. A pre-bid meeting will be held at a location specified in Section E. Annual representations and certifications must be completed online at beta.sam.gov. Subcontracting plans are required from non-small businesses for opportunities over $700,000 and must be approved by the Office of Small Disadvantaged Business Utilization prior to award.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R01 19213
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d g n
NO. DATE REVISIONS NO. DATE BY REVISIONS
INDEX OF DRAWINGS
DRAWING TITLESHEET NO.
GENERAL NOTES AND INDEX
GENERAL NOTES:
SPECIFICATIONS:
Construction:
Design:
Composite fabric:
FP-14.
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, MATERIALS:
Concrete:
Concrete: 150 pcf
AASHTO HS-20
DESIGN LOADS:
Dead load:
Live load:
A C
T U
A L F I L E R
N A
S A
G N .D
G N
R53
R52
R51
R50
R49
R48
R47
R46
R45
R44
R43
R42
R41
R40
R39
R38
R37
R36
R35
R34
R33
R32
R31
R30
R29
R28
R27
R26
R25
R24
R23
R22
R21
R20
R19
R18
R17
R16
R15
R14
R13
R12
R11
R10
R09
R08
R07
R06
R05
R04
R03
R02
R01
Penetrating sealant:
Furnish a penetrating sealant containing silane conforming to Subsection 725.20.
AASHTO LRFD Bridge Design Specifications, 8th Edition, 2017
SCOPE OF WORK
composite fabric with a manufacturer's representative present.
Follow manufacturer's recommendations and specifications for installation of composite fabric. Install existing GFRP repairs.
Apply a ultraviolet-resistant coating to applied GFRP wrap matching the color and texture of the overhangs of the pier caps, and external post-tensioning tendons.
Use a bidirectional glass composite fabric (GFRP) for the protection of beam underside repairs, the beams with damaged prestressing strands.
Use a unidirectional carbon fiber reinforced polymer (CFRP) for the strengthening of prestressed
Silicone joint sealant:
Pier 20 Repair Details
Pier 19 Repair Details
Pier 18 Repair Details
Pier 17 Repair Details
Pier 16 Repair Details
Pier 15 Repair Details
Pier 14 Repair Details
Pier 13 Repair Details
Pier 12 Repair Details
Pier 11 Repair Details
Pier 10 Repair Details
Pier 9 Repair Details
Pier 8 Repair Details
Pier 7 Repair Details
Pier 6 Repair Details
Pier 5 Repair Details
Pier 4 Repair Details
Pier 3 Repair Details
Pier 2 Repair Details
Pier 1 Repair Details
Pier Repair Details
Abutment Repair Details
Span 21 Repair Details
Span 20 Repair Details
Span 19 Repair Details
Span 18 Repair Details
Span 17 Repair Details
Span 16 Repair Details
Span 15 Repair Details
Span 14 Repair Details
Span 13 Repair Details
Span 12 Repair Details
Span 11 Repair Details - 2
Span 11 Repair Details - 1
Span 10 Repair Details
Span 9 Repair Details
Span 8 Repair Details
Span 7 Repair Details
Span 6 Repair Details
Span 5 Repair Details
Span 4 Repair Details
Span 3 Repair Details
Span 2 Repair Details
Span 1 Repair Details
Span 8 and 11 - Post-Tensioning Tendon Repair Details
Typical Prestressed Beam Repair Details
Concrete Deck Repair (Bottom)
Concrete Deck Repair (Top)
Concrete Repair Details
Typical Section - 83'-6'' Span
Typical Section - 60'-0'' Span
Plan and Elevation
General Notes and Index
No Scale
Perform the following repairs:
Dispose of all debris and waste materials off of government property.
performing repair work.
Dimensions for existing structure and designated repair areas are approximate. Verify dimensions before and waste materials generated during repair work.
Access bridge site and maintain traffic control for work operations. Control and contain all dust, debris, Furnish backer rod conforming to Subsection 712.01(f).
resealing abutment joints.
Furnish a two-part, self-leveling, silicone joint sealant conforming to Subsection 712.01(h) for
Replace weight limit sign at west approach.12.
Clean and reseal expansion joints at abutments with silicone joint sealant and backer rod.11.
Seal bridge deck with penetrating sealant.10.
Repair concrete at top and bottom of deck.9.
penetrating sealant.
Clean and seal the top 8 feet of cylinder piles and the entire surface of both abutments with 8.
sealant, and protect the pier cap overhangs with GFRP wrap.
Locate and repair damaged concrete at piers. Clean and seal the pier caps with penetrating 7.
Clean and seal the sides of prestressed beam ends with penetrating sealant.6.
11.
Repair the GFRP wrap around the existing external post-tensioning tendons in Span 8 and Span 5.
Wrap the bottom of designated existing beams with GFRP wrap.4.
system to restore original beam flexural capacity at midspan.
Inspect existing beams and identify any damaged strands. Design and install CFRP strengthening 3.
HES concrete to restore original shape.
Remove shotcrete and damaged concrete from the underside of designated beams, and apply 2.
Repair damaged concrete sides of on existing beams, as directed by the CO.1.
strength in 24 hours of 3,000 pounds per square inch.
Furnish High Early Strength (HES) concrete (or shotcrete) with a minimum compressive
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d g n
PROJECT TEAM LEADER
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BRP NO.
BRIDGE PLAN SHEET
VA
53 BRP-1275
WALLOPS ISLAND CAUSEWAY BRIDGE OVER CAT CREEK
WALLOPS FLIGHT FACILITY
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
Christopher NegleyCC CC HC November 2019of
DATE
BRP NO.BRIDGE PLAN SHEET
November 2019
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
Christopher NegleyCC CC HC
19214R02
PLAN AND ELEVATION
-N o v -2
1:
P
M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d g n
PLAN
ELEVATION
N Bridge length = 1283'-7''
To Assawoman
To Wallops Island
KEY
CL
E
F
Expansion
Fixed
Pier #
Span number
E F
2 3
16 17
20 21
C a t
C r e e k
FE FE FE FE FE FE FE FE FE EE EF EF EF EF EF EF
EFEF
EF
111+00 112+00 113+00 115+00 116+00 117+00 118+00 119+00 120+00 121+00 122+00 123+00 124+00 125+00
83'-6'' 60'-0"60'-0"60'-0"60'-0"60'-0"60'-0"60'-0"60'-0"60'-0"60'-0"60'-0" 60'-0" 60'-0" 60'-0" 60'-0" 60'-0" 60'-0" 60'-0"
1283'-7''
F F4 c le a r
2.25'± weight limit sign
Remove and replace damaged
16'-0"
Approach slab
16'-0"
Approach slab
C Roadway
C Structure
L
L
A C
T U
A L F I L E R
N A
S A P
E .D
G N
Not to Scale
''2 160'-0''2
160'-0
114+00
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
Christopher NegleyCC CC HC
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d g n
PROJECT TEAM LEADER
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19215R03
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
TYPICAL SECTION
''= 1'-0"4 3Scale:
CL
11'-0"11'-0"1'-0" 1'-6"
2'-6"
1'-6" 1'-0"
2'-6"
27'-0"
3'-0" 7'-0" 7'-0"3'-6"3'-6"
Profile grade
S la b
22'-0" Roadway
CL CL
NEAR PIER
NEAR MIDSPAN
Interior beam (Typ.) Exterior beam (Typ.)
UTILITY DETAILS
''= 1'-0"4 3Scale:
As Shown
Telephone conduit
Electrical conduits
Utility conduit
Insulated water pipe
Concrete diaphragm
(Typ.)
TYPICAL SECTION - 60'-0'' SPAN
Electrical conduits (Typ.)
B1 B2 B3 B4
B1 B4
Conduit (Typ.)
Constr. jt. (Typ.)
6'' Dia. force main
(Typ.) (See Note 1)
External post-tensioning
(See Note 1)
External post-tensioning (Typ.)
Existing abutment
Existing profile
1"
ABUTMENT JOINT DETAIL
(Utilities not shown for clarity)
(Looking upstation)
(Typ.)
Existing shotcrete
Symm. about C Structure
A C
T U
A L F I L E R
N A
S A
B T
Y P S
E C
T .D
G N
Not to Scale sealant and backer rod from top of curb to top of curb.
Clean and reseal abutment joints. Apply a silicone joint
Remove existing expansion joint sealant at abutment. 2.
span locations.
spans 8 and 11. See "PLAN AND ELEVATION" sheet for
External post-tensioning tendons are located only at 1.
Notes:
M in
R e c e s s
POURABLE JOINT
JointCL
See "Pourable Joint"
Backer rod sealant
Silicone joint or slab
Top of deck
(Typ.)
surface or slab
Existing wearing
Not to Scale
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d g n
PROJECT TEAM LEADER
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
Christopher NegleyCC CC HC November 2019
19216R04
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
11'-0"11'-0"1'-0" 1'-6"
2'-6"
1'-6" 1'-0"
2'-6"
27'-0"
3'-0" 5'-3" 5'-3"5'-3"5'-3"
Profile grade
S la b
22'-0" Roadway
CL CL
NEAR PIER
NEAR MIDSPAN
Interior beam (Typ.) Exterior beam (Typ.)
As Shown
Telephone conduit
Electrical conduits
UTILITY DETAILS
''= 1'-0"4 3Scale:
Utility conduit
Insulated water pipe
Concrete diaphragm
(Typ.)
TYPICAL SECTION - 83'-6'' SPAN
Electrical conduits (Typ.)
''= 1'-0"4 3Scale:
TYPICAL SECTION
B5B1
B1 B2 B3 B4 B5
Conduit (Typ.)
Constr. jt. (Typ.)
6'' Dia. force main
A C
T U
A L F I L E R
N A
S A
B T
Y P S
E C
T .D
G N
(Utilities not shown for clarity)
(Looking station ahead)
CLSymm. about C Structure
External post-tensioning (Typ.)
External post-tensioning (Typ.)
November 2019
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
Christopher NegleyCC CC HC
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d g n
PROJECT TEAM LEADER
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
19217R05
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
'' under cut all sides2
= 300 lbs.
direction. Min. pull out tension @ max. spacing of 12'' in each (length varies) with sleeve anchor
'' dia. Galvanized machine bolt4 concrete Face of existing
'' Saw cut2
1'' Min. clr.
Existing reinforcement '' Min.2 concrete Face of existing
'' Saw cut4
= 300 lbs.
direction. Min. pull out tension @ max. spacing of 12'' in each (length varies) with sleeve anchor
'' dia. Galvanized machine bolt4
'' Min.2
Existing reinforcement
1'' Min. clr.
Not to Scale
Galvanic anode top cut
'' Under cut all sides except2
A C
T U
A L F I L E R
N A
S A
C O
N C
R E P
D T S .D
G N
CONCRETE REPAIR DETAILS
2'' x 2'', w2 x w2
Stainless steel welded wire reinforcement
2'' x 2'', w2 x w2
Stainless steel welded wire reinforcement concrete Face of existing Depth of concrete repair
Existing reinforcement
CYLINDER PILE AND POST-TENSIONING ANCHORAGE REPAIR
TYPICAL HORIZONTAL CONCRETE REPAIR TYPICAL VERTICAL CONCRETE REPAIR
Depth of concrete repair (varies)
Depth of concrete repair (varies) anode
Galvanic existing concrete.
Cure and finish surfaces to match color and texture of 5.
552.19.
Fill cavity with repair concrete according to Subsection 4.
Section 203.
abrasive blasting, or water jetting as required, according to
Clean existing reinforcing steel and concrete by wire brush, 3.
cylinder pile.
steel reinforcement or removing the entire thickness of the using hand tools, without incurring any damage to existing
Remove loose and deteriorated concrete to sound concrete 2.
depth of reinforcing steel may vary.
Locations of concrete repair areas are approximate, and 1.
post-tensioning anchorages:
Notes for repair of hollow cylinder pile sections and
Repair mortar
Repair mortar existing concrete.
Cure and finish surfaces to match color and texture of 9.
Fill cavity with repair mortar according to Subsection 552.19.8.
reinforcement/concrete with machine bolts.
Fasten steel welded wire reinforcement to existing 7.
applicable.
Match existing reinforcing steel diameter and coating, if
Replace reinforcing steel with greater than 25% section loss. 6.
Section 203.
abrasive blasting, or water jetting as required, according to
Clean existing reinforcing steel and concrete by wire brush, 5.
steel reinforcement.
reinforcement, without incurring any damage to existing or to a depth of at least 1 inch clear of existing
Remove loose and deteriorated concrete to sound concrete 4.
by the CO.
perimeter around the designated repair area, as approved inch deep along a square or rectangular 4 3Saw cut 3.
approved by the CO.
areas according to manufacturer's recommendations, as
Install cathodic anodes for corrosion protection on repair 2.
depth of reinforcing steel may vary.
Locations of concrete repair areas are approximate, and 1.
Notes for typical concrete repair:
Repair mortar
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d g n
PROJECT TEAM LEADER
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
Christopher NegleyCC CC HC x x x x
19218R06
-N o v -2
1:
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d g n
N Bridge length = 1283'-7''
12 SQFT
1 SQFT
2 SQFT
6 SQFT
6 SQFT
2 SQFT
1 SQFT
3 SQFT
2 SQFT
2 SQFT
6 SQFT
6 SQFT
10 SQFT7 SQFT
LC Structure
LC Roadway
Curbline
Face of parapet
Curbline
Face of parapet
60'-0" 60'-0" 60'-0" 60'-0" 60'-0" 60'-0" (Cont.)
60'-0" 60'-0" 60'-0" 83'-6" 60'-0" 60'-0" 60-0" (Cont.)
2 SQFT
1 SQFT
1 SQFT
1 SQFT
55 SQFT
40 SQFT
1 SQFT
2 SQFT
7 SQFT
2 SQFT
2 SQFT
2 SQFT
2 SQFT
3 SQFT
2 SQFT
2 SQFT
2 SQFT
1 SQFT
3 SQFT
3 SQFT
2 SQFT
2 SQFT
1 SQFT
3 SQFT
2 SQFT
2 SQFT
1 SQFT
3 SQFT
2 SQFT
2 SQFT 2 SQFT
CONCRETE DECK REPAIR (TOP)
A C
T U
A L F I L E R
N A
S A
D E
C K
R E P
A I R .D
G N
Key:
Damaged concrete
Not to Scale
"2 160'-0
"2 160'-060'-0"60'-0"60'-0"60'-0"60'-0"60'-0"
Seal top of deck with penetrating sealant.4.
foot, as approved by the CO.
delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
Christopher NegleyCC CC HC of
November 2019
19219R07
-N o v -2
1:
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d g n
N Bridge length = 1283'-7''
2 SQFT
6 SQFT 1 SQFT
1 SQFT
2 SQFT
1 SQFT
1 SQFT
2 SQFT
3 SQFT
2 SQFT
exposed reinforcement
2 SQFT with
10 SQFT
3 SQFT
(Cont.)60'-0" 60'-0" 60'-0" 60'-0" 60'-0"
(Cont.)(Cont.) 60'-0" 60'-0" 60'-0" 83'-6" 60'-0" 60'-0" 60'-0"
(Cont.)
20 SQFT
Approach Bridge
Approach Bridge
Intermediate diaphragm
(Typ.)
S p a
CONCRETE DECK REPAIR (BOTTOM)
A C
T U
A L F I L E R
N A
S A
D E
C K
R E P
A I R .D
G N
Not to Scale
Key:
Damaged concrete
1 SQFT
1 SQFT
Cracked concrete (See Note 3)
2 SQFT
S p a n s t o t o
A A
S H
T O T y p e I I I
S p a n
A A
S H
T O T y p e I I I
S p a
"2 160'-0
"2 160'-060'-0"60'-0"60'-0"60'-0"60'-0"60'-0" foot, as approved by the CO.
delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d g n
PROJECT TEAM LEADER
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
19220R08
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
As Shown
8"
EXISTING TYPICAL 60'-0'' GIRDER SECTION
CL
TYPICAL PRESTRESSED BEAM
1'-11"
1'-5"
'' = 1'-0''2 1Scale:
A
A
B
B
CL
SPAN BEAM
'' = 1'-0''2 1Scale: 1 '' = 1'-0''2
1Scale: 1 '' = 1'-0''2 1Scale: 1
REPAIR DETAILS
SPAN BEAM
1,2,4
1,4
1,2,3,4
1,2,3,4
1,2
1,2,3,4
1,2,3,4
SECTION A-A SECTION B-B
HES concrete HES concrete
A C
T U
A L F I L E R
N A
S A
B E
A M
R
E P
A I R
D T S .D
G N
60'-0"
C PierC PierCL Concrete diaphragm (Typ.)
(See Note 4)
3'-0"
(See Note 4)
3'-0"
4'-6" 4'-6"
(See Note 2)
GFRP wrap
(See Notes 1 and 2)
Damaged concrete
TYPCAL 60'-0'' SPAN BEAM ELEVATION
C Beam
CLC Beam CLC Beam
(See Note 2)
GFRP wrap
(See Notes 1 and 2)
Damaged concrete
CFRP (See Note 3) shotcrete (approx. 2")
Remove existing
132 2
14 3,4
1,2,3,4
12 1,2,3,4
1,3
2,4
17 2,3
18 1,2,3,4
3,4
20 3
UNDERSIDE REPAIR AND EGFRP WRAP CFRP STRENGTHENING
CFRP strengthening for girders with damaged strands (Not to scale) (See Note 3)
GFRP wrap (See Note 2)
Limit of shotcrete removal, underside repair, and GFRP wrap
51'-0"
REPAIR TABLE
BEAM UNDERSIDE
REPAIR TABLE (CONT.)
BEAM UNDERSIDE
S e e N o te
S e e N o te
Prevent any damage to existing components during repair work.5.
penetrating sealant to the sides of the beams.
Clean 3 feet on each end of all prestressed beams and apply 4.
Existing reinforcing steel: fy = 40 ksi
" stress-relieved, fu = 250 ksi16 7Existing prestressing strand:
Existing prestressed concrete compressive strength: f'c = 5 ksi
AND 11 - POST-TENSIONING TENDON REPAIR DETAILS" sheet.
5'-0" beyond the damaged region. For prestress details, see "SPAN 8 capacity at midspan, as directed by the CO. Extend the CFRP wrap strands, design and install CFRP repairs to restore original flexural
For beams listed in "BEAM UNDERSIDE REPAIR TABLE" with damaged 3.
beams using GFRP wrap, and apply an ultraviolet-resistant coating.
the beam. Apply a layer of HES concrete, wrap the bottom of the to 6 inches (average 4 inches). Epoxy seal cracks on the underside of sheet. Approximate total depth of concrete and shotcrete removal is 2 of the beam according to "TYPICAL CONCRETE REPAIR DETAILS" existing shotcrete, and repair any damaged concrete on the underside
For beams listed in "BEAM UNDERSIDE REPAIR TABLE", remove 2.
locations and additional details.
sides of beams. See span repair details sheets for approximate
Inspect all beams and identify and repair damaged concrete along 1.
Notes:
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d g n
PROJECT TEAM LEADER
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
Christopher NegleyCC HC
19221R09
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
As Shown
CL CL
'' = 1'-0''2 1Scale:
'' = 1'-0''2 1Scale: 1 '' = 1'-0''2
1Scale: 1
SPAN 8
TYPICAL SECTION
SPAN 11
TYPICAL SECTION
PierPier
TENDON REPAIR DETAILS
(Typ.) (See Note 2)
Post-tensioning anchor
GIRDER ELEVATION EXISTING SPANS 8 AND 11
A C
T U
A L F I L E R
N A
S A
B E
A M
R
E P
A I R
D T S .D
G N
Existing external post-tensioning duct (See Note 4)
3'-0"
(See Note 4)
3'-0"
83'-6" (Span 11)
60'-0" (Span 8)
CLC Beam CLC Beam
Existing external post-tensioning duct
(Typ.) (See Note 1)
Existing external post-tensioning duct
(Typ.) (See Note 1)
SPAN 8 AND 11 - POST-TENSIONING
Existing CFRP Existing CFRP
Existing GFRP wrap Existing GFRP wrap
Existing GFRP wrap
S p a
S p a
Prevent any damage to existing components during repair work.5.
penetrating sealant to the sides of the beams.
Clean 3 feet on each end of all prestressed beams and apply 4.
Prevent any damage to exisitng components during repair work.3.
shotcrete and encase the existing post-tensioning anchorages.
in Span 8 using hand tools. Apply concrete to replace the existing
Remove deteriorated shotcrete from post-tensioning anchorages 2.
the post-tensioning duct in GFRP wrap.
in the existing GFRP wrap is found, wrap the exposed portion of ducts. Where the post-tensioning duct is exposed, or any defects
Inspect all existing GFRP wrap around external post-tensioning 1.
Notes:
November 2019
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
Christopher NegleyCC HC
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d g n
PROJECT TEAM LEADER
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
19222R10
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
SPAN 1 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 1 Abutment 1
Face of backwall
C Pier 1 Abutment 1
Face of backwall
CL
CL
1' x 1'
1.5' x 2'
See Note 3
1.5' x 1.5'
See Note 3
See Note 3
1' x 1.5'
See Note 3
C Pier 1 Abutment 1
Face of backwall
CL
C Pier 1 Abutment 1
Face of backwall
CL
C Pier 1 Abutment 1
Face of backwall
CL
C Pier 1 Abutment 1
Face of backwall
CL
C Pier 1 Abutment 1
Face of backwall
CL
C Pier 1 Abutment 1
Face of backwall
CL
installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19223R11
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 2 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 2
C Pier 2
CL
CL
1' x 1.5'
C Pier 1CL
C Pier 1CL
0.5' x 2'
2' x 3' 1' x 1.5'
1.5' x 1.5'
1.5' x 1'
See Note 3 1' x 1'
1' x 1.5'
1' x 1' See Note 3
C Pier 2CL C Pier 1CL
C Pier 2CLC Pier 1CL
C Pier 2CL C Pier 1CL
C Pier 2CLC Pier 1CL
C Pier 2CL C Pier 1CL
C Pier 2CLC Pier 1CL installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19224R12
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 3 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 3
C Pier 3
CL
CL
C Pier 2CL
C Pier 2CL
See Note 3
See Note 3
1' x 2'
C Pier 3CL C Pier 2CL
C Pier 3CLC Pier 2CL
C Pier 3CL C Pier 2CL
C Pier 3CLC Pier 2CL
C Pier 3CL C Pier 2CL
C Pier 3CLC Pier 2CL installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19225R13
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 4 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 4
C Pier 4
CL
CL
C Pier 3CL
See Note 3
C Pier 3CL
See Note 3 See Note 3
1' x 1'
1' x 1'
1' x 1.5'
C Pier 4CL C Pier 3CL
C Pier 4CLC Pier 3CL
C Pier 4CL C Pier 3CL
C Pier 4CLC Pier 3CL
C Pier 4CL C Pier 3CL
C Pier 4CLC Pier 3CL installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19226R14
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 5 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 5
C Pier 5
CL
CL
C Pier 4CL
C Pier 4CL
See Note 3
See Note 3
See Note 3
See Note 3
1' x 1'
C Pier 5CL C Pier 4CL
C Pier 5CLC Pier 4CL
C Pier 5CL C Pier 4CL
C Pier 5CLC Pier 4CL
C Pier 5CL C Pier 4CL
C Pier 5CLC Pier 4CL installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19227R15
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 6 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 6
C Pier 6
CL
CL
C Pier 5CL
C Pier 5CL
See Note 3
See Note 3
C Pier 6CL C Pier 5CL
C Pier 6CLC Pier 5CL
C Pier 6CL C Pier 5CL
C Pier 6CLC Pier 5CL
C Pier 6CL C Pier 5CL
C Pier 6CLC Pier 5CL installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19228R16
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 7 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 7
C Pier 7
CL
CL
C Pier 6CL
C Pier 6CL
See Note 3
2' x 0.5'
0.5' x 2.5'
See Note 3
See Note 3
See Note 3
See Note 3
See Note 3
C Pier 7CL C Pier 6CL
C Pier 7CLC Pier 6CL
C Pier 7CLC Pier 6CL
C Pier 7CL C Pier 6CL
C Pier 7CLC Pier 6CL
C Pier 7CL C Pier 6CL installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19229R17
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 8 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 8
C Pier 8
CL
CL
C Pier 7CL
C Pier 7CL
1' x 1'
3' x 1.5'
2' x 1.5' 1' x 2'
2' x 3'
See Note 3
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
C Pier 8CL C Pier 7CL
C Pier 8CLC Pier 7CL
C Pier 8CL C Pier 7CL
C Pier 8CLC Pier 7CL
C Pier 8CL C Pier 7CL
C Pier 8CLC Pier 7CL
See Note 3 installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19230R18
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 9 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 9
C Pier 9
CL
CL
C Pier 8CL
C Pier 8CL
See Note 3
See Note 3
See Note 3
1' x 1'
2' x 1'
1.5' x 1'
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
C Pier 9CL C Pier 8CL
C Pier 9CLC Pier 8CL
C Pier 9CL C Pier 8CL
C Pier 9CLC Pier 8CL
C Pier 9CL C Pier 8CL
C Pier 9CLC Pier 8CL installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19231R19
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 10 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 10
C Pier 10
CL
CL
C Pier 9CL
C Pier 9CL
See Note 3
See Note 3
See Note 3
See Note 3
1' x 1'
1' x 1'
1' x 1'
1' x 1'
1.5' x 1'
2' x 1'
See Note 3
4.5' x 1.5' 6' x 1.5'
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
C Pier 10CL C Pier 9CL
C Pier 10CLC Pier 9CL
C Pier 10CL C Pier 9CL
C Pier 10CLC Pier 9CL
C Pier 10CL C Pier 9CL
C Pier 10CLC Pier 9CL installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19232R20
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
Key:
Damaged concrete
Not to Scale
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
C Pier 11
C Pier 11
CL
CL
C Pier 10CL
C Pier 10CL
SPAN 11 REPAIR DETAILS - 1
See Note 3
See Note 3
1' x 3'
3.5' x 3'
3.5' x 3'
3.5' x 3'
1.5' x 2'
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
C Pier 11CL C Pier 10CL
C Pier 11CLC Pier 10CL
C Pier 11CL C Pier 10CL
C Pier 11CLC Pier 10CL installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19233R21
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
Key:
Damaged concrete
Not to Scale
NORTH ELEVATION - BEAM 4
SOUTH ELEVATION - BEAM 4
SOUTH ELEVATION - BEAM 5
NORTH ELEVATION - BEAM 5
C Pier 11
C Pier 11
CL
CL
C Pier 10CL
C Pier 10CL
SPAN 11 REPAIR DETAILS - 2
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
3.5' x 3'
1.5' x 3'
C Pier 11CL C Pier 10CL
C Pier 11CLC Pier 10CL installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19234R22
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 12 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 12
C Pier 12
CL
CL
C Pier 11CL
C Pier 11CL
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
See Note 3
See Note 3
See Note 3
1' x 1'
1' x 1.5'
2.5' x 3.5'
3.5' x 2.5'
C Pier 12CL C Pier 11CL
C Pier 12CLC Pier 11CL
C Pier 12CL C Pier 11CL
C Pier 12CLC Pier 11CL
C Pier 12CL C Pier 11CL
C Pier 12CLC Pier 11CL installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19235R23
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 13 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 13
C Pier 13
CL
CL
C Pier 12CL
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
C Pier 12CL
3.5' x 3'
See Note 3
See Note 3
2' x 1.5'
2' x 1.5'
See Note 3
See Note 3
See Note 3
1' x 2'
C Pier 13CL C Pier 12CL
C Pier 13CLC Pier 12CL
C Pier 13CL C Pier 12CL
C Pier 13CLC Pier 12CL
C Pier 13CL C Pier 12CL
C Pier 13CLC Pier 12CL
See Note 3 installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19236R24
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 14 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 14
C Pier 14
CL
CL
C Pier 13CL
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
C Pier 13CL
2' x 1'
See Note 31' x 1.5'
4.5' x 1.5'
3' x 3' 2' x 1.5'
C Pier 14CL C Pier 13CL
C Pier 14CLC Pier 13CL
C Pier 14CL C Pier 13CL
C Pier 14CLC Pier 13CL
C Pier 14CL C Pier 13CL
C Pier 14CLC Pier 13CL installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19237R25
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 15 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 15
C Pier 15
CL
CL
C Pier 14CL
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
C Pier 14CL
1.5' x 3'
See Note 3
2' x 2' 2.5' x 1'
See Note 3
See Note 3 See Note 3
See Note 3
See Note 3
10' x 1.5' 8.5' x 1.5'
C Pier 15CL C Pier 14CL
C Pier 15CLC Pier 14CL
C Pier 15CL C Pier 14CL
C Pier 15CLC Pier 14CL
C Pier 15CL C Pier 14CL
C Pier 15CLC Pier 14CL installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19238R26
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 16 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 16
C Pier 16
CL
CL
C Pier 15CL
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
C Pier 15CL
See Note 3
1' x 1'
1' x 3'
1' x 1.5'
1' x 1'
See Note 3
1.5' x 1.5'
See Note 3
C Pier 16CL C Pier 15CL
C Pier 16CLC Pier 15CL
C Pier 16CL C Pier 15CL
C Pier 16CLC Pier 15CL
C Pier 16CL C Pier 15CL
C Pier 16CLC Pier 15CL installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19239R27
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 17 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 16C Pier 17 CLCL
C Pier 16CL
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
See Note 3 See Note 3
1' x 1.5'
1' x 1'
2' x 0.5'
C Pier 17CL
C Pier 16C Pier 17 CLCL
C Pier 16CL C Pier 17CL
C Pier 16C Pier 17 CLCL
C Pier 16CL C Pier 17CL
C Pier 16C Pier 17 CLCL
C Pier 16CL C Pier 17CL installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19240R28
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 18 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 18CL
C Pier 17CL
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
C Pier 18CL
C Pier 17CL C Pier 18CL C Pier 17CL
C Pier 17CL C Pier 18CL
C Pier 18CL C Pier 17CL
C Pier 17CL C Pier 18CL
C Pier 18CL C Pier 17CL
C Pier 17CL C Pier 18CL
See Note 3
2' x 1.5'
2' x 1'
2' x 2' 1.5' x 1'
1.5' x 1'
See Note 3 See Note 3 installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19241R29
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 19 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 19CL
C Pier 18CL
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
C Pier 19CL
C Pier 18CL C Pier 19CL C Pier 18CL
C Pier 18CL C Pier 19CL
C Pier 19CL C Pier 18CL
C Pier 18CL C Pier 19CL
C Pier 19CL C Pier 18CL
C Pier 18CL C Pier 19CL
See Note 3
See Note 3
See Note 3
See Note 3
See Note 3 See Note 3See Note 3
2.5' x 1'
2' x 1'
1.5' x 1.5' 2' x 3'
2' x 1.5'
See Note 3 installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19242R30
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 20 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 20CL
C Pier 19CL
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
C Pier 20CL
C Pier 19CL C Pier 20CL C Pier 19CL
C Pier 19CL C Pier 20CL
C Pier 20CL C Pier 19CL
C Pier 19CL C Pier 20CL
C Pier 20CL C Pier 19CL
C Pier 19CL C Pier 20CL
See Note 3
See Note 3
See Note 3
1' x 1.5'
1.5' x 1' 1' x 1.5'
1' x 1.5'
See Note 3 installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19243R31
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SPAN 21 REPAIR DETAILS
Key:
Damaged concrete
Not to Scale
NORTH ELEVATION - BEAM 1
SOUTH ELEVATION - BEAM 1 SOUTH ELEVATION - BEAM 2
NORTH ELEVATION - BEAM 2
SOUTH ELEVATION - BEAM 3
NORTH ELEVATION - BEAM 3
SOUTH ELEVATION - BEAM 4
NORTH ELEVATION - BEAM 4
C Pier 20CL
A C
T U
A L F I L E R
N A
S A S
P A
N
R E P .D
G N
C Pier 20CL
C Pier 20CL
C Pier 20CL
C Pier 20CL
C Pier 20CL
C Pier 20CL
C Pier 20CL
4 SF
1.5' x 1'
See Note 3
See Note 3
Abutment 2
Face of backwall
Abutment 2
Face of backwall
Abutment 2
Face of backwall
Abutment 2
Face of backwall
Abutment 2
Face of backwall
Abutment 2
Face of backwall
Abutment 2
Face of backwall
Abutment 2
Face of backwall installation, as approved by the CO.
foot, or is required for surface preparation for FRP delaminated or spalled concrete exceeds one square
Perform concrete repair only if the area of
Verify condition of concrete before performing repair. 3.
"CONCRETE REPAIR DETAILS" sheet.
Repair damaged concrete as shown in the 2.
damaged concrete in the field.
approximate. Verify dimensions and locations of
Locations and dimensions of damaged concrete are 1.
Notes:
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19244R32
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
SECTION A-A
Not to Scale
11'-0"
27'-0"
13'-6"
39'-0"
6'-0" 6'-0"
CLSymm. about C Abutment
CLSymm. about C Abutment
ABUTMENT REPAIR DETAILS
Footing
Stem
Wingwall (Typ.)
Wingwall (Typ.)
13'-6"
22'-0"
11'-0"
A
A sheet for more details.
abutments. See "TYPICAL SECTION - 60'-0" SPAN"
Clean and reseal deck expansion joint at both 3.
surfaces.
Apply penetrating sealant on exposed concrete 2.
the field prior to construction.
Dimensions are approximate. Verify all dimensions in 1.
Notes:
EXISTING ABUTMENT PLAN
EXISTING ABUTMENT ELEVATION
A C
T U
A L F I L E R
N A
S A
A B
U T
R E P
D T S .D
G N
5'-6"
C BearingCL
1'-0"
VA
STATE PROJECT
NO.
SHEET
DRAWING NO.
NASA
NASA 1(8)
November 2019
19245R33
-N o v -2
1:
P
M M
P R
O J E
C T
S S
P E
C
IA
L N
A S
A n a s a 1(
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s
P
R O J E
C T
S .d
A C
T U
A L F I L E R
N A
S A
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .