This solicitation requests sealed bids for the rehabilitation of the Wallops Island Causeway Bridge over Cat Creek in Accomack County, Virginia. The project includes repairing concrete beams, resealing expansion joints, wrapping concrete beams with glass fiber reinforced polymer, and miscellaneous work. The project will be split into multiple schedules with a total anticipated cost between $1 million to $5 million. Bids are due on a date specified in Block 13a of the solicitation. A pre-bid meeting and site visit will be scheduled. Interested contractors should check www.beta.sam.gov for availability of bid documents and register to receive email notifications. Annual Representations and Certifications must be completed online. Subcontracting plans are required from businesses other than small businesses for contracts over $700,000. The solicitation notes payment and subcontracting plan requirements. Visitors to the agency for bid openings should arrive one hour early and register with security.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Underwater Inspection of
Wallops Island Causeway Bridge
Over Cat Creek
Goddard Space Flight Center Wallops Flight Facility
October 2018
Report Prepared For:
Federal Highway Administration Eastern Federal Lands Highway Division Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166
Report Prepared by:
Marine Solutions, Inc.
23 Fontana Lane, Suite 102 Rosedale, MD 21237
UNDERWATER INSPECTION REPORT
Structure: Wallops Island Causeway Bridge Date Inspected: October 29 & 30, 2018
TABLE OF CONTENTS
General Photos ............................................................................................................................ 3-15
Commentary ............................................................................................................................... 16-19
Overview
Structure Description
Structure Orientation
Structure Access and Inspection
Summary of Findings ............................................................................................................................. 17-18
Recommendations
NBI Condition Bridge Rating Form
Appendix A – Inspection Sketches ...................................................................................................... 1-20
Appendix B – Deficiency Photos ............................................................................................................ 1-9
General Photos
NORTH (DOWNSTREAM) BRIDGE ELEVATION
SOUTH (UPSTREAM) BRIDGE ELEVATION
CHANNEL LOOKING NORTH (DOWNSTREAM)
CHANNEL LOOKING SOUTH (UPSTREAM)
PIER #1 – EAST ELEVATION
PIER #2 – EAST ELEVATION
PIER #3 – EAST ELEVATION
PIER #4 – EAST ELEVATION
PIER #5 – EAST ELEVATION
PIER #6 – EAST ELEVATION
PIER #7 – EAST ELEVATION
PIER #8 – EAST ELEVATION
PIER #9 – EAST ELEVATION
PIER #10 – WEST ELEVATION
WEST FENDER (PIER #10) – EAST ELEVATION
EAST FENDER (PIER #11) – WEST ELEVATION
PIER #11 – EAST ELEVATION
PIER #12 – WEST ELEVATION
PIER #13 – WEST ELEVATION
PIER #14 – WEST ELEVATION
PIER #15 – WEST ELEVATION
PIER #16 – WEST ELEVATION
PIER #17 – WEST ELEVATION
PIER #18 – WEST ELEVATION
PIER #19 – WEST ELEVATION
PIER #20 – WEST ELEVATION
COMMENTARY
OVERVIEW:
Marine Solutions, Inc. (Marine Solutions), was contracted by Clark Nexsen, Inc. to perform an underwater inspection of the Wallops Island Causeway Bridge over Cat Creek at the Goddard Space Flight Center, Wallops Flight Facility at the request of the Federal Highway Administration, Eastern Federal Lands Highway Division, Bridge Inspection and Management Program.
The Wallops Flight Facility is located in Accomack County, Virginia on the Delmarva Peninsula. The Flight Facility is owned by the National Aeronautics and Space Administration (NASA).
The purpose of this inspection was to identify and document all areas of deterioration on the submerged substructure units at and below the high waterline. Then, after determining the range and magnitude of deterioration, provide recommendations and costs to extend the useful life of the structure at its current level of operations.
The underwater inspection was conducted Monday, October 29, 2018 and Tuesday, October 30, 2018. The inspection team included Matt T. Owings, P.E. (Team Leader/Inspection Diver), Jeffery L. Brown II, NICET I (Inspection Diver) and Ryan S. Olevson (Commercial Diver/Tender).
STRUCTURE DESCRIPTION:
Wallops Island Causeway Bridge is a twenty-one span bridge, consisting of twenty 60' long spans and one 83'-6" long span totaling 1283'-6" long. Each typical 60' long span is constructed of a cast-in-place concrete deck supported by four prestressed concrete beams on concrete piers. The 83'-6" span (Span 11) is of similar construction, but has five beams.
The bridge provides the only access to NASA's island facility. There is a weight limit sign near the security gate at the west approach that restricts the weight of unpermitted vehicles crossing the bridge onto the island.
The substructure consists of 20 piers and two concrete abutments. Each pier consists of two 54" diameter prestressed concrete piles and a reinforced concrete pile cap. There are 6'-0" long epoxy filled fiberglass jackets located at most piles approximately 1'-6" above the waterline. A fender system is present on both sides of the channel (Piers 10 and 11) consisting of galvanized H-piles and horizontal timber walers. A timber pile dolphin is located at all for corners of the main channel. All 20 bridge piers were in the water at the time of the inspection. Both abutments were dry, and were not included in the underwater inspection.
STRUCTURE ORIENTATION:
Wallops Island Causeway Bridge is oriented on an east-west alignment with Abutment A at the west end and Abutment B at the east end. Spans 1-21 and Piers 1-20 are numbered from Abutment A. Cat Creek is tidal with ebb flow to the North. There is a navigable channel below Span 11.
STRUCTURE ACCESS AND INSPECTION:
A dive team consisting of commercially trained divers, led by a Virginia-registered Professional Engineer, conducted the underwater inspection. Diving operations were conducted from a 28' aluminum dive vessel utilizing commercial surface-supplied air diving techniques with constant communication between the inspection diver and note taker. Access to the bridge was obtained via the dive vessel launched at a boat ramp located on Chincoteague Island.
The underwater inspection consisted of a Level I visual inspection of 100 percent of the accessible substructure surfaces from the high water mark to the channel bottom. A Level II visual/tactile inspection, which included removing marine growth at the waterline, mid-depth and channel bottom, was performed on 10% of the surface area, at various locations, to facilitate an evaluation of the underlying surfaces and provide an overall condition of the structure. Particular attention was given to observed areas of excessive deterioration or apparent distress, and the condition of previous repairs was noted.
A cursory assessment of the waterway and channel bottom conditions in the vicinity of the bridge was also performed. The type of channel bottom material was noted, as well as the location and extent of observed scour, riprap, or debris.
The waterline was located approximately 1'-6" below the top of the fiberglass jackets at the bridge piers. This corresponds to a reading of 3.8' on the staff gage located on the East Fender System. In addition, a datum of 36.5' was measured from the bottom of the pile cap at Pier 10 to the waterline for future comparison.
SUMMARY OF FINDINGS:
Below is a summary of the findings of the underwater inspection. Detailed findings are contained in the underwater inspection sketches located in Appendix A. Photos for specific deficiencies are located in Appendix B.
SUBSTRUCTURE
Overall, the submerged portions of the substructure are in Fair Condition (NBI Condition Rating = 5). All surfaces below the waterline exhibit marine growth consisting of oyster shells up to 3" thick. See below for additional comments relating to the substructure.
Cylinder Piles:
The piles are in fair condition overall. Below the waterline, the piles exhibited random areas of honeycombing up to 1" diameter x ½" deep (see Photo 1).
The piles at Piers 3-19 have 6'-0" long epoxy filled fiberglass jackets at the waterline. The jackets are in good condition with random, isolated delaminated areas (see Photo 2). The top epoxy bevel of the jackets typically exhibits hairline cracking. The lower 4" to 6" of the jackets at Piers 9-11 is delaminated.
Pier 10 – The South Pile exhibits three hairline vertical cracks on the southeast face: 8'-0" long approximately 1'-7" above the jacket, 6'-2" long at the top of the jacket, and 2'-2" long at the top of the jacket. Adjacent to the cracks on the south face, there is a 3'-0" high x 3'-0" wide epoxy patch above the jacket with edge spalling up to ½" deep (see Photos 3 & 4).
CHANNEL
The channel is in good condition (NBI Condition Rating = 8). When compared to the previous 2015 Underwater Inspection, the current streambed exhibits no significant change. This comparison is limited to the soundings obtained around the substructure units. No noteworthy deficiencies pertaining to the channel or channel protection were observed during the inspection. See below for additional comments relating to the fender system.
Fender System:
The submerged elements of the fender system are in satisfactory condition. The H-piles, access ladders, and hardware exhibit 75% to 100% loss of the galvanized coating at and below the high waterline. From the high waterline to 5'-0" below the high waterline, the underlying exposed steel exhibits moderate to heavy corrosion with less than 10% section loss (see Photos 5-7). Below this area, the underlying exposed steel exhibits minor corrosion with minimal section loss (see Photo 8). The horizontal timber walers exhibit external rot with typical 3/4" pick penetrations (see Photo 9). The lower two walers are typically submerged, and exhibit isolated areas of heavy rot up to 6" diameter x 2" to 4" deep at the end grains and around the hardware connection to the piles. The lower three walers are located at and below the splash zone, and the associated hardware exhibits heavy corrosion with up to 25% section loss (see Photo 10).
The timber pile dolphins are in satisfactory condition. The piles typically exhibit minor to moderate delamination and external rot in the tidal zone with pick penetrations up to 3/4" deep. All piles have 1/16" to 1/4" wide checking throughout. The lower steel cables confining the timber dolphin piles exhibit heavy corrosion with up to 20% section loss (see Photo 11). The north pile at the Northwest Dolphin exhibits a 5'-0" high x 8" wide x 2" deep shake at the waterline with associated rot up to 1" deep (see Photo 12). The timber piles at the Southeast Dolphin exhibit section loss up to 2" deep from 1'-6" to 3'-6" below the high waterline.
RECOMENDATIONS:
This structure is scheduled to be replaced by year 2025. Based on the condition of the structure, and the future structure replacement date, no repairs are recommended at this time.
UNDERWATER INSPECTION
NBI CONDITION BRIDGE RATING FORM
BRIDGE NO: Wallops Island Causeway Bridge
PRINCIPAL ROUTE: VA-803
WATERWAY: Cat Creek
BRIDGE OWNER: Eastern Federal Lands Highway Division
INSPECTORS: Matthew Owings, PE; Jeffery Brown II, NICET IV; Ryan Olevson
INSPECTION DATES: October 29-30, 2018
NBI ITEM CONDITION RATING
60 – SUBSTRUCTURE 5
61 – CHANNEL AND CHANNEL PROTECTION 8
92B – CRITICAL FEATURES INSPECTION Y60
Underwater Inspection Frequency
113 – SCOUR CRITICAL RATING 6
Scour calculation/evaluation not included in this report
Ratings are based on the information provided in the “Recording and Coding Guide for the Structure Inventory and Appraisal of the Nation’s Bridges”, December, 1995.
Appendix A
N S NS
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
CONCRETE PILE CAP (TYP.)
EBB
FLOOD
FLOOD
EBB
WEST ELEVATION EAST ELEVATION
WATERLINE
1.
5' 1.
6'
1.
6'
1.
5'MUDLINE MUDLINE
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 1
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 1
M. OWINGS, P.E.
NOT TO SCALE
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
INSPECTION NOTES:
· NONE
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
AutoCAD SHX Text
VA STATE 803 OVER CAT CREEK
CONCRETE PILE CAP (TYP.)
WEST ELEVATION EAST ELEVATION
WATERLINE
1.
8' 1.
8'
1.
8'
1.
8'MUDLINE MUDLINE
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 2
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 2
M. OWINGS, P.E.
NOT TO SCALE
INSPECTION NOTES:
· NONE
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WEST ELEVATION EAST ELEVATION
WATERLINE EPOXY-FILLED
FIBERGLASS
JACKET
1.
8' 1.
6'
1.
6'
1.
8'
MUDLINE MUDLINE
1.
5'
(T
YP
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 3
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 3
M. OWINGS, P.E.
NOT TO SCALE
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
INSPECTION NOTES:
· NONE
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WEST ELEVATION EAST ELEVATION
WATERLINE
2.
0'
1.
9'
1.
9'
2.
0'
MUDLINE MUDLINE
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
1.
5'
(T
YP
EPOXY-FILLED
FIBERGLASS
JACKET
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 4
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 4
M. OWINGS, P.E.
NOT TO SCALE
INSPECTION NOTES:
· NONE
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WEST ELEVATION EAST ELEVATION
WATERLINE
2.
0' 2.
1'
2.
1'
2.
0'
MUDLINE MUDLINE
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
1.
5'
(T
YP
EPOXY-FILLED
FIBERGLASS
JACKET
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 5
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 5
M. OWINGS, P.E.
NOT TO SCALE
INSPECTION NOTES:
· NONE
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WEST ELEVATION EAST ELEVATION
WATERLINE
2.
1'
2.
1'
2.
1'
2.
1'
MUDLINE MUDLINE
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
1.
5'
(T
YP
EPOXY-FILLED
FIBERGLASS
JACKET
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 6
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 6
M. OWINGS, P.E.
NOT TO SCALE
INSPECTION NOTES:
· NONE
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WEST ELEVATION EAST ELEVATION
WATERLINE
2.
1' 2.
3'
2.
3'
2.
1'
MUDLINE MUDLINE
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
1.
5'
(T
YP
EPOXY-FILLED
FIBERGLASS
JACKET
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 7
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 7
M. OWINGS, P.E.
NOT TO SCALE
INSPECTION NOTES:
· NONE
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WATERLINE
1.
4' 1.
6'
1.
6'
1.
4'
MUDLINE MUDLINE
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
1.
5'
(T
YP
EPOXY-FILLED
FIBERGLASS
JACKET
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 8
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 8
M. OWINGS, P.E.
NOT TO SCALE
INSPECTION NOTES:
· NONE
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WEST ELEVATION EAST ELEVATION
2 (TYP.)
WATERLINE
.7
.7
.7
.7
MUDLINE MUDLINE
1.
5'
(T
YP
6.
0'
(T
YP
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
EPOXY-FILLED
FIBERGLASS
JACKET
1 (TYP.)
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 9
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 9
M. OWINGS, P.E.
NOT TO SCALE
INSPECTION NOTES:
LOWER 4" TO 6" OF JACKET IS DELAMINATED.
RANDOM HONEYCOMBING ON PILE UP TO 1" DIAMETER X
" DEEP ON CONCRETE SURFACES BELOW JACKET.
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WEST ELEVATION EAST ELEVATION
2 (TYP.)
WATERLINE
.1
.3
.3
.1
MUDLINE MUDLINE
EPOXY-FILLED
FIBERGLASS
JACKET (TYP.)
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
1.
5'
(T
YP
.5
D
AT
U
M
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 10
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 10
M. OWINGS, P.E.
NOT TO SCALE
NOTE: FENDER SYSTEM NOT SHOWN.
INSPECTION NOTES:
LOWER 4" TO 6" OF JACKET IS DELAMINATED.
RANDOM HONEYCOMBING ON PILE UP TO 1" DIAMETER X
" DEEP ON CONCRETE SURFACES BELOW JACKET.
SOUTH PILE, SOUTHWEST FACE: 8'-0" LONG HAIRLINE VERTICAL CRACK APPROXIMATELY 1'-7" ABOVE TOP OF JACKET.
SOUTH PILE, SOUTHWEST FACE: 6'-2" LONG HAIRLINE VERTICAL CRACK AT TOP OF JACKET.
SOUTH PILE, SOUTHWEST FACE: 2'-2" LONG HAIRLINE VERTICAL CRACK AT TOP OF JACKET.
SPALLING UP TO
" DEEP.
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
" DEEP ON CONCRETE SURFACES BELOW JACKET.
SOUTH PILE, SOUTHWEST FACE: 8'-0" LONG HAIRLINE VERTICAL CRACK APPROXIMATELY 1'-7" ABOVE TOP OF JACKET.
SOUTH PILE, SOUTHWEST FACE: 6'-2" LONG HAIRLINE VERTICAL CRACK AT TOP OF JACKET.
SOUTH PILE, SOUTHWEST FACE: 2'-2" LONG HAIRLINE VERTICAL CRACK AT TOP OF JACKET.
SOUTH PILE, SOUTH FACE: 3'-0" HIGH x 3'-0" WIDE EPOXY PATCH AT TOP OF JACKET WITH AND DELAMINATION AND EDGE
SPALLING UP TO
" DEEP ON CONCRETE SURFACES BELOW JACKET.
SOUTH PILE, SOUTHWEST FACE: 8'-0" LONG HAIRLINE VERTICAL CRACK APPROXIMATELY 1'-7" ABOVE TOP OF JACKET.
SOUTH PILE, SOUTHWEST FACE: 6'-2" LONG HAIRLINE VERTICAL CRACK AT TOP OF JACKET.
SOUTH PILE, SOUTHWEST FACE: 2'-2" LONG HAIRLINE VERTICAL CRACK AT TOP OF JACKET.
SOUTH PILE, SOUTH FACE: 3'-0" HIGH x 3'-0" WIDE EPOXY PATCH AT TOP OF JACKET WITH AND DELAMINATION AND EDGE
SPALLING UP TO
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WEST ELEVATION EAST ELEVATION
2 (TYP.)
WATERLINE
.9
' 16 .1
.1
.9
MUDLINE MUDLINE
2 (TYP.)
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
1.
5'
(T
YP
EPOXY-FILLED
FIBERGLASS
JACKET
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 11
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 11
M. OWINGS, P.E.
NOT TO SCALE
INSPECTION NOTES:
LOWER 4" TO 6" OF JACKET IS DELAMINATED.
RANDOM HONEYCOMBING ON PILE UP TO 1" DIAMETER X
" DEEP ON CONCRETE SURFACES BELOW JACKET.
NOTE: FENDER SYSTEM NOT SHOWN.
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WEST ELEVATION EAST ELEVATION
WATERLINE
3.
1'
4.
1'
4.
1'
3.
1'MUDLINE MUDLINE
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
1.
5'
(T
YP
EPOXY-FILLED
FIBERGLASS
JACKET
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 12
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 12
M. OWINGS, P.E.
NOT TO SCALE
INSPECTION NOTES:
· NONE
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WEST ELEVATION EAST ELEVATION
WATERLINE
2.
7'
2.
5'
2.
5'
2.
7'
MUDLINE MUDLINE
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
1.
5'
(T
YP
EPOXY-FILLED
FIBERGLASS
JACKET
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 13
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 13
M. OWINGS, P.E.
NOT TO SCALE
INSPECTION NOTES:
· NONE
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WEST ELEVATION EAST ELEVATION
WATERLINE
3.
2' 3.
1'
3.
1'
3.
2'
MUDLINE MUDLINE
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
1.
5'
(T
YP
EPOXY-FILLED
FIBERGLASS
JACKET
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 14
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 14
M. OWINGS, P.E.
NOT TO SCALE
INSPECTION NOTES:
· NONE
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WEST ELEVATION EAST ELEVATION
WATERLINE
3.
4'
3.
2'
3.
2' 3.
4'MUDLINE MUDLINE
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
1.
5'
(T
YP
EPOXY-FILLED
FIBERGLASS
JACKET
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 15
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 15
M. OWINGS, P.E.
NOT TO SCALE
INSPECTION NOTES:
· NONE
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WEST ELEVATION EAST ELEVATION
WATERLINE
3.
2'
3.
3'
3.
3' 3.
2'
MUDLINE MUDLINE
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
1.
5'
(T
YP
EPOXY-FILLED
FIBERGLASS
JACKET
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 16
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 16
M. OWINGS, P.E.
NOT TO SCALE
INSPECTION NOTES:
· NONE
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WEST ELEVATION EAST ELEVATION
WATERLINE
3.
2' 3.
2'
3.
2'
3.
2'MUDLINE MUDLINE
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
1.
5'
(T
YP
EPOXY-FILLED
FIBERGLASS
JACKET
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 17
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 17
M. OWINGS, P.E.
NOT TO SCALE
INSPECTION NOTES:
· NONE
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WEST ELEVATION EAST ELEVATION
WATERLINE
3.
2' 3.
1'
3.
1'
3.
2'MUDLINE MUDLINE
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
1.
5'
(T
YP
EPOXY-FILLED
FIBERGLASS
JACKET
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 18
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 18
M. OWINGS, P.E.
NOT TO SCALE
INSPECTION NOTES:
· NONE
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WEST ELEVATION EAST ELEVATION
WATERLINE
EPOXY-FILLED
FIBERGLASS
JACKET (TYP.)
2.
9'
2.
7' 2.
7'
2.
9'MUDLINE MUDLINE
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
1.
5'
(T
YP
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 19
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 19
M. OWINGS, P.E.
NOT TO SCALE
INSPECTION NOTES:
· NONE
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
WEST ELEVATION EAST ELEVATION
WATERLINE
1.
5'
1.
4'
1.
4'
1.
5'MUDLINE MUDLINE
54"Ø PRE-STRESSED
CONCRETE CYLINDER
PILE (TYP.)
EBB
FLOOD
FLOOD
EBB
ARINEM
SOLUTIONS
REMARKS:
INSPECTION DIVER(S):
INSPECTION DATE(S):
ENGINEER:
SCALE:
PIER 20
ELEVATIONS
JLB,MTO
10/29/18 & 10/30/18
STRUCTURE NO. BRP-1154
WALLOPS ISLAND CAUSEWAY BRIDGE
PIER 20
M. OWINGS, P.E.
NOT TO SCALE
GENERAL NOTES:
· HEAVY MARINE GROWTH CONSISTING OF OYSTER SHELLS UP TO 3" THICK BELOW WATERLINE.
INSPECTION NOTES:
· NONE
AutoCAD SHX Text
2018 UNDERWATER BRIDGE INSPECTION
Appendix B
Appendix B – Deficiency Photos
Photo 1
Pier 11, North Pile – Typical Honeycombing Below Jacket (underwater)
Photo 2
Pier 8, North Pile – Typical Jacket at Waterline.
Photo 3
Pier 10, South Pile, Southwest Face – Hairline Vertical Cracks Above Jacket.
Photo 4
Pier 10, South Pile, South Face – Epoxy Patch with Delamination and Edge Spalling.
Photo 5
West Fender, H-Pile – Typical Corrosion in Splash Zone.
Photo 6
Corrosion in Splash Zone.
Photo 7
Corrosion in the Tidal Zone (underwater).
Photo 8
East Fender, H-Pile – Typical Corrosion on Near Mudline (underwater).
Photo 9
West Fender – Typical Condition of Horizontal Walers
Photo 10
West Fender – Typical Condition of Hardware in Splash Zone
Photo 11
Northwest Dolphin – Typical Condition of Lower Steel Cable Wrap.
Photo 12
Northwest Dolphin, North Pile – 5'-0" High Shake at Waterline.