NASA 1(8)_CPM.pdf
PDF 200 KB Posted
- Solicitation number
- 693C73-20-B-000015
About this file
This document is a solicitation for the rehabilitation of the Wallops Island Causeway Bridge project VA ST NASA 1(8), with solicitation number 693C73-20-B-000015, located in Accomack County, Virginia. The project consists of repairing concrete beams, resealing expansion joints, and repairing the bridge using glass fiber reinforced polymer and other miscellaneous work. The project will be split into multiple work schedules and contract options, with an expected total price between $1,000,000 to $5,000,000. Interested contractors can download bid documents from www.beta.sam.gov beginning on or about May 1, 2020, with bid due dates and locations to be specified. A pre-bid meeting and site visit will also be scheduled. The work is to be completed for the Department of Transportation Federal Highway Administration Eastern Federal Lands Highway Division.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D A
T E
D G
N
Project
Begin x
Work activity to complete activity
Number of work days
Denotes critical path
CPM 99%
Project
End shop drawings
Submit and review material
Order and deliver
25 20
Mobilization
Demobilization
A C
T U
A L F I L E
C P
M
N A
S A .D
G N
Reseal abutment joints
Rewrap PT strands
Repair PT anchorages
Total time: 100 days
Project
Begin
Project
End shop drawings
Submit and review material
Order and deliver
25 20
Mobilization
Demobilization
Reseal abutment joints
Rewrap PT strands
Repair PT anchorages
(piers)
Repair concrete
Total time: 150 days
Project
Begin
Project
End shop drawings
Submit and review material
Order and deliver
25 20
Mobilization
Demobilization
Reseal abutment joints
Rewrap PT strands
Repair PT anchorages
(piers)
Repair concrete
Install GFRP (beams)
Install CFRP (beams)
Repair concrete (beams)
Total time: 175 days
Project
Begin
Project
End shop drawings
Submit and review material
Order and deliver
25 20
Mobilization
10 15 5
Demobilization
Reseal abutment joints
Rewrap PT strands
Repair PT anchorages
(piers)
Repair concrete
(piers)
Install GFRP
Seal concrete
Repair concrete (deck)
Install GFRP (beams)
Install CFRP (beams)
Repair concrete (beams)
Total time: 200 days
SCHEDULE A:
SCHEDULE A+B:
SCHEDULE A+B+C:
SCHEDULE A+B+C+D:
Install GFRP (beams)
Repair concrete (beams)
Install GFRP (beams)
Repair concrete (beams)
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
WALLOPS ISLAND CAUSEWAY BRIDGE OVER CAT CREEK
WALLOPS FLIGHT FACILITY
NOT
FOR
CO
NST
RUCTI
ON
PRE
LIM
INARY