About this file
This document provides details for a federal contract solicitation seeking bids for road repairs and improvements on national forest lands in Virginia. The solicitation seeks sealed bids from certified small businesses for projects including erosion and sediment control, clearing, grading, roadside brushing, installing riprap, road and ditch work, replacing culverts, contractor design of box and arch culverts, and other miscellaneous tasks. The work will be split into multiple schedules with a total expected cost between $5-10 million. Bids are due on a date specified in Block 13a of the solicitation form SF1442, which will be issued on or around May 9, 2023. Interested vendors must register at www.sam.gov to receive email notifications or bid documents. Questions should be directed to the Eastern Federal Lands Highway Division of the US Department of Transportation Federal Highway Administration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLANS FOR PROPOSED
PLANS PREPARED BY
BOTETOURT, CRAIG AND PULASKI COUNTIES, VIRGINIA
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
DESCRIPTION OF PROJECT
Pond Lick Road:
Schedule A
PROJECT LENGTH:
ADT (2022)
ADT (2032)
DHV
%Truck
D
V (MPH)
50/50
1%
SPECIFICATIONS:
DESIGN DESIGNATION:
e(max) N/A
C/A None
< 40
AND TUB RUN ROAD REPAIRS
LIGNITE MINES ROAD, POND LICK ROAD,
PROJECT VA ERFO FS 2018-1(2), 2(1)
VA ERFO FS 2018-1(2), 2(1)
PROJECT
roadside cleanup and other miscellaneous work.
replacement of culverts, ditch reconditioning, riprap, Aggregate surface course, roadway reconditioning, U.S. Department of Transportation
Administration
Federal Highway
LANE MILES:
DISASTER NO. VA2018-1-FS & VA2018-2-FS
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
U.S. DEPARTMENT OF AGRICULTURE
U.S. FOREST SERVICE
GEORGE WASHINGTON AND
JEFFERSON NATIONAL FORESTS
ROAD: WIDTH
9'-18'
11'-15'
SURFACE
6" ASC
6" ASC
ROAD: WIDTH
10'-13'
SURFACE
6" ASCTub Run Road (FS-257)
Lignite Mines Road (FS-180)
Pond Lick Road (FS-202)
APRIL 2023
Project Manager
Y. KIRTLEY
Lead Designer
J. JOHNSON
Highway Design Manager
0 4040
SCALE IN MILES
RICHMOND
ARLINGTON
CHARLOTTESVILLE
FRONT
ROYAL
KEY MAP
STATE OF VIRGINIA
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
N
N/A
None
< 40
50/50
1%
N/A
None
50/50
1%
FS-202 FS-180 FS-257
Title Sheet
DESCRIPTION
INDEX TO SHEETS
SHEET
NO
A01
(FS-202)
Pond Lick Road
(FS-180)
Lignite Mines Road
(FS-257)
Tub Run Road
2.80 miles 8.14 miles 14.20 miles
2.80 8.14 14.20
Lignite Mines Road:
Schedule B miscellaneous work.
reconditioning, riprap, roadside cleanup and other replacement of culverts and headwalls, ditch
Aggregate surface course, roadway reconditioning, miscellaneous work.
reconditioning, riprap, roadside cleanup and other replacement of culverts and headwalls, ditch
Aggregate surface course, roadway reconditioning, PROJECT LENGTH:
ADT (2022)
ADT (2032)
DHV
%Truck
D
V (MPH)
50/50
1%
DESIGN DESIGNATION:
e(max) N/A
C/A None
< 40
LANE MILES:
ROAD: WIDTH
9'-18'
11'-15'
SURFACE
6" ASC
6" ASC
ROAD: WIDTH
10'-13'
SURFACE
6" ASCTub Run Road (FS-257)
Lignite Mines Road (FS-180)
Pond Lick Road (FS-202)
N/A
None
< 40
50/50
1%
N/A
None
50/50
1%
FS-202 FS-180 FS-257
(FS-202)
Pond Lick Road
(FS-180)
Lignite Mines Road
(FS-257)
Tub Run Road
2.80 miles 8.14 miles 14.20 miles
2.80 8.14 14.20
Tub Run Road:
Schedule C
VOLUME 2
POND LICK ROAD (FS 202)
VA ERFO FS 2018-1(2), 2(1)
SCALE IN MILES
0 20 40
N
TUB RUN ROAD (FS 257)
VA ERFO FS 2018-1(2), 2(1)
LIGNITE MINES ROAD (FS 180)
VA ERFO FS 2018-1(2), 2(1)
Cross SectionsT01-T106
A02-A03
A04-A06
A07-A15
A16-A22
B01-B06
C01-C03
C04-C11
D01-D53
K01-K24
M01-M04
M05-M11
M12-M40
S01-S22 (See Volume 1)
(See Volume 1)
(Not Used)
(See Volume 1)
(See Volume 1)
(See Volume 1)
(See Volume 1)
(See Volume 1)
(See Volume 1)
(See Volume 1)
(See Volume 1)
(See Volume 1)
(See Volume 1)
B. DUONG
:2
A
M p r il
U
S S u r2
D fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S
F S
\V A
\2
-1 (2
(1
H W
Y
D E
S \C
A D
D \A
-V A
E R
F O
F S
-1 (2
(1 tt l.
d g n
STATE PROJECT
NUMBER
SHEET
VA VA ERFO FS 2018-1(2), 2(1) A01
116+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
2,200 2,200
2,210 2,210
11625.00
2,203.62 Des Grade =
1:2 .5
-4.0%
.9
.0
116+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
2,200 2,200
2,210 2,210
2,220 2,220
11650.00
2,204.14 Des Grade =
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
POND LICK ROAD - MP 0.31
GEORGE WASHINGTON AND JEFFERSON NATIONAL FORESTS
CROSS SECTIONS
SCHEDULE A
-4.0% 1:3
1:3+4.0%
:1 p r il
P o n d L ic k
H o r A li
M P
.3
.0
S h e e t]
C
U s e rs
\b re n d a .d u o n g
\D e s k to p
\C A
D D
P o n d
L ic k R d \T
-4
V
A E
R F
O F
S
-1
(2
(1
X
S
P o n d
L ic k R d .d g n
VA ERFO FS2018-1(2), 2(1) T14
STATE PROJECT
NUMBER
VA
150+75.00
2,210 2,210
2,220 2,220
2,230 2,230
2,240 2,240
15075.00
2,216.15 Des Grade =
U.S. DEPARTMENT OF TRANSPORTATION
POND LICK ROAD - MP 0.96
GEORGE WASHINGTON AND JEFFERSON NATIONAL FORESTS
CROSS SECTIONS
SCHEDULE A
1:
-4.0%
:1 p r il
P o n d L ic k
H o r
A li
M
P
.9
.0
S h e
U s e rs
\b re n d a .d u o n g
\D e s k to p
\C A
D D
P o n d
L ic k R d \T
-4
V
A E
R F
O F
S
-1
(2
(1
X
S
P o n d
L ic k R d .d g n
VA ERFO FS2018-1(2), 2(1) T31
STATE PROJECT
NUMBER
160+00.00
2,190 2,190
2,200 2,200
2,210 2,210
16000.00
2,192.90 Des Grade =
-4.0%
1:3
160+25.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
2,190 2,190
2,200 2,200
2,210 2,210
16025.00
2,192.90 Des Grade =
U.S. DEPARTMENT OF TRANSPORTATION
POND LICK ROAD - MP 1.13
GEORGE WASHINGTON AND JEFFERSON NATIONAL FORESTS
CROSS SECTIONS
SCHEDULE A
-4.0%
1:3
.2
.9
:1 p r il
P o n d L ic k
H o r A li
M P
.1
.0
S h e
U s e rs
\b re n d a .d u o n g
\D e s k to p
\C A
D D
P o n d
L ic k R d \T
-4
V
A E
R F
O F
S
-1
(2
(1
X
S
P o n d
L ic k R d .d g n
VA ERFO FS2018-1(2), 2(1) T35
STATE PROJECT
NUMBER
361+75.00
2,880 2,880
2,890 2,890
2,900 2,900 36175.00
2,885.36 Des Grade =
-4.0%
1:3
-4.0%
362+00.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
2,880 2,880
2,890 2,890
36200.00
2,883.71 Des Grade =
U.S. DEPARTMENT OF TRANSPORTATION
LIGNITE MINES ROAD - MP 4.8-4.9
GEORGE WASHINGTON AND JEFFERSON NATIONAL FORESTS
SCHEDULE B
-4.0%
:2 p r il
L ig n it e H o z A li M
P .8
.9
.0
S h e
U s e rs
\b re n d a .d u o n g
\D e s k to p
\C A
D D
L ig n it e M in e s R d \T
-8
V
A E
R F
O F
S
-1
(5
(1
X
S
L ig n it e M in e s R d .d g n
VA ERFO FS2018-1(2), 2(1) T69
STATE PROJECT
NUMBER
363+25.00
2,870 2,870
2,880 2,880
2,890 2,890
36325.00
2,873.40 Des Grade =
-4.0%
1:3
363+50.00
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
2,870 2,870
2,880 2,880
36350.00
2,871.99 Des Grade =
U.S. DEPARTMENT OF TRANSPORTATION
LIGNITE MINES ROAD - MP 4.8-4.9
GEORGE WASHINGTON AND JEFFERSON NATIONAL FORESTS
SCHEDULE B
-4.0%
:2 p r il
L ig n it e H o z A li M
P .8
.9
.0
S h e
U s e rs
\b re n d a .d u o n g
\D e s k to p
\C A
D D
L ig n it e M in e s R d \T
-8
V
A E
R F
O F
S
-1
(5
(1
X
S
L ig n it e M in e s R d .d g n
VA ERFO FS2018-1(2), 2(1) T72
STATE PROJECT
NUMBER
460+60.00
1,880 1,880
1,890 1,890
1,900 1,900
1,910 1,910
46060.00
1,897.65 Des Grade =
U.S. DEPARTMENT OF TRANSPORTATION
TUB RUN ROAD - MP 6.8
GEORGE WASHINGTON AND JEFFERSON NATIONAL FORESTS
CROSS SECTIONS
SCHEDULE C
-5.5%
:5
P p r il
T u b R u n H o z A il M
P .8
.0
S h e
U s e rs
\b re n d a .d u o n g
\D e s k to p
\C A
D D
T u b R u n
R d
\T
-1
V
A E
R F
O F
S
-1
(2
(1
X
S
T u b R u n
R d
.d g n
VA ERFO FS 2018-1(2), 2(1) T102
STATE PROJECT
NUMBER
460+75.00
1,880 1,880
1,890 1,890
1,900 1,900
1,910 1,91046075.00
1,896.01 Des Grade =
U.S. DEPARTMENT OF TRANSPORTATION
TUB RUN ROAD - MP 6.8
GEORGE WASHINGTON AND JEFFERSON NATIONAL FORESTS
CROSS SECTIONS
SCHEDULE C
+4.0% -4.0%
:5 p r il
T u b R u n H o z A il M
P .8
.0
S h e
U s e rs
\b re n d a .d u o n g
\D e s k to p
\C A
D D
T u b R u n
R d
\T
-1
V
A E
R F
O F
S
-1
(2
(1
X
S
T u b R u n
R d
.d g
VA ERFO FS 2018-1(2), 2(1) T103
461+00.00
1,880 1,880
1,890 1,890
1,900 1,900
46100.00
1,894.43 Des Grade =
U.S. DEPARTMENT OF TRANSPORTATION
TUB RUN ROAD - MP 6.8
GEORGE WASHINGTON AND JEFFERSON NATIONAL FORESTS
CROSS SECTIONS
SCHEDULE C
-4.0%
:2 p r il
T u b R u n H o z A il M
P .8
.0
S h e
U s e rs
\b re n d a .d u o n g
\D e s k to p
\C A
D D
T u b R u n
R d
\T
-1
V
A E
R F
O F
S
-1
(2
(1
X
S
T u b R u n
R d
.d g
VA ERFO FS 2018-1(2), 2(1) T104
461+25.00
1,880 1,880
1,890 1,890
1,900 1,900
1,910 1,910
46125.00
1,894.42 Des Grade =
U.S. DEPARTMENT OF TRANSPORTATION
TUB RUN ROAD - MP 6.8
GEORGE WASHINGTON AND JEFFERSON NATIONAL FORESTS
CROSS SECTIONS
SCHEDULE C
+4.0% -4.0%-4.0%
:2 p r il
T u b R u n H o z A il M
P .8
.0
S h e
U s e rs
\b re n d a .d u o n g
\D e s k to p
\C A
D D
T u b R u n
R d
\T
-1
V
A E
R F
O F
S
-1
(2
(1
X
S
T u b R u n
R d
.d g
VA ERFO FS 2018-1(2), 2(1) T105
461+40.00
1,880 1,880
1,890 1,890
1,900 1,900
1,910 1,910
46140.00
1,895.10 Des Grade =
U.S. DEPARTMENT OF TRANSPORTATION
TUB RUN ROAD - MP 6.8
GEORGE WASHINGTON AND JEFFERSON NATIONAL FORESTS
CROSS SECTIONS
SCHEDULE C
-3.0%
:5 p r il
T u b R u n H o z A il M
P .8
.0
S h e
U s e rs
\b re n d a .d u o n g
\D e s k to p
\C A
D D
T u b R u n
R d
\T
-1
V
A E
R F
O F
S
-1
(2
(1
X
S
T u b R u n
R d
.d g
VA ERFO FS 2018-1(2), 2(1) T106
File details come from the government source that posted it. Updated .